﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - 2011</title>
    <link>http://www.wsdot.wa.gov/News/2011/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Tue, 21 May 2013 18:40:29 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - 2011</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/News/2011/</link>
    </image>
    <item>
      <title>Ground breaks on West Coast Electric Highway</title>
      <pubDate>Thu, 29 Dec 2011 04:19:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/12/28_BellinghamEVcharging.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/12/28_BellinghamEVcharging.htm</guid>
      <description>The future of long-distance, zero-emissions travel begins right in Bellingham, where construction is starting on the state’s first public charging station that can recharge electric vehicles in 30 minutes.

It’s the first sign of a border-to-border network of public electric-vehicle charging stations and the first stop on Washington’s segment of the West Coast Electric Highway along 276 miles of Interstate 5 between the state’s borders with Oregon and Canada.</description>
    </item>
    <item>
      <title>White Christmas? Pack patience and tire chains</title>
      <pubDate>Thu, 22 Dec 2011 02:56:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/12/21_chirstmastravel2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/12/21_chirstmastravel2011.htm</guid>
      <description>A white Christmas? Could be – at least in the mountains. Travelers should plan to pack tire chains and a winter kit alongside presents before hitting the road.</description>
    </item>
    <item>
      <title>Hillside work closes I-5 lane south of Bellingham</title>
      <pubDate>Fri, 09 Dec 2011 01:02:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/12/08_i5hillsiderepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/12/08_i5hillsiderepairs.htm</guid>
      <description>Hillside work closes one lane of I-5 near Bellingham starting next week as crews remove loose rocks and trees from the slope above, and in particular one very large rock described as being the size of a motor home.</description>
    </item>
    <item>
      <title>Comments sought on four-year program of transportation projects</title>
      <pubDate>Sat, 03 Dec 2011 06:20:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/12/Draft2012STIP.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/12/Draft2012STIP.htm</guid>
      <description>Comments sought on four-year program of transportation projects</description>
    </item>
    <item>
      <title>Public comments sought on rural and special needs mobility programs</title>
      <pubDate>Sat, 03 Dec 2011 03:20:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/12/02_RuralandSpecialNeedsPrograms.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/12/02_RuralandSpecialNeedsPrograms.htm</guid>
      <description>Public comments sought on rural and special needs mobility programs</description>
    </item>
    <item>
      <title>SR 20 – North Cascades Highway closes for winter</title>
      <pubDate>Tue, 22 Nov 2011 08:45:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/21SR20NCHcloses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/21SR20NCHcloses.htm</guid>
      <description>Last Tuesday's temporary closure becomes permanent due to increasing avalanche danger.</description>
    </item>
    <item>
      <title>Federal rail funding advances King Street Station restoration</title>
      <pubDate>Tue, 22 Nov 2011 06:30:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/21_KingStreetStationfunding.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/21_KingStreetStationfunding.htm</guid>
      <description>The Washington State Department of Transportation and the Federal Railroad Administration signed agreements today, Nov. 21, securing $16.7 million in federal high-speed-rail funds to support the next phase of the King Street Station restoration project. The station is the busiest in the Pacific Northwest, serving nearly half a million Amtrak Cascades passengers in 2010.</description>
    </item>
    <item>
      <title>What makes a good holiday trip? Knowing before you go</title>
      <pubDate>Sat, 19 Nov 2011 02:13:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/18_Thanksgiving2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/18_Thanksgiving2011.htm</guid>
      <description>As the holidays draw near and temperatures drop, the Washington State Department of Transportation has tips on how to be ready for winter weather driving and avoid Thanksgiving holiday weekend highway backups.</description>
    </item>
    <item>
      <title>Seattle shipyard selected to build new Eastern Washington ferry</title>
      <pubDate>Fri, 18 Nov 2011 01:11:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/17_KellerFerry.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/17_KellerFerry.htm</guid>
      <description>Foss Maritime Co. of Seattle will build a replacement 20-car state ferry to operate on Lake Roosevelt, a remote location requiring the ferry be built in sections and transported across the state.</description>
    </item>
    <item>
      <title>SR 20 North Cascades Highway temporarily closing</title>
      <pubDate>Wed, 16 Nov 2011 07:36:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/15SR20NCHwyTempClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/15SR20NCHwyTempClosure.htm</guid>
      <description>SR 20, The North Cascades Highway is closing at 8 p.m. Tuesday Nov. 15 due to forecast heavy snowstorms.  Reopening will be reassessed Monday.</description>
    </item>
    <item>
      <title>Wind, snow, avalanche danger close Chinook and Cayuse passes</title>
      <pubDate>Tue, 15 Nov 2011 05:00:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/Chinookandcayuseclosed2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/Chinookandcayuseclosed2011.htm</guid>
      <description>Several feet of snowfall over the weekend sent Chinook (State Route 410) and Cayuse (State Route 123) passes into hibernation for the season.</description>
    </item>
    <item>
      <title>I-5 paving north of Burlington takes winter break</title>
      <pubDate>Fri, 11 Nov 2011 05:55:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/10_Inter5JoeLearyWinterBreak.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/10_Inter5JoeLearyWinterBreak.htm</guid>
      <description>Crews working for WSDOT repaired and repaved nearly 24 lane miles of northbound I-5 this year between Burlington and Lake Samish, smoothing and preserving the highway for drivers.</description>
    </item>
    <item>
      <title>Federal transportation grants put rides a click away for veterans in Washington</title>
      <pubDate>Fri, 11 Nov 2011 00:32:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/10-Federal_vets_grants.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/10-Federal_vets_grants.htm</guid>
      <description>The Federal Transit Administration today announced the Washington State Department of Transportation will receive three grants totaling more than $737,000 to be distributed to selected veterans transportation projects. The grants are of the product of the Veterans Transportation and Community Living Initiative.</description>
    </item>
    <item>
      <title>New Keller Ferry closer to reality with today’s bid opening</title>
      <pubDate>Wed, 09 Nov 2011 04:55:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/08_KellerFerry.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/08_KellerFerry.htm</guid>
      <description>Foss Maritime Co. of Seattle is the apparent low bidder to build a new 20-car Keller Ferry to serve Washington’s only ferry route east of the Cascade Mountains.</description>
    </item>
    <item>
      <title>Huge gate installed at SR 520 pontoon construction site</title>
      <pubDate>Sat, 05 Nov 2011 02:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/SR520PCPgate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/SR520PCPgate.htm</guid>
      <description>Huge gate installed at SR 520 pontoon construction site</description>
    </item>
    <item>
      <title>Washington’s TIGER III applications focus on mobility, environment and multimodal connections</title>
      <pubDate>Fri, 04 Nov 2011 06:47:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/11/03_TIGER3.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/11/03_TIGER3.htm</guid>
      <description>Washington’s TIGER III applications focus on mobility, environment and multimodal connections</description>
    </item>
    <item>
      <title>New roundabout open on Mount Baker Highway near Deming</title>
      <pubDate>Fri, 28 Oct 2011 05:59:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/27_sr542smithroundaboutopen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/27_sr542smithroundaboutopen.htm</guid>
      <description>Crews completed paving and opened a new roundabout today, helping make it easier and safer to turn on and off Mount Baker Highway at East Smith Road.</description>
    </item>
    <item>
      <title>Snow crews ready for La Niña double-dip</title>
      <pubDate>Fri, 28 Oct 2011 05:03:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/27_snowcrewsreadyforlanina.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/27_snowcrewsreadyforlanina.htm</guid>
      <description>Weather experts are predicting La Niña is back for a double dip – and that means road crews and drivers should be prepared for another challenging winter. No matter what the weather brings, highway crews are ready for whatever blows in.</description>
    </item>
    <item>
      <title>Tires, chains, being prepared - hot accessories this winter</title>
      <pubDate>Thu, 27 Oct 2011 00:00:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/26_2011_winter_ready.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/26_2011_winter_ready.htm</guid>
      <description>As the season’s fashion changes from shorts and sandals to umbrellas and scarves, don’t forget to update that other winter wardrobe – your vehicle’s.</description>
    </item>
    <item>
      <title>Eastbound lanes open to traffic as rock blasting and construction wrap for winter on I-90 over Snoqualmie Pass</title>
      <pubDate>Fri, 21 Oct 2011 21:32:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/I-90eblanesopentotraffic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/I-90eblanesopentotraffic.htm</guid>
      <description>The delays drivers experienced this week on Interstate 90 over Snoqualmie Pass are over. The new eastbound lanes opened to traffic just after 7 a.m. today.</description>
    </item>
    <item>
      <title>I-5 congestion relief work wins national award</title>
      <pubDate>Wed, 19 Oct 2011 00:24:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/18_OperationI5WinsNationalAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/18_OperationI5WinsNationalAward.htm</guid>
      <description>I-5 congestion relief work wins national award</description>
    </item>
    <item>
      <title>Crews close single lane of eastbound I-90 over Snoqualmie Pass for six days</title>
      <pubDate>Sat, 15 Oct 2011 01:03:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/sixdayclosureonI90.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/sixdayclosureonI90.htm</guid>
      <description>Drivers face delays of up to two hours or more on Snoqualmie Pass next week when crews close one lane of eastbound Interstate 90 for six days straight in preparation for opening a brand new section of highway.</description>
    </item>
    <item>
      <title>Commute Smart Awards celebrates 20 years</title>
      <pubDate>Wed, 12 Oct 2011 05:17:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/11_CSA_Awards.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/11_CSA_Awards.htm</guid>
      <description>Two decades of saving commuters money, curbing air pollution, conserving fuel and easing traffic congestion were celebrated today at the 2011 Governor’s Commute Smart Awards.</description>
    </item>
    <item>
      <title>WSDOT crane tips during bridge removal in Lewis County</title>
      <pubDate>Mon, 10 Oct 2011 05:28:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/CranetipsLewisCounty.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/CranetipsLewisCounty.htm</guid>
      <description>MESKILL, Lewis County – A truck-mounted crane tipped over today while crews from the Washington State Department of Transportation and Lewis County were working to remove sections from a 180-foot bridge over the Chehalis River. Three minor injuries were reported in the accident.</description>
    </item>
    <item>
      <title>Bridge over troubled water opens on SR 20 near Lyman</title>
      <pubDate>Sat, 08 Oct 2011 01:40:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/07_RedCabinCrkBridgeOpen.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/07_RedCabinCrkBridgeOpen.htm</guid>
      <description>The Washington State Department of Transportation and contractor Interwest Construction Inc. of Burlington opened the new SR 20 Red Cabin Creek bridge on Thursday afternoon, Sept. 6.</description>
    </item>
    <item>
      <title>New map helps drivers go with flow on Snoqualmie Pass</title>
      <pubDate>Tue, 04 Oct 2011 23:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/10_04I90flowmaps.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/10_04I90flowmaps.htm</guid>
      <description>Are you heading for recreation areas in eastern Washington or to the big cities on the west side this weekend? Regardless of which side of the state you pick, the Washington State Department of Transportation (WSDOT) is making it easier for you to plan your trip over Snoqualmie Pass</description>
    </item>
    <item>
      <title>Washington celebrates Walk to School month</title>
      <pubDate>Tue, 04 Oct 2011 04:43:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/10/10_03WalktoSchool.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/10/10_03WalktoSchool.htm</guid>
      <description>Washington celebrates Walk to School month</description>
    </item>
    <item>
      <title>Targeted investments reduce congestion; continued improvements needed to rebuild economy</title>
      <pubDate>Sat, 24 Sep 2011 01:15:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/23_2011CongestionReport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/23_2011CongestionReport.htm</guid>
      <description>Puget Sound drivers probably won’t be surprised to learn that the most improved commute route in 2010 was the northbound Interstate 405 morning commute between Tukwila and Bellevue.</description>
    </item>
    <item>
      <title>WSDOT saves lives, money with risk management program</title>
      <pubDate>Thu, 22 Sep 2011 23:39:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/09_23RiskMgtJLARC.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/09_23RiskMgtJLARC.htm</guid>
      <description>WSDOT saves lives, money with risk management program</description>
    </item>
    <item>
      <title>U.S. Department of Transportation Announces $31 Million to Improve Rail Service in Washington State</title>
      <pubDate>Thu, 22 Sep 2011 01:22:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/21_USDOTAnnouncesAmtrakCascadesFunding.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/21_USDOTAnnouncesAmtrakCascadesFunding.htm</guid>
      <description>U.S. Transportation Secretary Ray LaHood today announced $31.1 million for the State of Washington to improve intercity passenger and freight rail service on the Amtrak Cascades line.</description>
    </item>
    <item>
      <title>Steel bridges inspected after nationwide FHWA recommendation</title>
      <pubDate>Sat, 17 Sep 2011 05:07:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/16_steelbridgesreviewed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/16_steelbridgesreviewed.htm</guid>
      <description>A review of state bridge-inspection records shows that 10 bridges made with AASHTO M270 steel in Washington state are in safe condition for daily travelers.</description>
    </item>
    <item>
      <title>Narrows Bridge toll equipment reading new Good To Go! passes</title>
      <pubDate>Fri, 16 Sep 2011 03:32:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/15_tnbequipmentreadingnewpasses.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/15_tnbequipmentreadingnewpasses.htm</guid>
      <description>Narrows Bridge toll equipment reading new Good To Go! passes</description>
    </item>
    <item>
      <title>Congestion relief on I-5 earns WSDOT national kudos</title>
      <pubDate>Thu, 15 Sep 2011 01:27:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/14_I5_CongestionReliefEarnsWSDOTKudos.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/14_I5_CongestionReliefEarnsWSDOTKudos.htm</guid>
      <description>Congestion relief on I-5 earns WSDOT national kudos 
Solution to Lacey/DuPont morning commuter woes nets award nomination</description>
    </item>
    <item>
      <title>Contractor selected for next I-90 project east of Snoqualmie Pass</title>
      <pubDate>Sat, 10 Sep 2011 00:28:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/09_I90contractorselected.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/09_I90contractorselected.htm</guid>
      <description>For the last year, construction crews have been transforming a 50-year-old stretch of Interstate 90, east of Snoqualmie Pass, into a modern, wider and safer transportation corridor. And now, even more improvements are set to begin this month that will improve an additional two miles of I-90.</description>
    </item>
    <item>
      <title>WSDOT gearing up to catch the next TIGER</title>
      <pubDate>Fri, 02 Sep 2011 00:18:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/01_TIGER3grants.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/01_TIGER3grants.htm</guid>
      <description>OLYMPIA – Rounds one and two provided close to 1,500 jobs and now the Washington State Department of Transportation (WSDOT) is gearing up for TIGER 3.</description>
    </item>
    <item>
      <title>Local transportation projects receive Awards of Excellence</title>
      <pubDate>Fri, 02 Sep 2011 00:11:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/09/01_2001AwardsofExcellence.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/09/01_2001AwardsofExcellence.htm</guid>
      <description>Local transportation projects achieved excellence in safety enhancements, construction, innovative design, environmental sustainability and community involvement, earning 2011 Awards of Excellence.</description>
    </item>
    <item>
      <title>Mark your calendar - Nine-day closure of the SR 99 Alaskan Way Viaduct begins Oct. 21</title>
      <pubDate>Mon, 29 Aug 2011 23:18:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/9dayViaductClosureStartsOct21.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/9dayViaductClosureStartsOct21.htm</guid>
      <description>A nine-day closure of the State Route 99 Alaskan Way Viaduct will mark the beginning of the end for Seattle’s double-deck highway.</description>
    </item>
    <item>
      <title>Updated CRC estimate cuts project cost by $100 million</title>
      <pubDate>Sat, 27 Aug 2011 02:14:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/26_CRC_CutsProjectCost.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/26_CRC_CutsProjectCost.htm</guid>
      <description>The estimated construction cost for the Columbia River Crossing project decreased by $100 million due to recent decisions and increased certainty on the construction schedule.</description>
    </item>
    <item>
      <title>Travel tools available to ease the pain of Labor Day travel</title>
      <pubDate>Fri, 26 Aug 2011 22:33:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/26_LaborDay_2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/26_LaborDay_2011.htm</guid>
      <description>Labor Day is the year’s busiest travel weekend over Snoqualmie Pass on Interstate 90, and it’s not the only location in Washington that will feel the strain of additional travelers.</description>
    </item>
    <item>
      <title>Learn about proposed Amtrak Cascades reroute at open house</title>
      <pubDate>Fri, 26 Aug 2011 05:00:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/25_RailPDBOpenHouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/25_RailPDBOpenHouse.htm</guid>
      <description>Rerouting Amtrak Cascades trains from a waterfront Point Defiance route to a lesser-used inland route will improve reliability and lead to faster, more frequent service.</description>
    </item>
    <item>
      <title>SR 520 bridge tolling to begin in December</title>
      <pubDate>Thu, 25 Aug 2011 23:54:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/25_SR520TollingStartsDecember.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/25_SR520TollingStartsDecember.htm</guid>
      <description>Tolling on State Route 520 across Lake Washington, which will help pay to replace the vulnerable, 50-year-old floating bridge, will start in December.</description>
    </item>
    <item>
      <title>WSDOT website, 511 information line unavailable Saturday night</title>
      <pubDate>Thu, 25 Aug 2011 22:56:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/25_website_outage.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/25_website_outage.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) website, which receives more than 100,000 visits per day in the summer months, will get a much-needed update Saturday night</description>
    </item>
    <item>
      <title>Federal Highway Administration approves SR 99 tunnel to replace Alaskan Way Viaduct</title>
      <pubDate>Wed, 24 Aug 2011 02:45:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/23_awv-rod.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/23_awv-rod.htm</guid>
      <description>After 10 years of environmental review and analysis, the Federal Highway Administration (FHWA) today signed a record of decision allowing the Washington State Department of Transportation (WSDOT) to begin final design and construction of the State Route 99 tunnel beneath downtown Seattle. The tunnel will replace the double-deck Alaskan Way Viaduct along Seattle’s waterfront.</description>
    </item>
    <item>
      <title>I-90 project recognized nationally for environmental partnerships</title>
      <pubDate>Fri, 19 Aug 2011 23:11:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/I90partnershipaward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/I90partnershipaward.htm</guid>
      <description>The Federal Highway Administration will award the Washington State Department of Transportation (WSDOT) the 2011 Environmental Excellence Award for the I-90 Snoqualmie Pass East Project on Monday, Aug. 22. The award recognizes transportation projects, processes and people who incorporate environmental stewardship into project planning and development.</description>
    </item>
    <item>
      <title>Join an autumn tradition: help count bicyclists and pedestrians in Washington state</title>
      <pubDate>Wed, 17 Aug 2011 23:41:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/2011BikePedCount.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/2011BikePedCount.htm</guid>
      <description>Join an autumn tradition: help count bicyclist and pedestrians in Washington state</description>
    </item>
    <item>
      <title>Bids opened for new SR 520 floating bridge</title>
      <pubDate>Thu, 11 Aug 2011 02:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/10_SR520BridgeABV.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/10_SR520BridgeABV.htm</guid>
      <description>SEATTLE – Kiewit-General-Manson, A Joint Venture, submitted the apparent best combination of bid price and technical proposal for replacing the aging and vulnerable State Route 520 floating bridge, according to tallies calculated today by the Washington State Department of Transportation.</description>
    </item>
    <item>
      <title>SR 548 to close for 18 days near Blaine</title>
      <pubDate>Wed, 10 Aug 2011 04:21:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/9_SR548FishCulvert.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/9_SR548FishCulvert.htm</guid>
      <description>BLAINE – WSDOT crews will close all lanes of State Route 548 beginning Aug. 15, for 18 days to install a fish-friendly culvert beneath the highway.</description>
    </item>
    <item>
      <title>More of scenic Mount Baker Highway opens Friday</title>
      <pubDate>Fri, 05 Aug 2011 02:51:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/04_sr542roadtoheathermeadows.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/04_sr542roadtoheathermeadows.htm</guid>
      <description>Just in time for the gorgeous summer weather that has finally arrived, an additional mile of scenic Mount Baker Highway opens Friday morning, Aug. 5, giving visitors access to the Heather Meadows visitor center. The road has been closed since October because of deep snow.</description>
    </item>
    <item>
      <title>SR 20 reduced to one lane north of Coupeville</title>
      <pubDate>Wed, 03 Aug 2011 02:58:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/08/02_sr20arnoldroadclosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/08/02_sr20arnoldroadclosure.htm</guid>
      <description>State Route 20 on Whidbey Island will be down to one lane for 60 hours this week while crews complete roadwork that will help realign Arnold Road to improve sight distance and ultimately driver safety.</description>
    </item>
    <item>
      <title>Take the scenic route to avoid 2-hour delays on US 12 this summer</title>
      <pubDate>Tue, 30 Aug 2011 22:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/Take_scenic_route_avoid_delays_on_US12.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/Take_scenic_route_avoid_delays_on_US12.htm</guid>
      <description>Rock blasting operations have been completed on US 12 near White Pass


The roadway is open in both directions</description>
    </item>
    <item>
      <title>WSDOT awards $1.1 million in first round of 2011-2013 Airport Aid grants</title>
      <pubDate>Tue, 02 Aug 2011 03:11:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/01_airportgrants.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/01_airportgrants.htm</guid>
      <description>ARLINGTON– Twenty-six Washington airports will receive a share of nearly $12 million in federal, state and local funds to maintain airport pavements, improve safety and enhance security. Of that amount the Washington State Department of Transportation (WSDOT) contributed $1.1 million through its Airport Aid Program, and used $433,290 in state funds to leverage more than $9 million in federal grants.</description>
    </item>
    <item>
      <title>Northbound I-5 reopens near Burlington</title>
      <pubDate>Fri, 29 Jul 2011 23:09:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/29_I5secnd87HourOver.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/29_I5secnd87HourOver.htm</guid>
      <description>During the 87-hour I-5 lane closure, WSDOT replaced two bridge approaches, repaired several bridge decks and reinforced 2.5 miles of aging concrete panels by tying them together with 6,000 steel dowel bars.</description>
    </item>
    <item>
      <title>Rail agreement expected to generate jobs and lead to improved Amtrak Cascades service</title>
      <pubDate>Fri, 29 Jul 2011 00:32:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/28_BNSFAgreement.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/28_BNSFAgreement.htm</guid>
      <description>An agreement signed today by the Washington State Department of Transportation (WSDOT) and BNSF Railway clears the way for work to begin on rail improvements that ultimately will generate hundreds of jobs and improve Amtrak Cascades service between Seattle and Portland.</description>
    </item>
    <item>
      <title>Environment and transportation go hand-in-hand</title>
      <pubDate>Thu, 28 Jul 2011 23:10:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/EnvironmentalAward_28.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/EnvironmentalAward_28.htm</guid>
      <description>It’s not always just about building roads and bridges. Often, transportation projects also help rebuild communities and improve the surrounding environment. The Washington State Department of Transportation (WSDOT) was recently recognized for its successes in sustainable transportation and environmental protection.</description>
    </item>
    <item>
      <title>Amtrak Cascades ‘Cash Train’ Scratch ticket partnership with Washington’s Lottery a success</title>
      <pubDate>Wed, 27 Jul 2011 06:43:19 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/07262011_AmtrakCascadesLotteryresults.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/07262011_AmtrakCascadesLotteryresults.htm</guid>
      <description>Amtrak Cascades Cash Train Scratch ticket promotion with Lottery a success.</description>
    </item>
    <item>
      <title>I-5 reduced to one lane all week from Burlington to Bellingham</title>
      <pubDate>Fri, 22 Jul 2011 03:14:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/21_2ndI5Closure87Hour.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/21_2ndI5Closure87Hour.htm</guid>
      <description>Twelve miles of Interstate 5 will be reduced to one lane from Burlington to Bellingham for a week starting Monday, July 25. And it could take an hour or more to drive through the construction.</description>
    </item>
    <item>
      <title>Travelers choosing Amtrak Cascades in record numbers</title>
      <pubDate>Thu, 21 Jul 2011 03:24:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/07202011AmtrakCascadesRidership.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/07202011AmtrakCascadesRidership.htm</guid>
      <description>Amtrak Cascades second quarter ridership for 2011.</description>
    </item>
    <item>
      <title>WSDOT seeks comments on Disadvantaged Business Enterprise contracting goals</title>
      <pubDate>Sat, 16 Jul 2011 04:37:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/15_DBEgoalsAug2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/15_DBEgoalsAug2011.htm</guid>
      <description>Contractors, trade and labor organizations, small and disadvantaged businesses, and others who are interested in doing business with the Washington State Department of Transportation (WSDOT) are invited to comment on the agency’s proposed interim Disadvantaged Business Enterprise (DBE) goals.</description>
    </item>
    <item>
      <title>Washington selects AeroVironment to light up nation’s first electric highway</title>
      <pubDate>Wed, 13 Jul 2011 22:04:24 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/13_ElectricHighways.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/13_ElectricHighways.htm</guid>
      <description>The Washington Department of Transportation (WSDOT) announces that within six months, drivers will have the ability to charge their electric cars (like the Nissan LEAF and Chevrolet Volt) at charge stations along Washington’s “electric highways” (I-5 and US 2).  Now it’s easy to plug in your electric car while you’re on the go in Washington!</description>
    </item>
    <item>
      <title>New roundabout in the works on Mount Baker Highway</title>
      <pubDate>Wed, 13 Jul 2011 01:23:47 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/12_sr542roundabout.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/12_sr542roundabout.htm</guid>
      <description>Construction began this week on a new roundabout that will soon make it easier and safer to turn on and off State Route 542, Mount Baker Highway, at the busy Smith Road intersection near Deming.</description>
    </item>
    <item>
      <title>First pour complete in SR 520 pontoon casting basin</title>
      <pubDate>Sat, 09 Jul 2011 04:21:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/07/08_first_pour_520_pontoons.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/07/08_first_pour_520_pontoons.htm</guid>
      <description>First pour complete in SR 520 pontoon casting basin</description>
    </item>
    <item>
      <title>WSDOT fleet named one of the best in North America</title>
      <pubDate>Fri, 01 Jul 2011 02:49:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/30_WSDOTtop100fleet.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/30_WSDOTtop100fleet.htm</guid>
      <description>The Washington State Department of Transportation’s (WSDOT) work to make its fleet of large equipment, trucks and other work vehicles more efficient and sustainable is paying it off. It’s one of North America’s top 100 public fleets, according to Government Fleet magazine.</description>
    </item>
    <item>
      <title>Snow 50 feet deep still buries road to Artist Point</title>
      <pubDate>Fri, 01 Jul 2011 02:12:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/30_artistpointclosed.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/30_artistpointclosed.htm</guid>
      <description>Snow 50 feet deep still buries the road (State Route 542) to Artist Point at Mount Baker and will keep the upper portion of the road closed all summer.</description>
    </item>
    <item>
      <title>Round one complete: I-5 opens on time near Burlington</title>
      <pubDate>Sat, 25 Jun 2011 00:13:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/i5_24i-5opensontime.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/i5_24i-5opensontime.htm</guid>
      <description>Just in time for the weekend and right on schedule, all lanes of northbound Interstate 5 reopened this morning at 10 a.m. after a week of work and closures that restricted the highway to one lane between Burlington and Bellingham.</description>
    </item>
    <item>
      <title>I-90 signs answer the question: 'Just how much longer until we get there?'</title>
      <pubDate>Thu, 23 Jun 2011 22:31:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/6_23_I90traveltimesigns.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/6_23_I90traveltimesigns.htm</guid>
      <description>Are we there yet? The days of wondering how long it’s going to take to reach Snoqualmie Pass are now over. Today, the Washington State Department of Transportation (WSDOT) officially unveiled three electronic signs on Interstate 90 for real-time travel time between North Bend and Ellensburg.</description>
    </item>
    <item>
      <title>SR 9 closed all weekend for bridge repairs in Deming</title>
      <pubDate>Tue, 21 Jun 2011 23:49:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/21_sr9closedallweekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/21_sr9closedallweekend.htm</guid>
      <description>At 56 years old, the Smith Creek overflow bridge along State Route 9 in Deming could use a few repairs to keep it smooth for drivers. The highway will close the weekend of June 24 while crews do the work.</description>
    </item>
    <item>
      <title>I-5 near Burlington reduced to one lane</title>
      <pubDate>Fri, 17 Jun 2011 01:25:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/16_Burli-5DayClosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/16_Burli-5DayClosures.htm</guid>
      <description>Northbound Interstate 5 will be down to one lane for 87 hours straight beginning June 20 while crews complete complex road and bridge repairs north of Burlington. Drivers should expect lengthy delays during the afternoon commute and should consider alternate routes or alternate commute times.</description>
    </item>
    <item>
      <title>Students win top prize in statewide I-90 transportation art and essay contest</title>
      <pubDate>Mon, 13 Jun 2011 23:37:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/BridgingFuturesWinners.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/BridgingFuturesWinners.htm</guid>
      <description>Two Washington state students won top honors for their participation in the seventh annual Interstate 90 Bridging Futures Art and Essay Contest.</description>
    </item>
    <item>
      <title>I-5 speed limit drops near Burlington as work picks up</title>
      <pubDate>Sat, 11 Jun 2011 02:24:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/10_I5BurlSpeedDrops.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/10_I5BurlSpeedDrops.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) will temporarily reduce the speed limit from 70 mph to 60 mph between Burlington and Bellingham starting Tuesday, June 14.</description>
    </item>
    <item>
      <title>Celebrating 10 years of transparency in transportation</title>
      <pubDate>Fri, 10 Jun 2011 04:18:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/GrayNotebook10thAnniversary.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/GrayNotebook10thAnniversary.htm</guid>
      <description>Celebrating 10 years of transparency in transportation 
Gray Notebook highlights safety, freight, and winter weather operations</description>
    </item>
    <item>
      <title>Southern mile of Alaskan Way Viaduct to be demolished six months early</title>
      <pubDate>Sat, 04 Jun 2011 03:17:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/060311_AWV.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/060311_AWV.htm</guid>
      <description>A section of the seismically-vulnerable Alaskan Way Viaduct is now scheduled for demolition this October, six months ahead of schedule. The southern mile of the viaduct is coming down early after the Washington State Department of Transportation (WSDOT) and its contractor, Skanska USA Civil, found ways to streamline the project schedule and save money.</description>
    </item>
    <item>
      <title>Work to lengthen I-5 ramp in Bellingham starts next week</title>
      <pubDate>Sat, 04 Jun 2011 02:24:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/03_i5rampworkstarts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/03_i5rampworkstarts.htm</guid>
      <description>A longer Samish Way on-ramp soon will make it easier to merge onto northbound I-5 in Bellingham.</description>
    </item>
    <item>
      <title>WSDOT investigating glitches in Tacoma Narrows Bridge toll-collection operations</title>
      <pubDate>Fri, 03 Jun 2011 04:10:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/06/2_GlitchesTNBTollCollection.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/06/2_GlitchesTNBTollCollection.htm</guid>
      <description>WSDOT investigating glitches in Tacoma Narrows Bridge toll-collection operations</description>
    </item>
    <item>
      <title>Safety improvements coming to SR 20 at Arnold Road on Whidbey Island</title>
      <pubDate>Thu, 26 May 2011 00:21:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/25_SR20ArnoldRD.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/25_SR20ArnoldRD.htm</guid>
      <description>Crews will make safety improvements this summer on SR 20 south of Oak Harbor. WSDOT hired Interwest Construction to make the improvements. Construction is expected to begin in June and should finish by fall.</description>
    </item>
    <item>
      <title>Washington still 'most bicycle-friendly state'</title>
      <pubDate>Wed, 25 May 2011 05:40:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/05_24WABikeFriendlyState.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/05_24WABikeFriendlyState.htm</guid>
      <description>Washington still 'most bicycle-friendly state'</description>
    </item>
    <item>
      <title>North Cascades Highway reopens at noon Wednesday</title>
      <pubDate>Tue, 24 May 2011 06:29:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/23SR20SpringReopening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/23SR20SpringReopening.htm</guid>
      <description>SR 20, The North Cascades Highway will open to traffic at noon on Wednesday, May 25</description>
    </item>
    <item>
      <title>Work to lengthen I-5 ramp starts next week in Bellingham</title>
      <pubDate>Fri, 20 May 2011 04:22:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/19_i5lakewayrampwork.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/19_i5lakewayrampwork.htm</guid>
      <description>A longer Lakeway Drive on-ramp soon will make it easier for drivers to merge onto southbound I-5 in Bellingham.</description>
    </item>
    <item>
      <title>WSDOT seeks input for overall Disadvantaged Business Enterprise goal setting</title>
      <pubDate>Fri, 20 May 2011 03:48:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/DBEGoalSetMeeting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/DBEGoalSetMeeting.htm</guid>
      <description>WSDOT seeks input for overall Disadvantaged Business Enterprise goal setting</description>
    </item>
    <item>
      <title>Only chance of Memorial Day weekend sun but traffic guaranteed</title>
      <pubDate>Fri, 20 May 2011 03:04:03 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/19_memorialday2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/19_memorialday2011.htm</guid>
      <description>While many people still can’t decide if they need sandals or snow boots for Memorial Day weekend, it’s always the right decision to check your route before you go.</description>
    </item>
    <item>
      <title>North Cascades Highway, Cayuse Pass may open by Memorial Day weekend; no estimate for Chinook Pass opening</title>
      <pubDate>Sat, 14 May 2011 05:08:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/Crews_battle_snow_avalanches_in_mountains.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/Crews_battle_snow_avalanches_in_mountains.htm</guid>
      <description>North Cascades Highway, Cayuse Pass may open by Memorial Day weekend; no estimate for Chinook Pass opening</description>
    </item>
    <item>
      <title>I-90 Snoqualmie Pass project wins conservation award from Cascade Land Conservancy</title>
      <pubDate>Fri, 13 May 2011 03:13:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/12_I90conservationaward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/12_I90conservationaward.htm</guid>
      <description>The Cascade Land Conservancy presented its Innovative Conservation Project award to the Washington State Department of Transportation’s I-90 Snoqualmie Pass East Project (I-90 project) during its annual Conservation Awards Breakfast today in Seattle.</description>
    </item>
    <item>
      <title>I-5 travelers get a brighter greeting in Vancouver this weekend</title>
      <pubDate>Thu, 12 May 2011 01:12:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/11_WelcomeToWashingtonSignPlanting.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/11_WelcomeToWashingtonSignPlanting.htm</guid>
      <description>VANCOUVER – Even if the weather isn’t sunny this weekend, Interstate 5 drivers headed north from Oregon will still get a bright greeting thanks to local volunteers planting the “Welcome to Washington” sign near Fourth Plain Boulevard.</description>
    </item>
    <item>
      <title>Washington commended for showing taxpayers where their transportation dollars go</title>
      <pubDate>Thu, 12 May 2011 00:38:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/11_PerformanceMeasures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/11_PerformanceMeasures.htm</guid>
      <description>Washington commended for showing taxpayers where their transportation dollars go</description>
    </item>
    <item>
      <title>Rock Blasting is back on I-90 east of Snoqualmie Pass</title>
      <pubDate>Wed, 11 May 2011 21:43:31 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/11_I90rockblastingisback.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/11_I90rockblastingisback.htm</guid>
      <description>Crews will get the green light to resume rock blasting operations this week after a snowy spring on Interstate 90.</description>
    </item>
    <item>
      <title>Washington state wins additional high-speed-rail funding rejected by Florida</title>
      <pubDate>Tue, 10 May 2011 02:13:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/06_15mFromFLtoWA.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/06_15mFromFLtoWA.htm</guid>
      <description>Washington state will receive $15 million in additional federal high-speed-rail funding for improvements resulting in more frequent and reliable Amtrak Cascades passenger rail service between Portland and Vancouver, B.C.</description>
    </item>
    <item>
      <title>Major I-5 rehab in Skagit County begins mid-May</title>
      <pubDate>Sat, 07 May 2011 00:56:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/6_I5Burl2BellinghamPaver.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/6_I5Burl2BellinghamPaver.htm</guid>
      <description>Beginning in May 2011,crews will repair and pave 12 miles of northbound I-5 from north of the SR 11 Chuckanut Drive interchange in Burlington to south of Lake Samish near Bellingham.</description>
    </item>
    <item>
      <title>Busy weekend: drivers should expect delays in Seattle and east of Snoqualmie Pass</title>
      <pubDate>Fri, 06 May 2011 23:52:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/06_BusyTravelWeekend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/06_BusyTravelWeekend.htm</guid>
      <description>Drivers whose Mother’s Day plans include a trip to grandma’s house should plan for a full weekend of closures and sporting events in the Puget Sound area – as well delays crossing Snoqualmie Pass. The Washington State Department of Transportation (WSDOT) urges drivers to map out routes in advance, allow extra time and prepare for more congestion than usual.</description>
    </item>
    <item>
      <title>Overheight load hits I-90 at SR 18</title>
      <pubDate>Wed, 04 May 2011 07:10:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/05/03_I90SR18GirdersDamaged.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/05/03_I90SR18GirdersDamaged.htm</guid>
      <description>Bridge crews are assessing damage to Interstate 90 after a tow truck removing a vehicle from an earlier collision on State Route 18 hit and damaged the girders that support the eastbound lanes of I-90</description>
    </item>
    <item>
      <title>New SR 520 toll system put to the test</title>
      <pubDate>Sat, 30 Apr 2011 00:10:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/29NewSR520TollSystemPutToTest.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/29NewSR520TollSystemPutToTest.htm</guid>
      <description>Testing starts today on the all-electronic SR 520 toll system. The Washington State Department of Transportation (WSDOT) will spend at least the next six weeks confirming that the system can process tens of thousands of daily transactions and track revenue that will provide $1 billion in funding to replace the State Route 520 bridge.</description>
    </item>
    <item>
      <title>Rumble strips coming to SR 548 near Ferndale</title>
      <pubDate>Thu, 28 Apr 2011 01:14:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/27_Rumble548.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/27_Rumble548.htm</guid>
      <description>Starting Monday May 2, the Washington State Department of Transportation (WSDOT) will install five miles of rumble strips near Ferndale on State Route 548 between Vista Drive and Kickerville Road to help keep drivers on the road.</description>
    </item>
    <item>
      <title>Roundabouts planned for Badger Road in Lynden</title>
      <pubDate>Tue, 26 Apr 2011 04:36:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/25_sr546badgerroundabouts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/25_sr546badgerroundabouts.htm</guid>
      <description>While they’re still not the norm, roundabouts are increasing in number across the state because they make travel safer. Two more roundabouts are planned for busy intersections along Badger Road (State Route 546) in Lynden.</description>
    </item>
    <item>
      <title>Drivers should prepare for delays over I-90 near Easton for the next five weeks</title>
      <pubDate>Sat, 23 Apr 2011 04:08:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/22_2011lakeeastondelays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/22_2011lakeeastondelays.htm</guid>
      <description>For the next five weeks drivers traveling over I-90 between Easton and Cle Elum will experience delays associated with traffic restrictions.</description>
    </item>
    <item>
      <title>Reminder: Studded tire deadline April 25</title>
      <pubDate>Sat, 23 Apr 2011 00:54:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/22_studdedtiresoffApril25.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/22_studdedtiresoffApril25.htm</guid>
      <description>Drivers should remove studded tires by the end of the day Monday, April 25, or risk a fine from law enforcement.</description>
    </item>
    <item>
      <title>Brighter, safer lanes all the rage this striping season</title>
      <pubDate>Mon, 18 Apr 2011 23:15:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/18_2011StripingSeasonBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/18_2011StripingSeasonBegins.htm</guid>
      <description>Did the wet winter fade the stripes along your favorite commute? It might be time for a makeover to brighten those yellows and whites and make your trips safer.</description>
    </item>
    <item>
      <title>SR 20 paving in downtown Oak Harbor starts in June</title>
      <pubDate>Sat, 16 Apr 2011 04:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/15_sr20pavingprojectinjune.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/15_sr20pavingprojectinjune.htm</guid>
      <description>The busiest stretch of State Route 20 on Whidbey Island will get a much needed makeover this summer when crews repave through downtown Oak Harbor.</description>
    </item>
    <item>
      <title>SR 520 tolling start date dependent on successful testing of equipment and systems</title>
      <pubDate>Tue, 12 Apr 2011 22:26:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/12_520TollingDateRequirements.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/12_520TollingDateRequirements.htm</guid>
      <description>At least six weeks of rigorous testing of equipment and systems for tolling of the SR 520 bridge are planned to begin next week, and if successful, a toll start date will be set, the Washington State Department of Transportation (WSDOT) said today.</description>
    </item>
    <item>
      <title>It's official: Ohio and Wisconsin high-speed-rail funding coming to Washington</title>
      <pubDate>Fri, 08 Apr 2011 23:50:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/8_WASecuresOHWIRailFunding.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/8_WASecuresOHWIRailFunding.htm</guid>
      <description>Federal and state officials signed documents today that guarantee Washington state will get $145 million in high-speed-rail funding originally intended for Ohio and Wisconsin.</description>
    </item>
    <item>
      <title>Learn about SR 9 Pilchuck Bridge replacement project</title>
      <pubDate>Wed, 06 Apr 2011 23:01:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/6_SR9Pilchuckopenhouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/6_SR9Pilchuckopenhouse.htm</guid>
      <description>WSDOT has completed the preliminary design for the new State Route 9 Pilchuck Creek bridge and invites local drivers and residents to an open house Wednesday, April 13, 2011.</description>
    </item>
    <item>
      <title>Milestones reached during I-405 weekend closure</title>
      <pubDate>Tue, 05 Apr 2011 06:11:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/NE12BridgeRemovalPerformance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/NE12BridgeRemovalPerformance.htm</guid>
      <description>During a 49-hour complete closure of Interstate 405 in Bellevue over the weekend, the public responded to help minimize traffic congestion and crews completed a long list of work.</description>
    </item>
    <item>
      <title>Studded tire deadline extended another week</title>
      <pubDate>Tue, 05 Apr 2011 05:00:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/StudTireDeadlineApril14.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/StudTireDeadlineApril14.htm</guid>
      <description>Studded tire deadline extended another week</description>
    </item>
    <item>
      <title>Washington state applies for Florida's high-speed-rail funding</title>
      <pubDate>Tue, 05 Apr 2011 04:05:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/04_HSRFLApplication.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/04_HSRFLApplication.htm</guid>
      <description>Washington state applied today for approximately $120 million in federal high-speed-rail stimulus money, part of $2.4 billion returned by Florida. The Washington State Department of Transportation (WSDOT) will use the money to continue improving and expanding Amtrak Cascades service between Portland, Ore., and Vancouver, B.C.</description>
    </item>
    <item>
      <title>I-5 ramp improvements resume in Bellingham</title>
      <pubDate>Fri, 01 Apr 2011 23:01:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/01_i5rampworkresumes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/01_i5rampworkresumes.htm</guid>
      <description>Drivers should plan for nightly lane and ramp closures next week in downtown Bellingham as crews resume Interstate 5 ramp improvements.</description>
    </item>
    <item>
      <title>Celebrate Work Zone Awareness week by going orange for work zone safety</title>
      <pubDate>Fri, 01 Apr 2011 00:07:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/31_workzonesafety2011.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/31_workzonesafety2011.htm</guid>
      <description>In recognition of the men and women who work mere feet from traffic, the Washington State Department of Transportation (WSDOT) along with state and national groups will go orange for work zone safety April 4 through 9 to celebrate National Work Zone Awareness Week.</description>
    </item>
    <item>
      <title>New report highlights Washington’s Recovery Act transportation investments</title>
      <pubDate>Thu, 31 Mar 2011 22:40:18 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/WSDOTReportsonRecoveryActInvestment.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/WSDOTReportsonRecoveryActInvestment.htm</guid>
      <description>New report highlights Washington’s Recovery Act transportation investments</description>
    </item>
    <item>
      <title>Clearing the North Cascades Highway starts April 11</title>
      <pubDate>Thu, 31 Mar 2011 01:02:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/30SR20ReopeningStarts411.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/30SR20ReopeningStarts411.htm</guid>
      <description>WSDOT plans to begin clearing State Route 20, The North Cascades Highway, on Monday, April 11.</description>
    </item>
    <item>
      <title>WSDOT’s bridge program scores high nationally</title>
      <pubDate>Thu, 31 Mar 2011 00:03:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/30_2010bridgereport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/30_2010bridgereport.htm</guid>
      <description>Washington state’s bridge maintenance and preservation program ranked high in a report released today by Transportation for America, a broad coalition of organizations promoting national transportation reform.</description>
    </item>
    <item>
      <title>Construction resumes on I-90 east of Snoqualmie Pass</title>
      <pubDate>Tue, 29 Mar 2011 04:05:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/28_I90constructionsnoqulmiepasseast.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/28_I90constructionsnoqulmiepasseast.htm</guid>
      <description>Major highway improvements on Interstate 90 east of Snoqualmie pass are kicking off again now that winter weather has calmed down.</description>
    </item>
    <item>
      <title>Studded tire deadline extended one week</title>
      <pubDate>Sat, 26 Mar 2011 03:02:35 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/25_studded_tires_extend.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/25_studded_tires_extend.htm</guid>
      <description>The studded tire deadline has been extended one week. Drivers must now remove their studded tires by the end of the day Thursday, April 7.</description>
    </item>
    <item>
      <title>WSDOT names new public transportation director</title>
      <pubDate>Wed, 23 Mar 2011 05:55:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/New_PT_Director.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/New_PT_Director.htm</guid>
      <description>A veteran of bringing transportation choices to Washington, Brian Lagerberg was named director of the Public Transportation Division at WSDOT.</description>
    </item>
    <item>
      <title>WSDOT seeks comments on DBE contracting goals</title>
      <pubDate>Tue, 22 Mar 2011 05:08:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/DBEcontractingGoals.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/DBEcontractingGoals.htm</guid>
      <description>WSDOT seeks comments on DBE contracting goals</description>
    </item>
    <item>
      <title>Crews to install fish-friendly culvert on SR 548 near Blaine</title>
      <pubDate>Tue, 22 Mar 2011 02:55:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/21_sr548installnewculvert.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/21_sr548installnewculvert.htm</guid>
      <description>When Terrell Creek is flowing swiftly, the undersized culvert beneath State Route 548 pumps water like a fire hose. And when the creek is calm, the culvert sits several feet out of the water. Either way, it blocks fish trying to reach spawning grounds.</description>
    </item>
    <item>
      <title>Crews inspect Deception Pass bridges</title>
      <pubDate>Thu, 10 Mar 2011 00:41:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/09_sr20deceptionpassinspections.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/09_sr20deceptionpassinspections.htm</guid>
      <description>Though the Deception Pass bridges boast some of the most majestic views in the state, crews won’t be admiring the views next week when they’re hanging off the sides of the 180-foot-tall bridges.</description>
    </item>
    <item>
      <title>Building roundabouts on Mount Baker Highway this year</title>
      <pubDate>Wed, 09 Mar 2011 02:15:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/08_sr542roundaboutsbuiltthisyear.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/08_sr542roundaboutsbuiltthisyear.htm</guid>
      <description>Smoother traffic along Mount Baker Highway is just around the bend. Two new roundabouts will ease the flow at intersections near Deming.</description>
    </item>
    <item>
      <title>INRIX report: WSDOT’s Moving Washington programs keeping traffic moving</title>
      <pubDate>Wed, 09 Mar 2011 01:01:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/08_INRIX_report_WSDOT_traffic.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/08_INRIX_report_WSDOT_traffic.htm</guid>
      <description>The 2010 National Traffic Scorecard, an annual congestion report published today by INRIX Corporation, shows Seattle as the country’s only major urban area that did not see congestion get worse last year.</description>
    </item>
    <item>
      <title>WSDOT and customer service vendor working to improve Good To Go! customer experience</title>
      <pubDate>Fri, 04 Mar 2011 04:50:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/03/3_gtgCustomerServiceImprovements.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/03/3_gtgCustomerServiceImprovements.htm</guid>
      <description>WSDOT is working to improve the Good To Go! customer experience.</description>
    </item>
    <item>
      <title>Agreements secure $590 million in federal passenger rail funding for Washington state</title>
      <pubDate>Sun, 27 Feb 2011 05:24:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/26_HighSpeedRailAgreements.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/26_HighSpeedRailAgreements.htm</guid>
      <description>Agreements have been signed that guarantee Washington state will get $590 million in federal stimulus money to improve the Amtrak Cascades rail corridor from Portland to Seattle, Gov. Chris Gregoire said today.</description>
    </item>
    <item>
      <title>WSDOT updating new Good To Go! website in response to customer feedback</title>
      <pubDate>Fri, 18 Feb 2011 03:36:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/17_GoodToGoWebsiteUpgrade.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/17_GoodToGoWebsiteUpgrade.htm</guid>
      <description>WSDOT updating and improving new Good To Go! website in response to customer feedback.</description>
    </item>
    <item>
      <title>Secretary of Transportation Hammond applauds federal transportation initiatives</title>
      <pubDate>Wed, 09 Feb 2011 02:23:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/HammondApplaudsFedInitiative.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/HammondApplaudsFedInitiative.htm</guid>
      <description>Secretary of Transportation Hammond applauds federal transportation initiatives</description>
    </item>
    <item>
      <title>Crews move quickly to protect Mount Baker Highway from the Nooksack River</title>
      <pubDate>Tue, 08 Feb 2011 02:23:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/02/04_sr542emergencyrepairs.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/02/04_sr542emergencyrepairs.htm</guid>
      <description>The Nooksack River is eroding a portion of riverbank along Mount Baker Highway (State Route 542) and threatening the stability of the highway. Crews will start emergency repairs this week to protect the road and keep it open to drivers.</description>
    </item>
    <item>
      <title>Texas report: Seattle drivers stuck in traffic less than elsewhere in country</title>
      <pubDate>Fri, 21 Jan 2011 02:50:06 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/20_TTIreport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/20_TTIreport.htm</guid>
      <description>Seattle’s urban-area drivers spend less time stuck in traffic than drivers in similar-size areas around the country, according to a report today from the Texas Transportation Institute (TTI).</description>
    </item>
    <item>
      <title>Ridership on Amtrak Cascades hits all-time record in 2010</title>
      <pubDate>Thu, 20 Jan 2011 01:01:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/011911_AmtrakCascades2010ridership.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/011911_AmtrakCascades2010ridership.htm</guid>
      <description>2010 Amtrak Cascades ridership report</description>
    </item>
    <item>
      <title>WSDOT picks best-value bidder for I-5 paver near Burlington</title>
      <pubDate>Sat, 15 Jan 2011 05:11:58 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/14_I5JoeLearyBestValue.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/14_I5JoeLearyBestValue.htm</guid>
      <description>Crews will rebuild and repave a 12-mile stretch of northbound I-5 between Burlington and Bellingham in 2011. Contractor Granite Construction Inc. submitted the apparent best-value proposal to design and build the project.</description>
    </item>
    <item>
      <title>Washington to create nation’s first electric vehicle-friendly scenic byway along U.S. 2</title>
      <pubDate>Thu, 13 Jan 2011 08:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/firstElectricVehicleHighway.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/firstElectricVehicleHighway.htm</guid>
      <description>Washington to create nation’s first electric vehicle-friendly scenic byway along U.S. 2</description>
    </item>
    <item>
      <title>National experts deliver final report on I-405/SR 167 express toll lanes</title>
      <pubDate>Wed, 05 Jan 2011 06:56:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/01/ERPReport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/01/ERPReport.htm</guid>
      <description>A proposed express toll lane system is a viable and appropriate strategy for improving mobility in the Interstate 405 and State Route 167 corridor, according to a report by national tolling experts sent today to the Washington State Department of Transportation (WSDOT).</description>
    </item>
  </channel>
</rss>