North Central Region Projects


2016 Projects -

• Deck rehabilitation of four bridges on SR 153 between Methow and Carlton.
• Chip sealing: US 2 between Farmer and Coulee City, US 97A from Olds Station to Entiat, US 97 from Twin W Orchards to the Beebe Bridge and a section of SR 17.
• Installation of electronic message signs and traffic cameras on US 2 at the west end of Leavenworth and Coles Corner.
• Curve warning signs, centerline and shoulder rumble strips, electrical and communications upgrades all over the region.
• There are also two projects in South Central Region our engineering office is building for them: a paver on I-90 from Ellensburg to Ryegrass and the Vantage Bridge painter.
• Our staff also continues designing several of the federal court mandated fish passage barrier removal projects in Western Washington.


 Click to enlarge
Click to view entire map.  It shows where region projects are scheduled in 2016.

For a higher resolution map: NCR 2016 construction map .pdf 1559 KB

North Central Region Completed Projects 

2015 Projects - complete
  • NCR 13-15 Guardrail Update
  • NCR 13-15 Sign Update
  • SR 17/S of Othello-Intersection Improvements
  • US 97A/Entiat Pedestrian Improvements
  • ITS backup power/VMS replacements
  • SR 281/S. of Quincy @ Rd. 9 NW-Intersection Improvement
  • US 2/97-SR28-Eastmont double left turn revision
  • NCR Seal 2015
  • SR 285/CO Wenatchee Area Paving