|
PGSplice
4.1
Precast-prestressed Spliced Girder Bridges
|
Insert a span and a pier into the bridge model.
| Item | Description |
|---|---|
| Span Length | Length of the new span, measured along the horizontal alignment. |
| Location | Select the location to insert the span. Location choices are before or after an abutment or pier. |
| Create New Group | When checked, a new group is created, otherwise the span is added into an existion group |
| Pier Construction | Select the event that corresponds to the construction of the new pier associated with this span. |