Project delivery memos
Project Delivery Memos are design and construction documents used to implement an immediate change in any stage of project, from design through advertisement and construction.
Memos remain in effect until all appropriate support documentation can be updated or replaced.
Active memos
#23-06 Pre-NCHRP 350 Guardrail Terminal Replacement (PDF 263KB)
#23-05 Department Franchise Authority on Developer-Led Projects (PDF 196KB)
#23-04 Dig Once - Broadband (PDF 167KB)
#23-03 Indirect Costs Within Reimbursable Agreements (PDF 274KB)
#22-05 Interim At-Risk Advertisement Procedure (PDF 361KB)
#22-03 Complete Streets Implementation (PDF 883KB)
#22-02 Risk Approval for Advertisement of Design-Build Projects (PDF 191KB)
#22-01 Vertical Clearance for Water Crossing Bridges and Buried Structures (PDF 187KB)
#21-04 Fish Passage Project Efficiencies (PDF 187KB)
#21-03 Professional Liability Insurance Risk Assessment (PDF 170KB)
#21-01 Pedestrian Accommodation in Alteration and Pavement Preservation Project (PDF 756KB)
#19-04 Acquiring temporary construction rights for ADA in preservation projects (PDF 52KB)
#19-04 (Process Option) ADA in preservation projects (PDF 25KB)
#19-03 BOD and Pre-Design Implementation (PDF 518KB)
#19-01 Freeway Work Zone Variable Regulatory Speed Limit and Advisory Speed Implementation (PDF 132KB)
Slow down – lives are on the line.
In 2023, speeding continued to be a top reason for work zone crashes.
Even one life lost is too many.
Fatal work zone crashes doubled in 2023 - Washington had 10 fatal work zone crashes on state roads.
It's in EVERYONE’S best interest.
95% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.