﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - South Central Region News</title>
    <link>http://www.wsdot.wa.gov/Regions/SouthCentral/news/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Sun, 08 Nov 2009 20:48:01 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - South Central Region News</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/Regions/SouthCentral/news/</link>
    </image>
    <item>
      <title>WSDOT moves onto SR 410 Nile Valley landslide for continued monitoring</title>
      <pubDate>Fri, 06 Nov 2009 07:00:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/11/05_SR410monitorlandslide.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/11/05_SR410monitorlandslide.htm</guid>
      <description>Today, WSDOT and contractor crews started building rough access trails to access the landslide that covered SR 410 with millions of cubic yards of debris three weeks ago. These trails will allow geotechnical experts to bring in off-road drill rigs.</description>
    </item>
    <item>
      <title>WSDOT latest cable median barrier performance report now online</title>
      <pubDate>Wed, 04 Nov 2009 06:06:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/11/2009cablebarrierreport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/11/2009cablebarrierreport.htm</guid>
      <description>WSDOT's latest cable median barrier performance report now online</description>
    </item>
    <item>
      <title>WSDOT seeks bids for second construction contract of I-90 Snoqualmie Pass East Project</title>
      <pubDate>Tue, 03 Nov 2009 03:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/11/02_WSDOTseeksbidsforI90IProject.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/11/02_WSDOTseeksbidsforI90IProject.htm</guid>
      <description>WSDOT is gearing up to tackle the second construction contract of an interstate improvement project on I-90 east of Snoqualmie Pass, and is requesting bids from contractors to re-construct the corridor.</description>
    </item>
    <item>
      <title>WSDOT wraps up busy I-90 Snoqualmie Pass construction season</title>
      <pubDate>Fri, 30 Oct 2009 01:51:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/WSDOTwrapsupbusyI-90constructionseason.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/WSDOTwrapsupbusyI-90constructionseason.htm</guid>
      <description>Motorists driving on I-90 east of Snoqualmie Pass will experience a smoother, safer ride as WSDOT and contractor crews wrap up construction on the first phase of the Lake Easton to Bullfrog project this week. The $18.4 million concrete rehabilitation project is one of five American Recovery and Reinvestment Act (ARRA)-funded projects on I-90 this year.</description>
    </item>
    <item>
      <title>WSDOT holds Contractor Meet and Greet event Oct. 30 in Seattle</title>
      <pubDate>Wed, 28 Oct 2009 03:48:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/27_2009meetandgreet.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/27_2009meetandgreet.htm</guid>
      <description>WSDOT holds Contractor Meet and Greet event Oct. 30 in Seattle</description>
    </item>
    <item>
      <title>Winter days and darker evenings mean a greater risk to pedestrians and bicyclists</title>
      <pubDate>Tue, 27 Oct 2009 23:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/27_bikeandpedestriansafety.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/27_bikeandpedestriansafety.htm</guid>
      <description>Winter days and darker evenings mean a greater risk to pedestrians and bicyclists</description>
    </item>
    <item>
      <title>WSDOT begins building new SR 410 detour away from river and landslide; Yakima County continues to modify the river channel</title>
      <pubDate>Sat, 24 Oct 2009 00:00:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/23-WSDOT+begins+building+SR+410+detour.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/23-WSDOT+begins+building+SR+410+detour.htm</guid>
      <description>WSDOT and contractor crews started construction on the SR 410 temporary winter-durable detour around a section of SR 410 that was damaged by a massive landslide on Oct. 11. The new route will replace the emergency detour on Nile Loop Road.</description>
    </item>
    <item>
      <title>Record-setting heat just a memory – fall and winter have arrived</title>
      <pubDate>Fri, 23 Oct 2009 02:45:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/22_winter_driving_chains.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/22_winter_driving_chains.htm</guid>
      <description>When the 80, 90 and 100-degree days are replaced with wind and record-setting rain, it’s clear fall has arrived and winter is just around the corner.</description>
    </item>
    <item>
      <title>WSDOT lifts ‘residents only’ restrictions on emergency detour for landslide closure on SR 410</title>
      <pubDate>Wed, 21 Oct 2009 02:32:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/20_SR410update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/20_SR410update.htm</guid>
      <description>WSDOT and contractor crews today opened the emergency route around the landslide closure on SR 410 to all drivers. Previously only local residents with identification could use the emergency route on Nile Loop Road.</description>
    </item>
    <item>
      <title>WSDOT accelerates plans to work on a temporary roadway for the winter and continues work on emergency route around SR 410 landslide for local residents</title>
      <pubDate>Sat, 17 Oct 2009 07:45:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/landslideupdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/landslideupdate.htm</guid>
      <description>Five days after a massive landslide blocked SR 410 with millions of cubic yards of debris, WSDOT and contractor crews continue work to build a temporary emergency access road for local residents of the Nile Valley and have accelerated plans for a new, more durable detour route around the SR 410 landslide.</description>
    </item>
    <item>
      <title>WSDOT moves closure points on SR 410 and establishes telephone hotline for up-to-date information</title>
      <pubDate>Wed, 14 Oct 2009 05:15:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/410telephonehotlineandclosureinfo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/410telephonehotlineandclosureinfo.htm</guid>
      <description>Hunters and other outdoor enthusiasts will be happy to know WSDOT has shortened the SR 410 closure from 47 miles to four miles after a massive landslide on October 11, 2009. Currently, SR 410 is closed from milepost 104, the west intersection of the Nile Loop Road, and at milepost 108, the east intersection of the Nile Loop Road.</description>
    </item>
    <item>
      <title>Gov. Gregoire proclaims emergency in Yakima County due to State Route 410 damage</title>
      <pubDate>Wed, 14 Oct 2009 04:22:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/13_SR410Proclamation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/13_SR410Proclamation.htm</guid>
      <description>Gov. Chris Gregoire today proclaimed an emergency in Yakima County because of damage to State Route 410 west of Naches.</description>
    </item>
    <item>
      <title>WSDOT improves safety by changing stop sign location at 16th Avenue and US 12 in Yakima</title>
      <pubDate>Wed, 14 Oct 2009 03:13:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/16thAvenuestopsignlocation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/16thAvenuestopsignlocation.htm</guid>
      <description>On Wednesday, Oct. 14, WSDOT traffic engineers, in agreement with the City of Yakima and the Washington State Patrol, will remove the stop sign at the end of the westbound off-ramp from US 12 to 16th Avenue, and install a new stop sign on 16th Avenue where it intersects with the US 12 off and on-ramps.</description>
    </item>
    <item>
      <title>WSDOT crews working on safe, temporary route on SR 410 for locals</title>
      <pubDate>Tue, 13 Oct 2009 06:24:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/12_SR410_eve_update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/12_SR410_eve_update.htm</guid>
      <description>WSDOT crews are working to re-establish a temporary route around the damaged section of SR 410 west of Naches, with the goal of safe access to Yakima for the 600 homes and businesses along SR 410.</description>
    </item>
    <item>
      <title>Landslide closes section of SR 410 Chinook Pass</title>
      <pubDate>Mon, 12 Oct 2009 06:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/LandslideclosesSR410Chinook+Pass.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/LandslideclosesSR410Chinook+Pass.htm</guid>
      <description>Landslide closes section of SR 410 Chinook Pass</description>
    </item>
    <item>
      <title>Governor Gregoire joins B.C. Premier Campbell to celebrate Amtrak Cascades second train service to Vancouver, B.C.</title>
      <pubDate>Sat, 10 Oct 2009 03:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/09_AmtrakSecondTrainEvent.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/09_AmtrakSecondTrainEvent.htm</guid>
      <description>In an effort to promote cross border travel and a long standing partnership, Washington Gov. Chris Gregoire and British Columbia Premier Gordon Campbell joined together to celebrate the start of the long awaited second Amtrak Cascades train service to Vancouver, B.C.</description>
    </item>
    <item>
      <title>WSDOT reminds candidates to keep right-of-way clear for traffic signs</title>
      <pubDate>Thu, 08 Oct 2009 01:31:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/07_no_signs_in_rightofway.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/07_no_signs_in_rightofway.htm</guid>
      <description>The Washington State Department of Transportation reminds candidates and supporters to watch where they post political campaign signs: only traffic control signs are allowed in the right-of-way.</description>
    </item>
    <item>
      <title>Washington applies for more than $1.3 billion in second round of ARRA High Speed Intercity Passenger Rail grants</title>
      <pubDate>Tue, 06 Oct 2009 04:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/05_ARRAPassengerRailTrack2.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/05_ARRAPassengerRailTrack2.htm</guid>
      <description>Washington applies for more than $1.3 billion in second round of ARRA High Speed Intercity Passenger Rail grants</description>
    </item>
    <item>
      <title>Number of completed Recovery Act highway projects on the rise</title>
      <pubDate>Thu, 01 Oct 2009 05:07:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/30_ARRAMonthlyWrapUp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/30_ARRAMonthlyWrapUp.htm</guid>
      <description>As the summer construction season winds down, the number of completed Recovery Act projects is beginning to climb. In September WSDOT and local governments across Washington completed an additional 30 Recovery Act highway projects, bringing the reported number of completed projects to 38.</description>
    </item>
    <item>
      <title>WSDOT upgrades cameras on I-90 Snoqualmie Pass for nighttime viewing</title>
      <pubDate>Tue, 29 Sep 2009 22:40:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/snoqualmiepasscameras.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/snoqualmiepasscameras.htm</guid>
      <description>The Washington State Department of Transportation has expanded its ability to monitor roadway conditions and help the public plan their trips on I-90 across Snoqualmie Pass during nighttime hours.</description>
    </item>
    <item>
      <title>Highway fatalities lowest since 1955</title>
      <pubDate>Thu, 24 Sep 2009 03:05:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/23_TrafficFatalities.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/23_TrafficFatalities.htm</guid>
      <description>Traffic fatalities in Washington have hit their lowest level since 1955, according to new data from the Washington Department of Transportation and the Washington Traffic Safety Commission.</description>
    </item>
    <item>
      <title>Washington’s annual survey of bicyclists and pedestrians starts next week, Sept. 29</title>
      <pubDate>Mon, 21 Sep 2009 23:34:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/2009BikePedCount.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/2009BikePedCount.htm</guid>
      <description>Washington’s annual survey of bicyclists and pedestrians starts next week, Sept. 29</description>
    </item>
    <item>
      <title>Local transportation projects recognized by FHWA and WSDOT as 2009 “Award of Excellence” winners</title>
      <pubDate>Mon, 21 Sep 2009 22:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/21_2009AwardsofExcellence.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/21_2009AwardsofExcellence.htm</guid>
      <description>Local transportation projects recognized by FHWA and WSDOT as 2009 “Award of Excellence” winners</description>
    </item>
    <item>
      <title>WSDOT’s quarterly performance report finds progress on highway safety</title>
      <pubDate>Sat, 19 Sep 2009 02:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/18_GrayNotebookUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/18_GrayNotebookUpdate.htm</guid>
      <description>An analysis of highways before and after the installation of centerline rumble strips shows a 57 percent reduction in serious injury and fatal crossover collisions.</description>
    </item>
    <item>
      <title>Third project on US 12 near White Pass begins Sept. 21</title>
      <pubDate>Fri, 18 Sep 2009 04:19:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/17_ThirdUS12ProjectBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/17_ThirdUS12ProjectBegins.htm</guid>
      <description>WHITE PASS – Drivers can expect delays on US 12 near White Pass as the Washington State Department of Transportation (WSDOT) begins construction on the last of three projects on US 12 between the Cortwright Creek Bridge in Lewis County and the Lewis/Yakima county line.</description>
    </item>
    <item>
      <title>Washington seeks Recovery Act TIGER grants for three high priority projects</title>
      <pubDate>Wed, 16 Sep 2009 05:16:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/15_TigerGrants.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/15_TigerGrants.htm</guid>
      <description>The Washington State Department of Transportation submitted applications for three high priority projects in King County, Vancouver, and Spokane to compete for the $1.5 billion available in TIGER Discretionary Grants, part of the federal American Recovery and Reinvestment Act (ARRA).</description>
    </item>
    <item>
      <title>WSDOT asks drivers to plan ahead and expect long delays on I-90 east of Snoqualmie Pass</title>
      <pubDate>Wed, 16 Sep 2009 04:37:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/15_I90BullfrogConcreteProject.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/15_I90BullfrogConcreteProject.htm</guid>
      <description>From now until November, motorists traveling over I-90 east of Snoqualmie Pass should prepare for delays and traffic backups that could add up to one additional hour of travel time to their trip.</description>
    </item>
    <item>
      <title>Scenic and Recreational Highways Plan meeting to be held in Wenatchee</title>
      <pubDate>Fri, 11 Sep 2009 01:30:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/10WenatcheeScenicHwyMtg.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/10WenatcheeScenicHwyMtg.htm</guid>
      <description>There's a Scenic and Recreational Highways Plan meeting in Wenatchee on Sept. 24.</description>
    </item>
    <item>
      <title>Southbound US 395 closes for nine days starting Sept. 11</title>
      <pubDate>Thu, 10 Sep 2009 05:40:43 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/Southbound_US395_closes_nine_days.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/Southbound_US395_closes_nine_days.htm</guid>
      <description>WSDOT closes southbound US 395 in Kennewick for nine days starting Sep. 11</description>
    </item>
    <item>
      <title>Spent Labor Day weekend home? You weren’t the only one</title>
      <pubDate>Wed, 09 Sep 2009 06:21:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/8_laborday09_recap.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/8_laborday09_recap.htm</guid>
      <description>It could have been the rain, wind, economy or school calendar. Whatever the reason, the result was clear. There were fewer vehicles on the road in most places for Labor Day 2009.</description>
    </item>
    <item>
      <title>As summer vacation ends, long-term closures on I-90 begin</title>
      <pubDate>Tue, 08 Sep 2009 23:03:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/lakeeastontobullfrogclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/lakeeastontobullfrogclosures.htm</guid>
      <description>Just when you thought construction was winding down for the season, crews are getting ready to kick it into high gear on I-90 after Labor Day</description>
    </item>
    <item>
      <title>Gov. Gregoire highlights transportation workers on Labor Day</title>
      <pubDate>Fri, 04 Sep 2009 23:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/4_GregoireLaborDay.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/4_GregoireLaborDay.htm</guid>
      <description>In honor of Labor Day, Gov. Christine Gregoire signed a proclamation encouraging state residents to celebrate Washington transportation workers.</description>
    </item>
    <item>
      <title>US 97 Beebe Bridge at Chelan Falls may be closed for weeks</title>
      <pubDate>Fri, 04 Sep 2009 00:46:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/03US97BeebeBridgeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/03US97BeebeBridgeClosure.htm</guid>
      <description>The US 97 Beebe Bridge at Chelan Falls remains closed to vehicles and pedestrians until repairs can be made as a result damage from a truck collision on Monday.</description>
    </item>
    <item>
      <title>The travelers’ end of summer assignment: Know before you go this Labor Day Weekend</title>
      <pubDate>Wed, 02 Sep 2009 01:38:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/1_LaborDay2009travel.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/1_LaborDay2009travel.htm</guid>
      <description>WSDOT offers many ways to know before you go this Labor Day weekend.</description>
    </item>
    <item>
      <title>Delivering on the Recovery Act: More highway projects under way, and construction workforce continues to grow</title>
      <pubDate>Tue, 01 Sep 2009 04:57:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/31_AugustRecoveryActReport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/31_AugustRecoveryActReport.htm</guid>
      <description>Delivering on the Recovery Act: More highway projects under way, and construction workforce continues to grow

More than 135 highway projects awarded or under way in Washington state.</description>
    </item>
    <item>
      <title>First North Spokane Corridor segment opens to traffic</title>
      <pubDate>Sat, 29 Aug 2009 00:34:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/28_us395nscsegmentopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/28_us395nscsegmentopens.htm</guid>
      <description>First US 395 North Spokane Corridor segment opens to traffic</description>
    </item>
    <item>
      <title>Washington applies for nearly $435 million in first round of ARRA High Speed Intercity Passenger Rail grants</title>
      <pubDate>Tue, 25 Aug 2009 03:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/24_ARRAHighSpeedRailTrack1application.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/24_ARRAHighSpeedRailTrack1application.htm</guid>
      <description>Washington applies for nearly $435 million in first round of ARRA High Speed Intercity Passenger Rail grants</description>
    </item>
    <item>
      <title>Second Amtrak Cascades train to Vancouver, B.C. begins service August 19</title>
      <pubDate>Thu, 13 Aug 2009 01:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/08122009_AmtrakCascadessecondtrain.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/08122009_AmtrakCascadessecondtrain.htm</guid>
      <description>Second Amtrak Cascades train to Vancouver, B.C. 
begins service August 19</description>
    </item>
    <item>
      <title>Annual survey needs volunteers to count bicyclists and pedestrians</title>
      <pubDate>Wed, 12 Aug 2009 23:16:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/volunteersBike-PedCount.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/volunteersBike-PedCount.htm</guid>
      <description>Annual survey needs volunteers throughout WA to count bicyclists and pedestrians</description>
    </item>
    <item>
      <title>WSDOT kicks off construction of the I-90 Snoqualmie Pass East project to improve safety and reliability of vital cross-state route</title>
      <pubDate>Wed, 12 Aug 2009 05:30:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/I90Kickoffevent.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/I90Kickoffevent.htm</guid>
      <description>The Washington State Department of Transportation today began construction on the I-90 Snoqualmie Pass East project (I-90 Project), a project that will build five miles of wider, safer and more reliable highway for east-west travelers.</description>
    </item>
    <item>
      <title>WSDOT adds new tools to deliver real-time traffic information</title>
      <pubDate>Tue, 11 Aug 2009 02:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/10_trafficinfo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/10_trafficinfo.htm</guid>
      <description>OLYMPIA – Now it is even easier to know before you go. The Washington State Department of Transportation has added new tools to deliver real-time traffic and incident information to Northwest motorists.</description>
    </item>
    <item>
      <title>WSDOT wins national recognition for durable, long-lasting pavement</title>
      <pubDate>Fri, 07 Aug 2009 05:06:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/06_PavementAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/06_PavementAward.htm</guid>
      <description>To the motoring public, smoothness is chief among the factors of what makes a good roadway pavement. To the Washington State Department of Transportation (WSDOT), it is smooth pavement that lasts.</description>
    </item>
    <item>
      <title>WSDOT wraps up US 12, White Pass paver this week</title>
      <pubDate>Tue, 04 Aug 2009 04:31:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/US12_WhitePassPaverComplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/US12_WhitePassPaverComplete.htm</guid>
      <description>WHITE PASS – Drivers on US 12 will enjoy a smoother, safer drive over White Pass as the Washington State Department of Transportation wraps up a paving project on Wednesday, Aug. 5.</description>
    </item>
    <item>
      <title>First North Spokane Corridor segment opens to traffic August 22</title>
      <pubDate>Thu, 30 Jul 2009 00:57:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/07/29_us395nscopening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/07/29_us395nscopening.htm</guid>
      <description>First North Spokane Corridor segment opens to traffic August 22</description>
    </item>
    <item>
      <title>Stimulus work on the rise for highway projects</title>
      <pubDate>Wed, 29 Jul 2009 04:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/07/28_JulyStimulusreport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/07/28_JulyStimulusreport.htm</guid>
      <description>New employment data from state and local highway contractors showed Recovery Act work in Washington state doubled from May to June as more projects get awarded and underway.</description>
    </item>
    <item>
      <title>WSDOT awards contracts for statewide cable barrier and rumble strip projects</title>
      <pubDate>Tue, 28 Jul 2009 01:19:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/07/27_ARRACableRumbleContracts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/07/27_ARRACableRumbleContracts.htm</guid>
      <description>WSDOT is moving forward with projects to improve safety on 33 highways across Washington. The 2009 American Recovery and Reinvestment Act (ARRA) provided $12 million in funding for installing centerline rumble strips on 662 miles of state highways and for retrofitting nearly 30 miles of cable median barrier. Together, these projects will help support approximately 120 jobs during construction.</description>
    </item>
    <item>
      <title>Help WSDOT signal crews get bicycles and motorcycles moving</title>
      <pubDate>Fri, 24 Jul 2009 22:50:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/07/24_bike_motorcyle_signals.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/07/24_bike_motorcyle_signals.htm</guid>
      <description>WSDOT is looking for comments from bicyclists and motorcycle drivers who notice when traffic detection systems at state-operated traffic signals do not “detect” them.</description>
    </item>
    <item>
      <title>Western states’ transportation directors name Hammond as association president</title>
      <pubDate>Fri, 17 Jul 2009 03:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/07/16_WASHTOPresident.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/07/16_WASHTOPresident.htm</guid>
      <description>Washington Transportation Secretary Paula Hammond was unanimously elected by transportation directors from 18 states to serve as president of the Western Association of State Highway and Transportation Officials (WASHTO) during the organization's annual meeting this week in Seattle.</description>
    </item>
    <item>
      <title>US 12 White Pass paving project begins July 16</title>
      <pubDate>Thu, 16 Jul 2009 04:10:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/07/15_US12WhitePassPavingBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/07/15_US12WhitePassPavingBegins.htm</guid>
      <description>WHITE PASS – Construction begins Thursday, July 16 on a Washington State Department of Transportation (WSDOT) project to provide drivers a smoother, safer ride over US 12 White Pass.</description>
    </item>
    <item>
      <title>Transportation Secretary Hammond leads western states in highlighting progress on stimulus project spending</title>
      <pubDate>Wed, 15 Jul 2009 03:35:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/07/14_SecLeadsStates.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/07/14_SecLeadsStates.htm</guid>
      <description>Transportation Secretary Paula Hammond and state department of transportation directors from 17 states hosted a news conference today highlighting the rapid pace of delivering federal Recovery Act jobs and highway projects bolstering the nation’s economic recovery.</description>
    </item>
  </channel>
</rss>