WSDOT home

Road & Bridge Restricted List

I-90, Milepost: 60 to 57, Direction: W, Date Posted: 7/18/2019 3:25:00 PM, Original Date: 7/22/2019 12:00:00 AM
No loads over 10' wide on Monday through Thursday from 8:00pm to 9:00am the following day. Note: Mobile homes with eaves that are wider than the 10' restriction are allowed.
US 12, Milepost: 340.5 to 341, Direction: Both, Date Posted: 7/18/2019 10:05:00 AM, Original Date: 7/25/2019 12:00:00 AM
US-12 from milepost 341, near Isaacs Ave, to milepost 340.5, near Interchange Rd, will be closed effective Thursday, July 25th at 6:00am through Friday, July 26th at 6:00am.
I-82, Milepost: 132.36 to 133, Direction: E, Date Posted: 7/16/2019 11:15:00 AM, Original Date: 8/19/2019 12:00:00 AM
Effective Monday, August 19th through Friday, August 23rd. No loads over 11' wide on the Umatilla Bridge I-82 Eastbound, MP 132.36-133. From 7:00AM to 5:00PM daily. Detour available via US 97 or US 730.
US 12, Milepost: 153, Direction: Both, Date Posted: 7/15/2019 10:34:00 AM, Original Date: 7/19/2019 12:00:00 AM
Effective Friday, July 19th through Friday, August 2nd from 7:00am to 5:00pm, Monday-Friday on US 12 (White Pass Vicinity) at milepost 153. No loads over 12' wide.
SR 21, Milepost: 145.50 to 145.75, Direction: Both, Date Posted: 7/12/2019 1:58:00 PM, Original Date: 7/23/2019 12:00:00 AM
48-hour closure of State Route 21, from MP 145.50 to MP 145.75. The closure will take place from Tuesday, July 23rd at 12:00 PM to, Thursday July 25th at 12:00 PM.
I-90, Milepost: 33 to 52, Direction: E, Date Posted: 7/11/2019 3:49:00 PM, Original Date: 7/15/2019 12:00:00 AM
No loads over 14' wide on Monday to Friday from 6:00 PM to 6:00 AM the following day. Note: Mobile homes with eaves that are wider than the 14' restriction are allowed.
SR 522, Milepost: 8 to 9, Direction: Both, Date Posted: 7/11/2019 8:46:00 AM, Original Date: 7/17/2019 12:00:00 AM
Effective July 17th until further notice. On SR 522, mileposts 8-9, both directions. No loads over 10' wide 24/7 due to narrow travel lanes and closures.
I-90, Milepost: 136 to 137, Direction: Both, Date Posted: 7/8/2019 3:21:00 PM, Original Date: 7/15/2019 12:00:00 AM
Effective July 15th through July 18th. No loads over 12' wide from 7:00AM to 3:30PM on Vantage Bridge, I-90, mileposts 136-137, both directions. Eastbound on Monday & Thursday and Westbound on Tuesday & Wednesday.
US 12, Milepost: 155.79, Direction: Both, Date Posted: 7/3/2019 8:45:00 AM, Original Date: 7/8/2019 12:00:00 AM
Effective Monday, July 8th through Thursday, July 18th from 7:00am to 5:00pm on US 12 (White Pass Vicinity) at milepost 155.79. No loads over 12' wide.
I-90, Milepost: 54 to 33, Direction: W, Date Posted: 7/2/2019 3:56:00 PM, Original Date: 7/8/2019 12:00:00 AM
No loads over 14' wide on Monday through Friday nights from 10:00pm to 10:00am the following day. Note: Mobile Homes with eaves that are wider than the 14' restriction are allowed.
SR 107, Milepost: 6.83, Direction: Both, Date Posted: 7/2/2019 12:46:00 PM, Original Date: 7/2/2019 12:00:00 AM
25 ton weight limit, no over legal axle weights.
SR 14, Milepost: 15.5 to 17.5, Direction: Both, Date Posted: 7/2/2019 9:22:00 AM, Original Date: 7/8/2019 12:00:00 AM
Effective July 8th through October 1st on SR 14 in the Washougal area, mileposts 15.5 to 17.5 both directions. No overweight or overlength loads due to temporary roundabout configuration.
US 97, Milepost: 159.3 to 159.75, Direction: Both, Date Posted: 6/26/2019 3:55:00 PM, Original Date: 6/26/2019 12:00:00 AM
Effective Wednesday, June 26th until October 1st. No loads over 12' wide both directions US 97 from mileposts 159.3-159.75 on Blewett Pass. This restriction is 24/7. No detour, use alternate route.
SR 18, Milepost: 20.42 to 20.32, Direction: W, Date Posted: 6/26/2019 8:38:00 AM, Original Date: 5/13/2019 12:00:00 AM
Effective Monday May 13th until mid July. Westbound, SR 18 mileposts 20.42-20.32. No loads over 13' wide, 24/7 in the vicinity of Issaquah Hobart Rd. Due to construction in the area.
SR 305, Milepost: 6.82, Direction: Both, Date Posted: 6/19/2019 11:47:00 AM, Original Date: 7/1/2019 12:00:00 AM
Legal loads only, 105,500 max GVW. No over legal axle weight. Due to bridge work.
US 12, Milepost: 319 to 324, Direction: Both, Date Posted: 6/10/2019 4:09:00 PM, Original Date: 6/10/2019 12:00:00 AM
US 12, Mileposts 319-324, both directions. No loads over 12' wide on Monday through Sunday from 7:00am to 5:00pm.
I-90, Milepost: 80.77 to 80.87, Direction: E, Date Posted: 6/7/2019 10:47:00 AM, Original Date: 7/8/2019 12:00:00 AM
No loads over 12' wide on Monday and Tuesday from 6:00pm to 9:00am the following day, Wednesday from 7:00pm to 8:00am the following day, Thursday from 9:00pm to 7:00am the following day, and Friday from 11:00pm to 7:00am the following day. Note: Mobile homes with eaves that are wider than the 12' restriction are allowed.
I-90, Milepost: 80.85 to 80.77, Direction: W, Date Posted: 6/7/2019 10:41:00 AM, Original Date: 7/8/2019 12:00:00 AM
No loads over 12' wide on Monday from 8:00pm to 8:00am the following day, Tuesday from 7:00pm to 9:00am the following day, Wednesday from 7:00pm to 8:00am the following day, Thursday from 8:00pm to 8:00am the following day, and Friday 9:00pm to 8:00am the following day. Note: Mobile homes with eaves that are wider than the 12' restriction are allowed.
SR 127, Milepost: 9.65, Direction: Both, Date Posted: 6/4/2019 2:23:00 PM, Original Date: 7/8/2019 12:00:00 AM
Effective Monday, July 8th through Friday, July 26th. On SR 127, Milepost 9.65 (Central Ferry Bridge) both directions, No loads over 10' wide from 7:00am-5:00pm each day M-F.
US 101, Milepost: 237.55, Direction: Both, Date Posted: 5/14/2019 8:39:00 AM, Original Date: 5/14/2019 12:00:00 AM
4 Axle Single Unit Truck 27 Tons; 5 Axle Single Unit Truck 29 Tons; 6 Axle Single Unit Truck 30 Tons and 7 Axle Single Unit Truck 33 Tons. For non-divisible loads running on a permit, 3 pilot cars are required the 2 front will have minimum separation of 500', #1 pilot to warn oncoming traffic, #2 pilot to stop oncoming traffic as necessary. One vehicle on bridge at a time, must travel centerline. Maximum speed 25 mph.
SR 507, Milepost: 23.70 to 43.57, Direction: Both, Date Posted: 5/13/2019 8:38:00 AM, Original Date: 5/13/2019 12:00:00 AM
Effective Monday, May 13th on SR 507, Mileposts 23.70 to 43.57, N of Rainier to Jct 7, both directions. No loads over 12' wide from 7:00pm to 5:00am Monday through Friday. Due to a Paving project.
I-82, Milepost: 38, Direction: W, Date Posted: 5/3/2019 10:03:00 AM, Original Date: 5/7/2019 12:00:00 AM
Beginning May 7 and ending August 31, the I-82 Exit 38 Westbound Off-Ramp, will have a lane restriction of 12 feet.
US 395, Milepost: 18.59, Direction: Both, Date Posted: 4/10/2019 10:40:00 AM, Original Date: 5/2/2019 12:00:00 AM
Legal loads only. Maximum weight 105,500 lbs.
SR 107, Milepost: 6.9 to 7.05, Direction: Both, Date Posted: 4/8/2019 1:38:00 PM, Original Date: 5/1/2019 12:00:00 AM
Effective May 1st until further notice. On SR 107 (Montesano Area) from mileposts 6.9 to 7.05, both directions. No loads over 9' wide, 24/7. Detour is available.
SR 290, Milepost: .09 to .41, Direction: W, Date Posted: 3/29/2019 2:44:00 PM, Original Date: 4/1/2019 12:00:00 AM
I-90/SR 290, MP 0.09-0.41, Westbound. Effective Monday, April 1st No Oversize Loads 24/7. Vehicles exceeding 14' high must take the EB I-90 on-ramp, and then exit at the Altamont Exit (Exit 283A), to 3rd Ave. Westbound oversize loads less than 15' high may take the Altamont Street North, to 2nd Ave., and then re-enter I-90 WB at Altamont on-ramp (Exit 283A). All vehicles greater than 15' high must use the 3rd Ave to Freya Interchange, where the westbound traffic will be able to cross over and must take Westbound 2nd Ave to Altamont Street on-ramp (Exit 283A), to WB I-90
SR 99, Milepost: 31 to 34, Direction: Both, Date Posted: 3/15/2019 11:36:00 AM, Original Date: 3/15/2019 12:00:00 AM
No loads over 15'2" high through the new SR 99 Tunnel. *WSDOT Does Not Guarantee Height Clearances*
SR 409, Milepost: 2.79 to 3.31, Direction: Both, Date Posted: 3/15/2019 8:04:00 AM, Original Date: 3/22/2019 12:00:00 AM
SR 409, Milepost 2.79-3.31, Both Directions, No Overwidth Loads, 24/7. Detour options are the Lewis and Clark Bridge in Longview, or the Astoria-Megler Bridge.
I-5, Milepost: 122.33 to 123.09, Direction: Both, Date Posted: 2/15/2019 4:03:00 PM, Original Date: 2/15/2019 12:00:00 AM
During construction of the Berkeley St interchange the NB/SB ramps are restricted to 12' wide. Trucks greater than 12 feet wide will not be able to safely navigate these ramps.
SR 278, Milepost: 2.19, Direction: Both, Date Posted: 11/8/2018 8:31:00 AM, Original Date: 11/8/2018 12:00:00 AM
No over legal axle weights; 6 axle Single Unit truck is limited to 33 Tons; 7 axle Single Unit truck is limited to 36 Tons
SR 507, Milepost: 2.36, Direction: Both, Date Posted: 9/17/2018 10:42:00 AM, Original Date: 9/17/2018 12:00:00 AM
SR 507, Milepost 2.36 - “No over legal axle weights, Legal Loads only Maximum weight 105,500. Single axle NTE 20,000 lbs. Tandem axles NTE 34,000 lbs”, effective immediately.
US 101, Milepost: 219 to 232, Direction: Both, Date Posted: 3/14/2018 1:03:00 PM, Original Date: 3/19/2018 12:00:00 AM
Effective Monday, March 19th until November 2019 on US 101, Milepost 219-232, (Lake Crescent/Olympic National Park) both directions. No loads over 11' wide 24/7. Detour available via SR 112 with existing restrictions or US 101 via Aberdeen.
SR 21, Milepost: 145.62, Direction: Both, Date Posted: 4/20/2017 9:10:00 AM, Original Date: 4/20/2017 12:00:00 AM
SR 21, MP 145.62 When the Bailey Bridge reopens, No loads over 8'6" wide and No over legal axle weights
SR 21, Milepost: 145.62, Direction: Both, Date Posted: 4/20/2017 8:20:00 AM, Original Date: 4/20/2017 12:00:00 AM
Effective immediately, No over legal axle weights. 105,500 lbs Max GVW; Legal Width 8.50 ft Max.”
SR 9, Milepost: 10.87, Direction: Both, Date Posted: 7/26/2016 8:24:00 AM, Original Date: 7/26/2016 12:00:00 AM
BL = 20,000 lbs CL-8 = 20,000 lbs SA = 39,000 lbs. This bridge crosses over SR-9, not on mainline bridge.
US 195, Milepost: 38.50, Direction: Both, Date Posted: 3/3/2016 10:48:00 AM, Original Date: 3/3/2016 12:00:00 AM
Legal loads only. No over legal axle weights; Max gross weight is 105,500.
SR 203, Milepost: .24, Direction: Both, Date Posted: 12/3/2015 11:45:00 AM, Original Date: 12/3/2015 12:00:00 AM
Effective immediately Legal loads only, 105,500 max GVW. No over legal axle weight. Due to deterioration in the bridge.
SR 503, Milepost: 27.84, Direction: Both, Date Posted: 6/10/2015 1:00:00 PM, Original Date: 4/23/2010 12:00:00 AM
Legal axle weights only. Trucks not to exceed 40,000 lbs, Tractor Trailer NTE 68,000 lbs, Truck Trailers NTE 72,000 lbs. Only one Truck allowed on bridge at a time.
SR 530, Milepost: 56.22, Direction: Both, Date Posted: 6/10/2015 1:00:00 PM, Original Date: 4/26/2010 12:00:00 AM
No over legal axle weights. Legal Gross Weight limited to 105,500 lbs. 5.5 mi S of Town of Rockport.
SR 548, Milepost: 11.54, Direction: Both, Date Posted: 6/10/2015 1:00:00 PM, Original Date: 4/27/2010 12:00:00 AM
30,000 lb max GVW Weight limit. Legal axle
SR 165, Milepost: 11.50, Direction: Both, Date Posted: 6/10/2015 12:59:00 PM, Original Date: 5/21/2013 12:00:00 AM
Legal weights only. Truck-25 Tons, Truck/Semitrailer-36 Tons, Truck/Trailer-40 Tons. Single axle NTE 20,000 and Tandem axles NTE 34,000.
SR 241, Milepost: 1.34, Direction: Both, Date Posted: 6/10/2015 12:59:00 PM, Original Date: 4/23/2010 12:00:00 AM
Legal axle weights only. Truck- 14 tons, Truck/Semi Trailer- 18 tons, Truck/Trailer - 22 ton.
US 101, Milepost: 87.99, Direction: S, Date Posted: 6/10/2015 12:58:00 PM, Original Date: 4/26/2010 12:00:00 AM
No over legal axle weights 105,500 lbs Total Weight Limit Detour available by contacting Hoquiam Police Dept @ (360) 533-8765. This is a permanent restriction. Simpson Ave, Hoquiam (Southerly Bridge)Truck- 25 tons. Truck/Semitrailer-36 tons. Truck/Trailer-40 tons. Must contact Hoquiam Licensing 360-533-4333 for "Reverse Permit" through city streets.
SR 99, Milepost: 30.59, Direction: Both, Date Posted: 6/10/2015 12:55:00 PM, Original Date: 8/27/2014 12:00:00 AM
43,000 weight limit for SA.
I-5, Milepost: 270.24, Direction: Both, Date Posted: 5/26/2015 10:32:00 AM, Original Date: 5/26/2015 12:00:00 AM
Legal Weights Only. No overweight permits authorized. Does not affect mainline I-5. Milepost 270.24 over I-5.
SR 508, Milepost: 13.65, Direction: Both, Date Posted: 5/11/2015 9:19:00 AM, Original Date: 5/11/2015 12:00:00 AM
SR 508, milepost 13.65, both directions. No loads over 9' wide on Bridge until further notice.
I-5, Milepost: 18.21, Direction: N, Date Posted: 4/27/2015 8:44:00 AM, Original Date: 4/27/2010 12:00:00 AM
Limited to 20,000 lbs. per axle max. All loads over legal gross weight, must travel center lane of bridge. Loads over 20,000 lbs. per axle must use alternate route. ALTERNATE ROUTE: From Clark (360-397-2446)/Cowlitz Co (360-577-3030),Permits available 7:45AM to 5:15PM, Mon-Thurs, Closed on Fridays for gross weight up to 197,000lbs.
I-5, Milepost: 19.83, Direction: S, Date Posted: 4/27/2015 8:44:00 AM, Original Date: 4/27/2010 12:00:00 AM
Limited to 20,000 lbs. per axle max. All other loads, over legal gross weight, must travel center lane of bridge. Loads over 20,000 lbs. per axle must use alternate route. ALTERNATE ROUTE: From Clark (360-397-2446)/Cowlitz Co (360-577-3030),Permits available 7:45AM to 5:15PM, Mon-Thurs, Closed on Fridays for gross weight up to 197,000lbs.
SR 20, Milepost: 40.82 to 42.75, Direction: Both, Date Posted: 4/1/2015 12:51:00 PM, Original Date: 4/13/2009 12:00:00 AM
All loads exceeding 12' and up to 14' wide must have a separate single trip permit and follow these exception rules: 3 pilots when within the MP limits (40.82-42.75). Allowed to travel during the following days and times only. 9AM to 2PM Mon-Thurs. 10AM to 2PM Fri. No weekend moves. All loads exceeding 14' wide are subject to Mt Vernon DOT office approval before load can be moved, call (360) 848-7230. *WSDOT Does Not Guarantee Height Clearances*
SR 508, Milepost: 22.65, Direction: Both, Date Posted: 1/8/2015 9:36:00 AM, Original Date: 8/27/2014 12:00:00 AM
44,000 lb weight limit SA.
SR 104, Milepost: 13.93, Direction: Both, Date Posted: 10/2/2014 2:28:00 PM, Original Date: 4/27/2010 12:00:00 AM
21,500 lb per axle limit
SR 272, Milepost: 16 to 16.2, Direction: Both, Date Posted: 8/28/2014 11:57:00 AM, Original Date: 3/17/2014 12:00:00 AM
SR 272, both directions from mileposts 16-16.2, Semi-trailers/loads longer than 56' in length must contact the WSDOT Colfax permit office prior to movement @ (509) 397-3051. Road is narrow with 90 degree corners. No detour available.
I-90, Milepost: 287.83, Direction: Both, Date Posted: 8/28/2014 10:30:00 AM, Original Date: 8/27/2014 12:00:00 AM
42,000 lbs weight limit for SA, Restriction is on overcrossing running North & South, NOT ON I-90 MAINLINE.
SR 433, Milepost: 0, Direction: Both, Date Posted: 8/28/2014 9:35:00 AM, Original Date: 4/27/2010 12:00:00 AM
21,500 lbs per axle weight limit. Between Rainier,OR and Longview, WA.
I-5, Milepost: 192.31, Direction: Both, Date Posted: 8/28/2014 9:21:00 AM, Original Date: 8/27/2014 12:00:00 AM
21,500 lbs per axle weight limit for BL & 43,500 lbs weight limit for SA, Restriction is on overcrossing running East & West, NOT ON I-5 MAINLINE.
SR 112, Milepost: 14.85, Direction: Both, Date Posted: 8/28/2014 9:01:00 AM, Original Date: 4/27/2010 12:00:00 AM
0.5 mi W of town of Clallam Bay. 19,000 lb per axle weight limits
SR 153, Milepost: 4.22, Direction: Both, Date Posted: 8/27/2014 10:09:00 AM, Original Date: 4/22/2010 12:00:00 AM
20,500 lb per axle limit
SR 153, Milepost: 18.91, Direction: Both, Date Posted: 8/27/2014 10:08:00 AM, Original Date: 4/26/2010 12:00:00 AM
19,000 lb per axle limit
SR 542, Milepost: 38.65, Direction: Both, Date Posted: 8/27/2014 9:47:00 AM, Original Date: 8/27/2014 12:00:00 AM
18,000 lb per axle limit for BL.
SR 542, Milepost: 17.65, Direction: Both, Date Posted: 8/27/2014 9:45:00 AM, Original Date: 8/27/2014 12:00:00 AM
20,000 lb per axle limit for BL.
SR 542, Milepost: 21.93, Direction: Both, Date Posted: 8/27/2014 9:43:00 AM, Original Date: 4/23/2010 12:00:00 AM
SR 542, MP 21.93 WB & EB 21,500 lb per axle limit
SR 509, Milepost: 7.85, Direction: Both, Date Posted: 8/27/2014 9:42:00 AM, Original Date: 8/27/2014 12:00:00 AM
19,500 lbs per axle weight limit BL.
SR 507, Milepost: 1.47, Direction: S, Date Posted: 8/27/2014 9:38:00 AM, Original Date: 4/27/2010 12:00:00 AM
21,000 lb axle weight limit
SR 155, Milepost: 16.81, Direction: Both, Date Posted: 8/27/2014 9:37:00 AM, Original Date: 8/27/2014 12:00:00 AM
45,000 lbs weight limit SA
SR 155, Milepost: 28.26, Direction: Both, Date Posted: 8/27/2014 9:35:00 AM, Original Date: 4/27/2010 12:00:00 AM
20,000 lb axle weight limit
SR 108, Milepost: 6.66, Direction: Both, Date Posted: 8/27/2014 9:30:00 AM, Original Date: 4/26/2010 12:00:00 AM
19,500 lb per axle limit
US 101, Milepost: 192.4, Direction: Both, Date Posted: 8/27/2014 9:29:00 AM, Original Date: 4/27/2010 12:00:00 AM
All overloads travel center line. Traffic control is required. (traffic control=Flaggers to stop traffic both sides of bridge to allow load to cross using center line of bridge) 0.5 mi S of Jct with SR 110, N of city of Forks
US 101, Milepost: 97.53, Direction: Both, Date Posted: 8/27/2014 9:28:00 AM, Original Date: 8/27/2014 12:00:00 AM
20,000 lbs per axle weight limit for BL.
US 101, Milepost: 313.55, Direction: Both, Date Posted: 8/27/2014 9:27:00 AM, Original Date: 8/27/2014 12:00:00 AM
44,000 lb weight limit for SA.
SR 20, Milepost: 42.04, Direction: Both, Date Posted: 8/27/2014 9:05:00 AM, Original Date: 4/23/2010 12:00:00 AM
21,500 lbs per axle for CL-8 & 20,500 per axle for BL.
SR 20, Milepost: 41.81, Direction: Both, Date Posted: 8/27/2014 9:04:00 AM, Original Date: 4/27/2010 12:00:00 AM
At Deception Pass State Park. 21,500 lbs per axle for CL-8 (5-axle combination) & 20,500 per axle for BL.
SR 11, Milepost: 19.83, Direction: Both, Date Posted: 8/27/2014 9:02:00 AM, Original Date: 8/27/2014 12:00:00 AM
21,000 per axle weight limit for BL.
SR 7, Milepost: 2.47, Direction: Both, Date Posted: 8/27/2014 8:55:00 AM, Original Date: 8/27/2014 12:00:00 AM
44,000 lbs axle weight for SA.
SR 6, Milepost: 50.94, Direction: Both, Date Posted: 8/27/2014 8:45:00 AM, Original Date: 8/27/2014 12:00:00 AM
21,500 per axle limit for BL.
SR 4, Milepost: 17.36, Direction: Both, Date Posted: 8/27/2014 8:34:00 AM, Original Date: 4/22/2010 12:00:00 AM
20,000 lbs per axle for BL & 41,000 lbs per axle weight for SA
US 2, Milepost: 48.7, Direction: Both, Date Posted: 8/27/2014 8:31:00 AM, Original Date: 8/27/2014 12:00:00 AM
41,500 weight limit for SA
SR 542, Milepost: 20.62, Direction: Both, Date Posted: 8/26/2014 4:08:00 PM, Original Date: 4/23/2010 12:00:00 AM
0.4 mi W of Hatchery Road. 19,000 lbs per axle for CL-8 & 17,500 for BL.
SR 525, Milepost: 8.36, Direction: Both, Date Posted: 8/26/2014 4:07:00 PM, Original Date: 4/27/2010 12:00:00 AM
0.1 miles South of Mukilteo Ferry Dock. 17,000 lbs per axle
SR 302, Milepost: 1.29, Direction: Both, Date Posted: 8/26/2014 4:04:00 PM, Original Date: 4/26/2010 12:00:00 AM
20,500 lb. per axle limit
SR 285, Milepost: 4.36, Direction: S, Date Posted: 8/26/2014 4:03:00 PM, Original Date: 4/1/2002 12:00:00 AM
20,000 lbs per axle for CL-8 & 19,000 lbs per axle for BL.
SR 261, Milepost: 57.9, Direction: Both, Date Posted: 8/26/2014 4:02:00 PM, Original Date: 4/23/2010 12:00:00 AM
5 mi S of Jct with I-90. 19,000 lb per axle weight limit.
SR 241, Milepost: 1.12, Direction: Both, Date Posted: 8/26/2014 4:01:00 PM, Original Date: 4/27/2010 12:00:00 AM
Legal axle weights only. Truck- 14 tons, Truck/Semi Trailer- 18 tons, Truck/Trailer - 22 ton.
SR 231, Milepost: 44.65, Direction: Both, Date Posted: 8/26/2014 3:56:00 PM, Original Date: 4/22/2010 12:00:00 AM
Just S. of Jct. with SR 291. 21,500 lbs per axle for BL. OVERLOADS TRAVEL CENTERLINE OF BRIDGE, traffic control is required.
SR 202, Milepost: 29.5, Direction: Both, Date Posted: 8/26/2014 3:55:00 PM, Original Date: 4/27/2010 12:00:00 AM
21,500 lb per axle weight limit. OVERLOADS TRAVEL CENTERLINE OF BRIDGE, traffic control is required.
SR 153, Milepost: 14, Direction: Both, Date Posted: 8/26/2014 3:54:00 PM, Original Date: 4/26/2010 12:00:00 AM
19,000 lb per axle limit
SR 109, Milepost: 21.39, Direction: Both, Date Posted: 8/26/2014 3:52:00 PM, Original Date: 4/26/2010 12:00:00 AM
In town of Copalis Beach. 20,000 lb per axle wt. limit
US 101, Milepost: 338.77, Direction: Both, Date Posted: 8/26/2014 3:48:00 PM, Original Date: 4/26/2010 12:00:00 AM
0.5 mi N or Purdy cutoff. 20,000 lb per axle limit. OVERLOADS TRAVEL CENTERLINE OF BRIDGE, traffic control is required.
US 101, Milepost: 120.4, Direction: Both, Date Posted: 8/26/2014 3:44:00 PM, Original Date: 4/27/2010 12:00:00 AM
2 mi S of town of Neilton. 20,000 lb per axle limit
US 101, Milepost: 20.32, Direction: Both, Date Posted: 8/26/2014 3:43:00 PM, Original Date: 10/18/2011 12:00:00 AM
7 mi N of City of Ilwaco. 20,000 lb per axle weight limit
US 12, Milepost: 144.89, Direction: Both, Date Posted: 8/26/2014 3:42:00 PM, Original Date: 4/23/2010 12:00:00 AM
21,000 lb per axle weight limit
US 2, Milepost: 31.07, Direction: Both, Date Posted: 8/26/2014 3:41:00 PM, Original Date: 4/27/2010 12:00:00 AM
21,500 lb per axle limit for BL.
SR 508, Milepost: 24.08, Direction: Both, Date Posted: 8/26/2014 3:37:00 PM, Original Date: 4/23/2010 12:00:00 AM
8 mi W of City of Morton. 19,500 lbs per axle for BL
SR 508, Milepost: 32.25, Direction: Both, Date Posted: 8/26/2014 3:37:00 PM, Original Date: 5/6/2010 12:00:00 AM
21,000 lbs per axle weight limit BL.
SR 153, Milepost: 22.31, Direction: Both, Date Posted: 8/26/2014 3:31:00 PM, Original Date: 4/26/2010 12:00:00 AM
19,000 per axle - BL & 35,500- SA weight limits
SR 153, Milepost: 16.85, Direction: Both, Date Posted: 8/26/2014 3:29:00 PM, Original Date: 4/26/2010 12:00:00 AM
41,500 weight limit for SA
SR 122, Milepost: 3.57, Direction: Both, Date Posted: 8/26/2014 3:24:00 PM, Original Date: 10/18/2011 12:00:00 AM
No axle to exceed 18,000 lbs.
US 101, Milepost: 30.62, Direction: Both, Date Posted: 8/26/2014 3:21:00 PM, Original Date: 10/18/2011 12:00:00 AM
4 mi S of town of Nemah. 21,500 lb per axle limit BL
SR 28, Milepost: 63.39, Direction: Both, Date Posted: 8/26/2014 3:19:00 PM, Original Date: 4/22/2010 12:00:00 AM
21,500 lbs per axle for BL
SR 9, Milepost: 42.86, Direction: Both, Date Posted: 8/26/2014 3:15:00 PM, Original Date: 4/26/2010 12:00:00 AM
20,000 lb per axle limit
I-5, Milepost: 164.80, Direction: N, Date Posted: 8/26/2014 3:13:00 PM, Original Date: 4/27/2010 12:00:00 AM
20,000 lb per axle BL weight limit. Ramps for I-90 Not affected, see Interchange Map.
SR 4, Milepost: 28.92, Direction: Both, Date Posted: 8/26/2014 3:02:00 PM, Original Date: 10/18/2011 12:00:00 AM
21,500 lbs per BL. Overloads shall travel Centerline of Bridge. Traffic Control is required.
SR 501, Milepost: 1 to 0, Direction: E, Date Posted: 7/2/2014 9:00:00 AM, Original Date: 5/26/2016 12:00:00 AM
SR501, MP 1 to 0. CAUTION: Height is 16'9". Signals on span wire at the intersections of SR 501 w/Columbia Street, Washington Street and Broadway Street. For detour call Erik Bjerke @ City of Vancouver, Transportation Engineering (360) 487-7729 or Diana Hintz (360) 397-2434. *WSDOT Does Not Guarantee Height Clearances*
SR 125, Milepost: 6.16 to 23.67, Direction: Both, Date Posted: 5/28/2014 8:43:00 AM, Original Date: 4/13/2009 12:00:00 AM
NO LOADS OVER 14' WIDE ALLOWED. Loads between 10'-14' wide require 3 pilots. Traffic to be stopped at guardrail and bridges. *WSDOT Does Not Guarantee Height Clearances*
SR 14, Milepost: 41.55, Direction: Both, Date Posted: 12/27/2013 11:45:00 AM, Original Date: 12/27/2013 12:00:00 AM
Bridge of the Gods crossing the Columbia River to Oregon. NOT ON SR 14, crossover to Cascade Locks, Oregon. The Bridge is limited to legal axle/gross weights up to 80,000 lbs. Effective April 1st, 2018 loads greater than 10' Wide, 14' high must contact Port of Cascade Locks at least 24 hours in advance of movement for permit and information at (541) 374-2418. *WSDOT Does Not Guarantee Height Clearances*
SR 10, Milepost: 103.76, Direction: Both, Date Posted: 10/24/2013 3:59:00 PM, Original Date: 10/24/2013 12:00:00 AM
CAUTION: Bridge height is 15'. If your height is over 14'10" alternate route is advised. *WSDOT Does Not Guarantee Height Clearances*
I-5, Milepost: 228.25, Direction: Both, Date Posted: 10/8/2013 8:29:00 AM, Original Date: 4/23/2010 12:00:00 AM
Limited to 20,000 lbs. per axle max. Loads over 20,000 lbs. must use alternate routes.
SR 202, Milepost: 21.8 to 26.1, Direction: Both, Date Posted: 9/12/2013 3:43:00 PM, Original Date: 7/1/2009 12:00:00 AM
SR 202 from milepost 21.8 to 26.1, both directions - No loads over 12'wide or 80' in load length. This is a permanent restriction. Detour is available. *WSDOT Does Not Guarantee Height Clearances*
I-90, Milepost: 276 to 299, Direction: Both, Date Posted: 6/4/2013 8:36:00 AM, Original Date: 4/13/2009 12:00:00 AM
Loads exceeding 16' wide require three escort vehicles and approval from Spokane Maintenance Area. *WSDOT Does Not Guarantee Height Clearances*
SR 520, Milepost: 1.63, Direction: Both, Date Posted: 6/4/2013 8:35:00 AM, Original Date: 4/13/2009 12:00:00 AM
No overwidth loads allowed. *WSDOT Does Not Guarantee Height Clearances*
SR 9, Milepost: 57.17 to 66.8, Direction: Both, Date Posted: 6/4/2013 8:35:00 AM, Original Date: 4/13/2009 12:00:00 AM
Mobile Homes restricted to 12 feet wide. Mobile Homes over 12' wide must contact Mount Vernon DOT at (360) 848-7230. *WSDOT Does Not Guarantee Height Clearances*
SR 17, Milepost: 75.27 to 96.57, Direction: Both, Date Posted: 6/4/2013 8:19:00 AM, Original Date: 4/1/2009 12:00:00 AM
From April 1 to September 30, loads exceeding 12' wide may move Tuesday thru Thursday from 9:00 AM and 3:00 PM. Three pilot cars required, two front and one rear. Weather permitting. Contact Ephrata DOT at (509) 754-2056. *WSDOT Does Not Guarantee Height Clearances*
SR 155, Milepost: 28.26, Direction: Both, Date Posted: 6/4/2013 8:17:00 AM, Original Date: 4/13/2009 12:00:00 AM
Clearance on Bridge below Grand Coulee Dam lowered to 14' 3" Use caution in this area - low clearance. *WSDOT Does Not Guarantee Height Clearances*
SR 165, Milepost: 11.50 to 11.60, Direction: Both, Date Posted: 6/4/2013 8:17:00 AM, Original Date: 4/13/2009 12:00:00 AM
Loads exceeding 12 ft. wide are prohibited. *WSDOT Does Not Guarantee Height Clearances*
SR 123, Milepost: 7.5 to 16.34, Direction: Both, Date Posted: 6/4/2013 8:16:00 AM, Original Date: 4/13/2009 12:00:00 AM
No commercial traffic allowed. *WSDOT Does Not Guarantee Height Clearances*
SR 124, Milepost: 0.0 to 44.98, Direction: Both, Date Posted: 6/4/2013 8:16:00 AM, Original Date: 4/13/2009 12:00:00 AM
All loads 12ft to 14 ft wide require 3 pilot cars. All loads 14ft to 16ft wide traveling between MP 0.0 to 9.73 must contact Pasco DOT @ (509) 545-2202 with a traffic control plan. The plan must be approved by the Pasco DOT office before permit can be issued. Loads traveling between MP 9.74 to 44.98 must contact the Walla Walla DOT @ (509) 527-4548 for approval before permit can be issued. LOADS OVER 16 FT WIDE PROHIBITED. From Milepost 9.74-44.98, Farm Equipment are Exempt from Restrictions, both directions. *WSDOT Does Not Guarantee Height Clearances*
SR 14, Milepost: 56.28 to 63.25, Direction: Both, Date Posted: 5/30/2013 3:22:00 PM, Original Date: 4/13/2009 12:00:00 AM
No loads over 12' wide allowed. *WSDOT Does Not Guarantee Height Clearances*
SR 243, Milepost: 0.0 to 28.26, Direction: Both, Date Posted: 5/30/2013 1:39:00 PM, Original Date: 4/13/2009 12:00:00 AM
No loads over 16 feet wide allowed. Please contact the Ephrata Maintenance Office at (509) 754-2056 for special considerations approval. *WSDOT Does Not Guarantee Height Clearances*
SR 202, Milepost: 0 to 7.03, Direction: Both, Date Posted: 2/5/2013 10:58:00 AM, Original Date: 11/9/2010 12:00:00 AM
SR 202 from Milepost 0 to Milepost 7.03 "all overdimensional loads must notify the City of Woodinville @ (425) 877-2291 prior to moving" *WSDOT Does Not Guarantee Height Clearances*
SR 9, Milepost: 10.87, Direction: Both, Date Posted: 2/5/2013 10:53:00 AM, Original Date: 11/15/2011 12:00:00 AM
This bridge crosses over SR9, it is not a mainline bridge.*WSDOT Does Not Guarantee Height Clearances*
US 12, Milepost: 21.31 to 46, Direction: Both, Date Posted: 1/31/2013 12:23:00 PM, Original Date: 2/17/2010 12:00:00 AM
Loads over 14’ wide are prohibited. *WSDOT Does Not Guarantee Height Clearances*
US 395, Milepost: 16.6 to 20.57, Direction: Both, Date Posted: 12/19/2012 9:48:00 AM, Original Date: 4/13/2009 12:00:00 AM
Traffic limited to 10' wide loads at all times. Detour by way of I-182 bridge. Requests for exemption contact Pasco DOT at (509) 545-2202. *WSDOT Does Not Guarantee Height Clearances*
US 12, Milepost: 0.5, Direction: W, Date Posted: 12/7/2012 8:19:00 AM, Original Date: 4/26/2010 12:00:00 AM
All Overweight loads shall travel the centerline of the Bridge.
SR 21, Milepost: 28.78, Direction: Both, Date Posted: 6/21/2012 12:02:00 PM, Original Date: 4/22/2010 12:00:00 AM
1.5 mi west of city of Lind. 21,000 lbs per axle for CL-8 (5-axles). Other vehicle configurations 17,500 per axle.
I-5, Milepost: 164.80, Direction: S, Date Posted: 6/21/2012 11:41:00 AM, Original Date: 4/27/2010 12:00:00 AM
I-5 SB 21,500 lb per axle limit. Traffic from I-90 Not affected. See Interchange Maps.
I-90, Milepost: 221.95, Direction: E, Date Posted: 6/18/2012 11:15:00 AM, Original Date: 4/27/2010 12:00:00 AM
"All loads shall travel the centerline of the Bridge"
US 101, Milepost: 83.22, Direction: Both, Date Posted: 5/25/2012 7:21:00 AM, Original Date: 4/26/2010 12:00:00 AM
21,000lbs per axle weigh limit, Overloads shall travel centerline of the northbound or southbound lanes.
US 12, Milepost: 37.59, Direction: Both, Date Posted: 5/24/2012 7:16:00 AM, Original Date: 4/22/2010 12:00:00 AM
2 mi east of City of Oakville. 21,500 lbs per axle weigh limit. Overloads shall travel centerline of the bridge, Traffic control is required.
SR 4, Milepost: 59.7, Direction: Both, Date Posted: 5/23/2012 2:18:00 PM, Original Date: 10/23/2009 12:00:00 AM
Loads over 17’ high are prohibited at signal bridge in Longview at Olympia Way/Kessler Blvd at MP 59.7, SR 4 -. *WSDOT Does Not Guarantee Height Clearances*
SR 14, Milepost: 18.89 to 34.66, Direction: Both, Date Posted: 1/24/2012 3:34:00 PM, Original Date: 4/13/2009 12:00:00 AM
Loads over 10' wide must have 1 front & 1 rear pilot. *WSDOT Does Not Guarantee Height Clearances*
SR 17, Milepost: 7.43 to 10.02, Direction: Both, Date Posted: 11/3/2011 8:45:00 AM, Original Date: 4/13/2009 12:00:00 AM
Loads over 12' wide require 3 pilot cars (2 front & 1 rear. *WSDOT Does Not Guarantee Height Clearances*
US 97, Milepost: 30.80, Direction: Both, Date Posted: 10/18/2011 3:18:00 PM, Original Date: 10/18/2011 12:00:00 AM
No axle to exceed 20,000 lbs.
SR 10, Milepost: 89.33, Direction: Both, Date Posted: 10/18/2011 3:12:00 PM, Original Date: 10/18/2011 12:00:00 AM
BL =20,000 lbs, CL-8 =20,000 lbs, SA = 40,000 lbs.
US 12, Milepost: 372.57, Direction: Both, Date Posted: 10/18/2011 2:54:00 PM, Original Date: 10/18/2011 12:00:00 AM
No axle to exceed 20,000 lbs.
US 12, Milepost: 307.31, Direction: Both, Date Posted: 10/18/2011 2:52:00 PM, Original Date: 10/18/2011 12:00:00 AM
20,000 lbs per axle limit for BL and CL-8 (5-axles)
SR 529, Milepost: 5.13, Direction: S, Date Posted: 10/18/2011 2:41:00 PM, Original Date: 10/18/2011 12:00:00 AM
20,000 per axle limit for BL and CL-8 (5-axles). 40,000 SA.
US 12, Milepost: 166 to 185.46, Direction: Both, Date Posted: 8/30/2011 3:13:00 PM, Original Date: 4/20/2010 12:00:00 AM
US-12, Mileposts 166 to 185.46 (Naches) Loads 14’ to 16’ wide will travel only from 11pm to 7am. Must provide detailed traffic control plan showing pull outs to allow traffic to pass also must include list of pullout locations and a back-up plan for breakdowns. 2 front pilots and 1 rear pilot required plus 1 WSP escorts. Loads over 16’ wide prohibited. Contact WSDOT Selah Maintenance Superintendent for any exceptions. This is a permanent restriction. **WSDOT does not guarantee height clearances**
I-5, Milepost: 114.86, Direction: N, Date Posted: 2/9/2011 11:57:00 AM, Original Date: 6/6/2017 12:00:00 AM
Limited to 21,500 lbs. per axle max. Overloads must use center lane.
SR 14, Milepost: 56.28 to 63.25, Direction: Both, Date Posted: 8/9/2010 3:43:00 PM, Original Date: 8/9/2010 12:00:00 AM
Loads over 8'6" to 10' wide require 1 front pilot car. Loads over 10' to 12' wide require 3 pilot cars (2 front with minimum separation of 500', + 1 rear). #1 pilot to warn oncoming traffic, #2 to stop oncoming traffic. ALL OVERHEIGHT LOADS(over 14' high) must contact the Goldendale Office @ (509) 773-4533. Detour via Cook-Underwood Rd, for approval from Skamania County contact Teddi at @ (509) 427-3920. *WSDOT Does Not Guarantee Height Clearances*
US 12, Milepost: 138 to 166, Direction: Both, Date Posted: 6/10/2010 11:25:00 AM, Original Date: 9/18/2009 12:00:00 AM
Loads exceeding 14 feet wide must call the Selah Maintenance Office prior to movement. (509) 577-1920, Office hours M-F 8a-4p*WSDOT Does Not Guarantee Height Clearances*
SR 14, Milepost: 83.53 to 19, Direction: Both, Date Posted: 6/10/2010 11:25:00 AM, Original Date: 4/13/2009 12:00:00 AM
Loads over 125ft - trailer/load length prohibited. Detour available via OR. *WSDOT Does Not Guarantee Height Clearances*
SR 26, Milepost: 132.05, Direction: Both, Date Posted: 6/10/2010 11:19:00 AM, Original Date: 4/9/2009 12:00:00 AM
CAUTION: Bridge height is 15'10". If your height is over 15'8" alternate route advised. *WSDOT Does Not Guarantee Height Clearances*
I-90, Milepost: 279.8, Direction: E, Date Posted: 6/8/2010 3:50:00 PM, Original Date: 4/9/2009 12:00:00 AM
CAUTION: Height is 14'2" to 15'3" Eastbound I-90 to Southbound US 195 Interchange, Extremely low on one side. Detour route may be available with use of city streets. *WSDOT Does Not Guarantee Height Clearances*
US 97, Milepost: 0 to 1.89, Direction: Both, Date Posted: 6/8/2010 3:39:00 PM, Original Date: 4/13/2009 12:00:00 AM
"Loads over 10’ wide require 2 pilot vehicles. Loads over 12' wide require 3 pilots vehicles and Loads exceeding 15' wide. or 125' length require 3 pilot vehicles and 24 hour notice to Goldendale DOT office (509) 773-4533. When 3 pilot vehicles are required the 2 front will have minimum separation of 500', #1 pilot to warn oncoming traffic, #2 pilot to stop oncoming traffic as necessary." *WSDOT Does Not Guarantee Height Clearances*
SR 103, Milepost: 0 to 19.95, Direction: Both, Date Posted: 6/8/2010 2:22:00 PM, Original Date: 4/13/2009 12:00:00 AM
NO LOADS OVER 12' WIDE ALLOWED. For loads over 12' there is a county road, Sandridge Rd., that parallels 103 that can be used. It has numerous cross over streets to 103 and intersects US 101 at MP 13.9. For County approval call Pacific Co (360) 875-9368. *WSDOT Does Not Guarantee Height Clearances*
SR 529, Milepost: 5.42, Direction: S, Date Posted: 4/27/2010 2:53:00 PM, Original Date: 4/27/2010 12:00:00 AM
18,000 lbs per axle weight limit
SR 520, Milepost: 1.20, Direction: Both, Date Posted: 4/27/2010 2:51:00 PM, Original Date: 4/27/2010 12:00:00 AM
18,500 lb per axle weight limit
SR 509, Milepost: 6.54, Direction: Both, Date Posted: 4/27/2010 2:48:00 PM, Original Date: 4/27/2010 12:00:00 AM
21,500 lb per axle weight limit
SR 202, Milepost: 26, Direction: Both, Date Posted: 4/27/2010 2:44:00 PM, Original Date: 4/27/2010 12:00:00 AM
South side of city of Snoqualmie. 21,500 per axle weight limit
SR 165, Milepost: 11.9, Direction: Both, Date Posted: 4/27/2010 2:40:00 PM, Original Date: 4/27/2010 12:00:00 AM
20,000 lbs axle weight limit
SR 165, Milepost: 11.93, Direction: Both, Date Posted: 4/27/2010 2:38:00 PM, Original Date: 4/27/2010 12:00:00 AM
21,500 lb axle limit
SR 542, Milepost: 22.63, Direction: Both, Date Posted: 4/27/2010 10:15:00 AM, Original Date: 4/27/2010 12:00:00 AM
0.2 mi W of Jct with SR 547 at Kendall. 20,500 lb per axle weight limit.
SR 529, Milepost: 3.82, Direction: N, Date Posted: 4/27/2010 9:38:00 AM, Original Date: 4/27/2010 12:00:00 AM
No over legal axle weights. Legal loads only. Maximum weight 105,500.
SR 524, Milepost: 6.68, Direction: Both, Date Posted: 4/27/2010 9:32:00 AM, Original Date: 4/27/2010 12:00:00 AM
No over legal axle weights. Legal loads only. Maximum weight 105,500.
US 101, Milepost: 203.15, Direction: Both, Date Posted: 4/27/2010 8:44:00 AM, Original Date: 4/27/2010 12:00:00 AM
ALL OVERLOADS TRAVEL CENTERLINE OF BRIDGE-MAX SPEED 20 MPH. Traffic control is required (traffic control=flaggers to stop traffic on both sides of bridge to allow load to cross using center line of bridge.)
SR 112, Milepost: 1.48, Direction: Both, Date Posted: 4/27/2010 8:42:00 AM, Original Date: 4/27/2010 12:00:00 AM
20,000 lb. per axle limit
SR 112, Milepost: 23.72, Direction: Both, Date Posted: 4/27/2010 8:38:00 AM, Original Date: 4/27/2010 12:00:00 AM
20,000 lb per axle weight limit
SR 112, Milepost: 26.59, Direction: Both, Date Posted: 4/27/2010 8:38:00 AM, Original Date: 4/27/2010 12:00:00 AM
20,500 lb. per axle limit
SR 112, Milepost: 46.28, Direction: Both, Date Posted: 4/27/2010 8:37:00 AM, Original Date: 4/27/2010 12:00:00 AM
20,000 lb per axle weight limit
SR 302, Milepost: 15.65, Direction: Both, Date Posted: 4/26/2010 3:25:00 PM, Original Date: 4/26/2010 12:00:00 AM
19,500 lbs per axle weight limit
US 12, Milepost: 8.33, Direction: Both, Date Posted: 4/26/2010 3:20:00 PM, Original Date: 4/26/2010 12:00:00 AM
1.3 mi est of City of Montesano. 21,500 lb per axle limit
SR 169, Milepost: 5.2, Direction: Both, Date Posted: 4/26/2010 2:25:00 PM, Original Date: 4/26/2010 12:00:00 AM
1.5 mi W of City of Black Diamond. 20,000 lb per axle limit
SR 16, Milepost: 7.28, Direction: N, Date Posted: 4/26/2010 2:15:00 PM, Original Date: 4/26/2010 12:00:00 AM
When traveling from Tacoma to Gig Harbor, all Trucks over 105,500 lbs shall use both lanes in the direction of travel. Trucks must straddle steel grate decking between lanes. All tires must remain on the paved surface.
I-5, Milepost: 209.35, Direction: N, Date Posted: 4/26/2010 10:24:00 AM, Original Date: 4/26/2010 12:00:00 AM
20,000 lb per axle weight limit
SR 530, Milepost: 28.78, Direction: Both, Date Posted: 4/26/2010 10:23:00 AM, Original Date: 4/26/2010 12:00:00 AM
20,000 lb per axle weight limit
SR 9, Milepost: 87.16, Direction: Both, Date Posted: 4/23/2010 9:37:00 AM, Original Date: 4/23/2010 12:00:00 AM
3 mi S of Jct with SR 544. 20,500 lbs per axle limit.
SR 507, Milepost: 20.43, Direction: Both, Date Posted: 4/23/2010 8:45:00 AM, Original Date: 4/23/2010 12:00:00 AM
SR 507, MP 20.43 19,000 lb per axle weight limit
SR 504, Milepost: 17.29, Direction: E, Date Posted: 4/23/2010 8:42:00 AM, Original Date: 4/23/2010 12:00:00 AM
EB, 18,000 lb per axle limit
SR 122, Milepost: 1.03, Direction: Both, Date Posted: 4/23/2010 8:31:00 AM, Original Date: 4/23/2010 12:00:00 AM
20,000 BL 20,000 CL-8 40,000 SA
SR 141, Milepost: 23.2, Direction: Both, Date Posted: 4/23/2010 8:28:00 AM, Original Date: 4/23/2010 12:00:00 AM
1.5 mi S of town of Trout Lake, 21,000 lbs per axle weight limit.
SR 409, Milepost: 2.92, Direction: Both, Date Posted: 4/22/2010 3:44:00 PM, Original Date: 4/22/2010 12:00:00 AM
S end of city of Cathlamet. 20,000 lb axle weight limit. Both directions
US 101, Milepost: 32.52, Direction: Both, Date Posted: 4/22/2010 3:37:00 PM, Original Date: 4/22/2010 12:00:00 AM
20,000 lb axle limit
SR 26, Milepost: 40.44, Direction: Both, Date Posted: 4/22/2010 3:01:00 PM, Original Date: 4/22/2010 12:00:00 AM
Overloads travel centerline of bridge. Traffic control is required.
US 12, Milepost: 323.06, Direction: Both, Date Posted: 4/22/2010 2:59:00 PM, Original Date: 4/22/2010 12:00:00 AM
No axle to exceed 19,500 lbs for the BL on bridge, Highway 12, MP 323.06 both directions
US 195, Milepost: 37.46, Direction: Both, Date Posted: 4/22/2010 2:54:00 PM, Original Date: 4/22/2010 12:00:00 AM
21,500 lbs per axle for CL-8
SR 26, Milepost: 132.94, Direction: Both, Date Posted: 4/22/2010 2:50:00 PM, Original Date: 4/22/2010 12:00:00 AM
No axle to exceed 20,500 lbs
SR 290, Milepost: .82, Direction: Both, Date Posted: 4/22/2010 2:44:00 PM, Original Date: 4/22/2010 12:00:00 AM
In City of Spokane, 17,000 lbs per axle weight limit
SR 206, Milepost: 11.09, Direction: Both, Date Posted: 4/22/2010 2:37:00 PM, Original Date: 4/22/2010 12:00:00 AM
0.2 mi E. Kellog Road. 21,500 per axle limit
SR 31, Milepost: 21.04, Direction: Both, Date Posted: 4/22/2010 2:27:00 PM, Original Date: 4/22/2010 12:00:00 AM
0.6 miles North of city of Metaline Falls, 20,500 lb per axle limit.
US 101, Milepost: 176.57, Direction: Both, Date Posted: 4/22/2010 11:21:00 AM, Original Date: 4/22/2010 12:00:00 AM
Overloads travel centerline of bridge. Traffic control is required.
US 12, Milepost: 360.28, Direction: Both, Date Posted: 4/22/2010 11:15:00 AM, Original Date: 4/22/2010 12:00:00 AM
Overloads travel centerline of bridge. Traffic control is required.
SR 14, Milepost: 65, Direction: Both, Date Posted: 3/26/2010 12:49:00 PM, Original Date: 4/13/2009 12:00:00 AM
Hood River Bridge crossing Columbia River to Oregon. NOT ON SR 14 (on Oregon 35). NO OVERWIDTH LOADS ALLOWED. Bridge is limited to legal weight only. Contact Port of Hood River for information. Total Gross Wt. Limit 80,000 bs. Each single axle limit 20,000lbs. Tandem axles limit 34,000 lbs. *WSDOT Does Not Guarantee Height Clearances*
SR 530, Milepost: 32.8 to 39, Direction: Both, Date Posted: 1/22/2010 8:20:00 AM, Original Date: 4/13/2009 12:00:00 AM
Mobile homes restricted to 12 feet wide. MH over 12 feet wide must contact MT. Vernon DOT at (360) 848-7230. *WSDOT Does Not Guarantee Height Clearances*
SR 410, Milepost: 57.67 to 70, Direction: Both, Date Posted: 1/20/2010 7:44:00 AM, Original Date: 4/13/2009 12:00:00 AM
No commercial traffic permitted north entrance of Mt Rainier National Park. *WSDOT Does Not Guarantee Height Clearances*
SR 20, Milepost: 342.08 to 331.32, Direction: Both, Date Posted: 1/19/2010 3:41:00 PM, Original Date: 4/8/2009 12:00:00 AM
"May have intermittent restrictions to oversize vehicles due to weather. During early winter and spring thaw, these restrictions rapidly and sporadically change. Please call Colville DOT at (509) 684-7434 for the most current restriction information available." *WSDOT Does Not Guarantee Height Clearances*
SR 11, Milepost: 11.12 to 14.3, Direction: Both, Date Posted: 1/19/2010 3:40:00 PM, Original Date: 4/13/2009 12:00:00 AM
Closed to all oversize loads (width, height, length and/or weight) until further notice. All vehicles in excess of 18000 GVW are not allowed, except vehicles connected with the operation, maintenance & construction of the highway. For information contact Bellingham at (360) 788-2500. *WSDOT Does Not Guarantee Height Clearances*
SR 821, Milepost: .29 to 25.21, Direction: Both, Date Posted: 1/13/2010 3:21:00 PM, Original Date: 4/13/2009 12:00:00 AM
Closed May 15th thru September 15th of every year to "Commercial Truck Combinations" but remains open for single vehicles and local delivery combination vehicles. *WSDOT Does Not Guarantee Height Clearances*
SR 14, Milepost: 19 to 56, Direction: Both, Date Posted: 1/13/2010 10:41:00 AM, Original Date: 4/13/2009 12:00:00 AM
From MP 19 (1 mile east of Washougal) to MP 56 (Cook-Underwood Rd) all loads exceeding 14 ft wide are required to have 2 front pilot cars & 1 rear pilot car. *WSDOT Does Not Guarantee Height Clearances*
I-5, Milepost: 164.5 to 170, Direction: N, Date Posted: 12/21/2009 3:51:00 PM, Original Date: 4/13/2009 12:00:00 AM
No loads over 14FT 9IN HIGH. *WSDOT Does Not Guarantee Height Clearances*
SR 505, Milepost: 0.03, Direction: Both, Date Posted: 10/20/2009 12:04:00 PM, Original Date: 4/13/2009 12:00:00 AM
Low ground clearance of 12 inches. Signed and marked with detours. *WSDOT Does Not Guarantee Height Clearances*
SR 203, Milepost: 0 to 18, Direction: Both, Date Posted: 10/20/2009 12:01:00 PM, Original Date: 7/1/2009 12:00:00 AM
SR 203 from milepost 0 to 18, both directions- Thru traffic is limited to 12 feet wide and 80 feet in load length. Route open to local oversize movements. *WSDOT Does Not Guarantee Height Clearances*
SR 16, Milepost: 5.05 to 7.28, Direction: W, Date Posted: 10/20/2009 11:48:00 AM, Original Date: 4/13/2009 12:00:00 AM
When traveling from Tacoma to Gig Harbor, all overwidth loads and all trucks over 105,500 lb shall use both lanes in the direction of travel. Trucks must straddle steel grate decking between lanes. All tires must remain on the paved surface. *WSDOT Does Not Guarantee Height Clearances* .
SR 14, Milepost: 76.77 to 76.91, Direction: Both, Date Posted: 10/20/2009 11:47:00 AM, Original Date: 4/13/2009 12:00:00 AM
Loads over 10 ft wide require 3 pilot cars (2 front with minimum separation of 500'+ 1 rear). #1 pilot to warn oncoming traffic, #2 pilot to stop oncoming traffic. ALL OVERHEIGHT LOADS (over 14' high) must contact the Goldendale Office @ (509) 773-4533. *WSDOT Does Not Guarantee Height Clearances*
US 2, Milepost: 118.46, Direction: E, Date Posted: 10/20/2009 11:39:00 AM, Original Date: 4/13/2009 12:00:00 AM
Left turns are prohibited Eastbound from US2 onto School Street. Contact Chelan County (509) 667-6415 for detour.(Suggest turn @ milepost 115.10 Easy Street) Overheight loads eastbound may need to exit US2 earlier to bypass restrictions on US 2 in Wenatchee. *WSDOT Does Not Guarantee Height Clearances*