Kitsap & Mason County construction and travel updates

 

Kitsap County

 

Construction
Highway:
 SR 3, SR 304, and SR 166 Region: Olympic County: Kitsap Location: Milepost(s) See below
Contact: Michele Britton, 360-874-3000
Description: Crews will repave sections and make ADA improvements to sidewalk ramps along areas of SR 3 in Poulsbo, SR 304 in Bremerton, and SR 166 in Port Orchard. Drivers can expect night ramp, and lane closures. Pedestrians and bicyclists may encounter detours for ADA improvements. 
Work Schedule: This project will begin during April and will continue into early fall. 

Highway: SR 305 Region: Olympic County: Kitsap Location: Milepost(s) 6.8
Contact: Michele Britton, 360-874-3000
Description: Crews will repaint the SR 305 Agate Pass Bridge. During work activities, drivers will notice a reduced speed limit. The bridge will reduce to one-way alternating traffic at times during off-peak hours. One sidewalk will remain open. 
Work Schedule: Crews will work during spring and summer 2019. Crews will complete the work spring and summer 2020.
Project web page

 

Maintenance

 

Highway: SR 3 Region: Olympic County: Kitsap Location: Milepost(s) 52.2
Contact: Duke Stryker, 360-874-3050
Description: Shoulder closure in both directions for guardrail repair. 
Work Schedule: 9 a.m. to 3 p.m. Monday and Tuesday, March 25-26. 

Highway: SR 3 Region: Olympic County: Kitsap Location: Milepost(s) 50.3
Contact: Duke Stryker, 360-874-3050
Description: Southbound shoulder closure for guardrail repair. 
Work Schedule: 9 a.m. to 3 p.m. Monday and Tuesday, March 25-26. 

Highway: SR 104 Region: Olympic County: Kitsap Location: Milepost(s) 14
Contact: Doug Adamson, 360-357-2716
Description: An in-depth inspection of the State Route 104 Hood Canal Bridge will require multiple weekday drawspan openings that will close the bridge to vehicular traffic. Drivers are advised to expect delays ranging from 15 minutes to 60 minutes per event. Drivers are encouraged to plan ahead to help prevent delays.
Work Schedule: Expect multiple drawspan openings during the following times:

  • 9 a.m. to 3 p.m. Monday through Friday, March 25-29
  • 9 a.m. 3 p.m. Monday through Friday, April 1-5

 


 

Mason County
 

 

Maintenance
 


Highway: SR 3 Region: Olympic County: Mason Location: Milepost(s) 17 to 17.6
Contact: Duke Stryker, 360-874-3050
Description: Drivers may encounter one-way alternating traffic with flaggers and occasional traffic stops for Green Diamond tree felling adjacent to the highway. 
Work Schedule:  6 a.m. to 10 a.m. Saturday and Sunday, March 30-31. 

Highway: SR 108 Region: Olympic County: Mason Location: Milepost(s) 9.7 to 11.8
Contact: Chris Ehresmann, 360-570-6749
Description: Utility crews for Mason County PUD #3 will raise power lines. Drivers may encounter one-way alternating traffic with flaggers. 
Work Schedule:  8 a.m. to 4:30 p.m. each weekday through Friday, May 3. 

Highway: SR 119 Region: Olympic County: Mason Location: Milepost(s) 0.8 to 10.9
Contact: Chris Ehresmann, 360-570-6749
Description: One-way alternating traffic with flaggers as utility crews replace lines. 
Work Schedule: 8 a.m. to 4:30 p.m. each weekday through Wednesday, May 1.

Highway: SR 302 Region: Olympic County: Mason Location: Milepost(s) 2 to 5
Contact: Chris Ehresmann, 360-570-6749
Description: One-way alternating traffic for utility crews. 
Work Schedule: 9 a.m. to 2:30 p.m. each Monday through Thursday, through Thursday, March 28.