﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - April</title>
    <link>http://www.wsdot.wa.gov/News/2011/04/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Tue, 18 Jun 2013 22:11:32 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - April</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/News/2011/04/</link>
    </image>
    <item>
      <title>Digging in: Excavation starts on SR 520 pontoon casting basin</title>
      <pubDate>Tue, 03 May 2011 01:15:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/SR520PCPCastingBasin.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/SR520PCPCastingBasin.htm</guid>
      <description>ABERDEEN – Today crews started excavating more than a quarter-million cubic yards of dirt for a casting basin here – a crucial step for building concrete pontoons to replace the aging and vulnerable State Route 520 floating bridge in the Seattle area.</description>
    </item>
    <item>
      <title>New SR 520 toll system put to the test</title>
      <pubDate>Sat, 30 Apr 2011 00:10:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/29NewSR520TollSystemPutToTest.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/29NewSR520TollSystemPutToTest.htm</guid>
      <description>Testing starts today on the all-electronic SR 520 toll system. The Washington State Department of Transportation (WSDOT) will spend at least the next six weeks confirming that the system can process tens of thousands of daily transactions and track revenue that will provide $1 billion in funding to replace the State Route 520 bridge.</description>
    </item>
    <item>
      <title>Rumble strips coming to SR 548 near Ferndale</title>
      <pubDate>Thu, 28 Apr 2011 01:14:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/27_Rumble548.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/27_Rumble548.htm</guid>
      <description>Starting Monday May 2, the Washington State Department of Transportation (WSDOT) will install five miles of rumble strips near Ferndale on State Route 548 between Vista Drive and Kickerville Road to help keep drivers on the road.</description>
    </item>
    <item>
      <title>Demolition launches SR 520 construction in Bellevue</title>
      <pubDate>Tue, 26 Apr 2011 04:47:46 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/25_SR520_EastsideDemolition.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/25_SR520_EastsideDemolition.htm</guid>
      <description>BELLEVUE – Demolition crews tore down a half-century-old toll administration building on State Route 520 today, removing the last relic of cash toll collections on this highway and launching three years of major construction on the Eastside.</description>
    </item>
    <item>
      <title>Roundabouts planned for Badger Road in Lynden</title>
      <pubDate>Tue, 26 Apr 2011 04:36:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/25_sr546badgerroundabouts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/25_sr546badgerroundabouts.htm</guid>
      <description>While they’re still not the norm, roundabouts are increasing in number across the state because they make travel safer. Two more roundabouts are planned for busy intersections along Badger Road (State Route 546) in Lynden.</description>
    </item>
    <item>
      <title>Drivers should prepare for delays over I-90 near Easton for the next five weeks</title>
      <pubDate>Sat, 23 Apr 2011 04:08:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/22_2011lakeeastondelays.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/22_2011lakeeastondelays.htm</guid>
      <description>For the next five weeks drivers traveling over I-90 between Easton and Cle Elum will experience delays associated with traffic restrictions.</description>
    </item>
    <item>
      <title>Reminder: Studded tire deadline April 25</title>
      <pubDate>Sat, 23 Apr 2011 00:54:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/22_studdedtiresoffApril25.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/22_studdedtiresoffApril25.htm</guid>
      <description>Drivers should remove studded tires by the end of the day Monday, April 25, or risk a fine from law enforcement.</description>
    </item>
    <item>
      <title>Rumble strips coming to SR 516 in Kent</title>
      <pubDate>Sat, 23 Apr 2011 00:46:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/22_SR516RumblestripsInstallation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/22_SR516RumblestripsInstallation.htm</guid>
      <description>KENT – Have you ever seen a car or truck drift off the highway then suddenly and dangerously correct itself? It’s a serious hazard that soon should become less common on State Route 516.</description>
    </item>
    <item>
      <title>WSDOT kicks off 2011 highway construction season</title>
      <pubDate>Wed, 20 Apr 2011 01:06:02 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/19_2011ConstructionKickoff.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/19_2011ConstructionKickoff.htm</guid>
      <description>The Washington State Department of Transportation (WSDOT) officially kicked off the 2011 construction season in Lynnwood today at the site of the $33 million Interstate 5 braided-ramp project.</description>
    </item>
    <item>
      <title>Brighter, safer lanes all the rage this striping season</title>
      <pubDate>Mon, 18 Apr 2011 23:15:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/18_2011StripingSeasonBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/18_2011StripingSeasonBegins.htm</guid>
      <description>Did the wet winter fade the stripes along your favorite commute? It might be time for a makeover to brighten those yellows and whites and make your trips safer.</description>
    </item>
    <item>
      <title>SR 20 paving in downtown Oak Harbor starts in June</title>
      <pubDate>Sat, 16 Apr 2011 04:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/15_sr20pavingprojectinjune.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/15_sr20pavingprojectinjune.htm</guid>
      <description>The busiest stretch of State Route 20 on Whidbey Island will get a much needed makeover this summer when crews repave through downtown Oak Harbor.</description>
    </item>
    <item>
      <title>New travel time signs on the Eastside direct drivers to road less traveled</title>
      <pubDate>Thu, 14 Apr 2011 03:02:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/13_2neweastsidetraveltimesigns.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/13_2neweastsidetraveltimesigns.htm</guid>
      <description>Two new travel time signs will turn on Thursday afternoon, April 14 on westbound SR 520 in Bellevue and westbound SR 522 in Woodinville.</description>
    </item>
    <item>
      <title>SR 520 tolling start date dependent on successful testing of equipment and systems</title>
      <pubDate>Tue, 12 Apr 2011 22:26:17 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/12_520TollingDateRequirements.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/12_520TollingDateRequirements.htm</guid>
      <description>At least six weeks of rigorous testing of equipment and systems for tolling of the SR 520 bridge are planned to begin next week, and if successful, a toll start date will be set, the Washington State Department of Transportation (WSDOT) said today.</description>
    </item>
    <item>
      <title>It's official: Ohio and Wisconsin high-speed-rail funding coming to Washington</title>
      <pubDate>Fri, 08 Apr 2011 23:50:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/8_WASecuresOHWIRailFunding.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/8_WASecuresOHWIRailFunding.htm</guid>
      <description>Federal and state officials signed documents today that guarantee Washington state will get $145 million in high-speed-rail funding originally intended for Ohio and Wisconsin.</description>
    </item>
    <item>
      <title>Learn about SR 9 Pilchuck Bridge replacement project</title>
      <pubDate>Wed, 06 Apr 2011 23:01:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/6_SR9Pilchuckopenhouse.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/6_SR9Pilchuckopenhouse.htm</guid>
      <description>WSDOT has completed the preliminary design for the new State Route 9 Pilchuck Creek bridge and invites local drivers and residents to an open house Wednesday, April 13, 2011.</description>
    </item>
    <item>
      <title>Milestones reached during I-405 weekend closure</title>
      <pubDate>Tue, 05 Apr 2011 06:11:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/NE12BridgeRemovalPerformance.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/NE12BridgeRemovalPerformance.htm</guid>
      <description>During a 49-hour complete closure of Interstate 405 in Bellevue over the weekend, the public responded to help minimize traffic congestion and crews completed a long list of work.</description>
    </item>
    <item>
      <title>Studded tire deadline extended another week</title>
      <pubDate>Tue, 05 Apr 2011 05:00:13 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/StudTireDeadlineApril14.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/StudTireDeadlineApril14.htm</guid>
      <description>Studded tire deadline extended another week</description>
    </item>
    <item>
      <title>Washington state applies for Florida's high-speed-rail funding</title>
      <pubDate>Tue, 05 Apr 2011 04:05:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/04_HSRFLApplication.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/04_HSRFLApplication.htm</guid>
      <description>Washington state applied today for approximately $120 million in federal high-speed-rail stimulus money, part of $2.4 billion returned by Florida. The Washington State Department of Transportation (WSDOT) will use the money to continue improving and expanding Amtrak Cascades service between Portland, Ore., and Vancouver, B.C.</description>
    </item>
    <item>
      <title>Southbound I-405 opens early in Bellevue after bridge torn down; northbound opens Monday at 4 a.m.</title>
      <pubDate>Mon, 04 Apr 2011 11:30:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/03_I405SBReopensEarly.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/03_I405SBReopensEarly.htm</guid>
      <description>Southbound I-405 in Bellevue opened just after 9 p.m. - several hours ahead of schedule after crews removed the old N.E. 12th St. bridge.</description>
    </item>
    <item>
      <title>Damaged NE 12th Street bridge will open early at 6 p.m., but carry limited traffic</title>
      <pubDate>Mon, 04 Apr 2011 04:23:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/03_12thStreetBridgeReopensMonday.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/03_12thStreetBridgeReopensMonday.htm</guid>
      <description>Engineers have inspected the damage to the new NE 12th Street bridge in Bellevue and determined it can be opened to traffic on Sunday, April 3 at 6 p.m. but traffic will be limited to one westbound lane only.</description>
    </item>
    <item>
      <title>It’s crunch time: I-405 in Bellevue closes tonight at 11 p.m.</title>
      <pubDate>Sat, 02 Apr 2011 03:44:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/405_12thBridgeRemoval.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/405_12thBridgeRemoval.htm</guid>
      <description>Interstate 405 will close tonight at 11 p.m. for 53 hours between N.E. Eighth Street and State Route SR 520 in Bellevue until 4 a.m., Monday, April 4.</description>
    </item>
    <item>
      <title>I-5 ramp improvements resume in Bellingham</title>
      <pubDate>Fri, 01 Apr 2011 23:01:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2011/04/01_i5rampworkresumes.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2011/04/01_i5rampworkresumes.htm</guid>
      <description>Drivers should plan for nightly lane and ramp closures next week in downtown Bellingham as crews resume Interstate 5 ramp improvements.</description>
    </item>
  </channel>
</rss>