Schrag Eastbound (I-90)
Schrag Westbound (I-90)
Sprague Lake Eastbound (I-90)
Sprague Lake Westbound (I-90)
Dodge Junction (US 12)
Alpowa Summit Eastbound (US 12)
Alpowa Summit Westbound (US 12)
Dusty (SR 26)
Hatton Coulee (US 395)
Horn School (US 195)
Winchester Eastbound (I-90)
Winchester Westbound (I-90)
SR 125, Milepost 6.15 to 23.67 NB and SB, Loads over 10' wide require 3 pilots
I-90, MP 231.23- Bridge Height is 15'
SR 12, MP 360.28 WB & EB, Overweight - Use centerline
SR 26, MP 132.94 WB & EB, 20,500 lb per axle limit
SR 261, Milepost 14.8 - NB & SB, 20,000 lb per axle limit
SR 195, MP 37.46, 18,500 lbs per axle weight limit
SR 12, MP 323.06 WB & EB, 19,500 lb per axle limit
SR 26, MP 40.44 WB & EB, 19,000 lb per axle wt. limit
SR 12, MP 294.51 WB, 21,500 lb per axle limit
SR 261, MP 57.9 NB & SB, 19,000 lb per axle limit
I-90, MP 222.82- Bridge Height is 15'10"
I-90, MP 222.82- Bridge Height is 15'1"
I-90, MP 231.23- Bridge Height is 14'7"
I-90 EB, MP 226.39-Bridge Height is 14'2"
I-90 EB, MP 231.23-Bridge Height is 15'4"
SR 26, Milepost 132.50, No loads over 15'8 High
Hwy 12, MP 307.31, both directions. 20,000 lbs per axles
Hwy 12, MP 372.57, No axle to exceed 20,000 lbs
SR 17 NB and SB, MP 7.43 to MP 10.02 - 12' wide restriction
I-90 EB, MP 221.95, All loads travel centerline of the Bridge
SR 21, MP 28.78 NB & SB, 17,500 lb per axle wt. limit
I-82, MP 132.6 WA/OR Line into WA - No loads over 15'6 high.
US 395, Milepost 13.05 to 20.57 NB and SB, No loads over 10' wide.
SR 124, Milepost 0 to 44.98 EB and WB, 3 Pilots required over 12' wide