Bid Results Archive 10/2018 - 11/2019

 

Search by bid opening date:

OCTOBER: 10/24 | 10/31
SEPTEMBER:
9/5 | 9/11 | 9/25
AUGUST:
8/7 | 8/14 | 8/21
JULY: 7/10 | 7/17 | 7/24
JUNE:
6/5 | 6/12 | 6/19 | 6/26
MAY: 5/1 | 5/8 | 5/15 | 5/22 | 5/30
APRIL: 4/1 | 4/8 | 4/15
MARCH: 3/4 | 3/11
FEBRUARY:
2/5 | 2/12 | 2/20 | 2/26
JANUARY:
1/8 | 1/15 | 1/23
DECEMBER: 12/4 | 12/11 | 12/18
NOVEMBER: 11/6 | 11/14 | 11/20

Past Bid Opening Results are available online for 6 months after bid opening.
Please note: A Public Records Request is required to disseminate any information not listed here.


4/15/2020 Bid Opening - Olympia, WA

Item No. 1: COLUMBIA CENTER BLVD-PEDESTRIAN FACILITY IMPROVEMENT
Contract Number: 9542
Engineer's Estimate: $1,123,715.00
No. of Addenda: 1
Number of Bidders: 3/3

Award Status: Awarded 4/20/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Apollo, Inc. - $997,040.15
Apparent 2nd: Moreno & Nelson Construction Corp. - $1,047,736.25**
Apparent 3rd: Neppel Electrical & Controls, LLC - $1,336,893.85

VERIFIED BID TOTAL RESULTS

Low Bidder: Apollo, Inc.
Bid Amount: $997,040.15

Bid Information:

2nd Bidder: Moreno & Nelson Construction Corp.
Bid Amount: $1,047,736.24

Bid Information:

3rd Bidder: Neppel Electrical & Controls, LLC
Bid Amount: $1,336,893.85

Bid Information:


Item No. 2: SIGN STRUCTURE AND VMS REPLACEMENT
Contract Number: 9547
Engineer's Estimate: $1,562,108.00
No. of Addenda: 2
Number of Bidders: 7/2

Award Status: Awarded 4/28/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Northeast Electric, LLC - $1,717,573.00
Apparent 2nd: Granite Construction Company - $1,893,974.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Northeast Electric, LLC - Awarded 4/28/2020
Bid Amount: $1,717,573.00

Bid Information:

2nd Bidder: Granite Construction Company
Bid Amount: $1,893,974.00

Bid Information:


Item No. 3: SR 516 VIC TO S 204TH - DEMO No. 1
Contract Number: 9537
Engineer's Estimate: $498,002.00
No. of Addenda: 4
Number of Bidders: 5/4

Award Status: Awarded 4/28/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Northwest Cascade, Inc. - $344,318.00**
Apparent 2nd: Skycorp, Ltd - $345,302.00
Apparent 3rd: Dickson Company - $387,217.05

VERIFIED BID TOTAL RESULTS

Low Bidder: Northwest Cascade, Inc. - Awarded 4/28/2020
Bid Amount: $341,818.00

2nd Bidder: Skycorp, Ltd
Bid Amount: $345,302.00

3rd Bidder: Dickson Company
Bid Amount: $387,217.05


4/8/2020 Bid Opening - Olympia, WA

Item No. 1: FRANKLIN CO LINE TO LEE RD SB LANES - PAVING
Contract Number: 9541
Engineer's Estimate: $3,843,048.55
No. of Addenda: 3
Number of Bidders: 4/4

Award Status: Awarded 4/20/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Central Washington Asphalt, Inc. - $2,888,888.00
Apparent 2nd: Poe Asphalt Paving, Inc. - $2,909,849.10
Apparent 3rd: Interstate Concrete & Asphalt Company - $3,028,130.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Central Washington Asphalt, Inc. - Awarded 4/20/2020
Bid Amount: $2,888,888.00

Bid Information:

2nd Bidder: Poe Asphalt Paving, Inc.
Bid Amount: $2,909,849.10

Bid Information:

3rd Bidder: Interstate Concrete & Asphalt Company
Bid Amount: $3,028,130.00

Bid Information:


Item No. 2: WOODLAND VICINITY HORSESHOE LAKE UPGRADE PUMP SYSTEM
Contract Number: 9529
Engineer's Estimate: $1,820,171.00
No. of Addenda: 5
Number of Bidders: 15/8

Award Status: Awarded 4/13/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Rotschy, Inc. - $1,363,609.00
Apparent 2nd: Stellar J. Corporation - $1,487,078.00
Apparent 3rd: M.J. Hughes Construction, Inc. - $1,546,265.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Rotschy, Inc. - Awarded 4/13/2020
Bid Amount: $1,363,609.00

Bid Information:

2nd Bidder: Stellar J. Corporation
Bid Amount: $1,487,078.00

Bid Information:

3rd Bidder: M.J. Hughes Construction, Inc.
Bid Amount: $1,546,265.00

Bid Information:


No. 3: ANDERSON RD SAFETY IMPROVEMENT
Contract Number: 9535
Engineer's Estimate: $1,476,311.00
No. of Addenda: 3
Number of Bidders: 6/5

Award Status: Awarded 4/13/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Rognlin's, Inc. - $1,105,000.00
Apparent 2nd: Barcott Construction, LLC - $1,121,485.28**
Apparent 3rd: Granite Construction Company - $1,159,159.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Rognlin's, Inc. - Awarded 4/13/2020
Bid Amount: $1,105,000.00

Bid Information:

2nd Bidder: Barcott Construction, LLC
Bid Amount: $1,121,485.29

Bid Information:

3rd Bidder: Granite Construction Company
Bid Amount: $1,159,159.00

Bid Information:


4/1/2020 Bid Opening - Olympia, WA

Item No. 1: INSTALL SHOULDER RUMBLE STRIP
Contract Number: 9536
Engineer's Estimate: $528,624.94
No. of Addenda: 2
Number of Bidders: 5/4

Award Status: Awarded 4/20/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Specialized Pavement Marking, Inc. - $477,309.10
Apparent 2nd: North Star Enterprises I, Inc. - $556,187.50
Apparent 3rd: Construction Ahead, Inc. DBA Pavement Surface Control - $719,013.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Specialized Pavement Marking, Inc. - Awarded 4/20/2020
Bid Amount: $477,309.10

2nd Bidder: North Star Enterprises I, Inc.
Bid Amount: $556,187.50

3rd Bidder: Construction Ahead, Inc. DBA Pavement Surface Control
Bid Amount: $719,013.00


Item No. 2: SR 397 INTERCHANGE EB BRIDGE REPAIR
Contract Number: 9530
Engineer's Estimate: $472,371.00
No. of Addenda: 3
Number of Bidders: 8/4

Award Status: Awarded 4/15/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Apollo, Inc. - $437,784.60
Apparent 2nd: Selby Bridge Company, Inc. - $616,902.00
Apparent 3rd: Max J. Kuney Company - $719,000.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Apollo, Inc. - Awarded 4/15/2020
Bid Amount: $437,784.60

2nd Bidder: Selby Bridge Company, Inc.
Bid Amount: $616,902.00

3rd Bidder: Max J. Kuney Company
Bid Amount: $719,000.00


Item No. 3: HIGHPOINT TO SR 18 - FIBER EXTENSION
Contract Number: 9538
Engineer's Estimate: $598,158.00
No. of Addenda: 2
Number of Bidders: 4/4

Award Status: ALL BIDS REJECTED 5/5/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Elcon Corporation - $785,907.00
Apparent 2nd: Totem Electric of Tacoma, Inc. - $834,251.00
Apparent 3rd: Northeast Electric, LLC - $880,645.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Elcon Corporation
Bid Amount: $785,907.00

2nd Bidder: Totem Electric of Tacoma, Inc.
Bid Amount: $834,251.00

3rd Bidder: Northeast Electric, LLC
Bid Amount: $880,645.00


Item No. 4: SALNAVE RD TO BNSF RR BRIDGE PAVING
Contract Number: 9534
Engineer's Estimate: $2,038,023.00
No. of Addenda: 2
Number of Bidders: 3/3

Award Status: Awarded 4/20/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Shamrock Paving, Inc. - $1,673,673.00
Apparent 2nd: CPM Development Corporation DBA Inland Asphalt Company - $1,819,919.00
Apparent 3rd: Poe Asphalt Paving, Inc. - $1,874,778.80

VERIFIED BID TOTAL RESULTS

Low Bidder: Shamrock Paving, Inc. - Awarded 4/20/2020
Bid Amount: $1,673,673.00

Bid Information:

2nd Bidder: CPM Development Corporation DBA Inland Asphalt Company
Bid Amount: $1,819,919.00

Bid Information:

3rd Bidder: Poe Asphalt Paving, Inc.
Bid Amount: $1,874,778.80

Bid Information:


Item No. 5: WHITE PASS VICINITY MAJOR DRAINAGE PHASE 3
Contract Number: 9533
Engineer's Estimate: $1,010,381.27
No. of Addenda: 2
Number of Bidders: 10/5

Award Status: Awarded 4/15/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: KRCI, LLC - $895,634.00
Apparent 2nd: Boettcher & Sons, Inc. - $1,090,715.00
Apparent 3rd: Graham Contracting, Ltd. - $1,096,123.00

VERIFIED BID TOTAL RESULTS

Low Bidder: KRCI, LLC - Awarded 4/15/2020
Bid Amount: $895,634.00

Bid Information:

2nd Bidder: Boettcher & Sons, Inc.
Bid Amount: $1,090,715.00

Bid Information:

3rd Bidder: Graham Contracting, Ltd.
Bid Amount: $1,096,123.00

Bid Information:


Item No. 6: E OF MAIN AVE TO W OF 166TH AVE E - INSTALL CABLE BARRIER
Contract Number: 9532
Engineer's Estimate: $442,886.00
No. of Addenda: 1
Number of Bidders: 5/4

Award Status: Awarded 4/15/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Petersen Brothers, Inc. - $384,622.86
Apparent 2nd: Massana Construction, Inc. - $459,608.00
Apparent 3rd: Coral Construction Company - $525,333.00**

VERIFIED BID TOTAL RESULTS

Low Bidder: Petersen Brothers, Inc. - Awarded 4/15/2020
Bid Amount: $384,622.86

Bid Information:

2nd Bidder: Massana Construction, Inc. - Rejected 4/9/2020
Bid Amount: $459,608.00

Bid Information:

3rd Bidder: Dirt and Aggregate Interchange, Inc.
Bid Amount: $489,494.00

Bid Information:


3/11/2020 Bid Opening - Olympia, WA

Item No. 1: SILICA RD TO ADAMS CO LINE CABLE BARRIER UPGRADES
Contract Number: 9528
Engineer's Estimate: $3,333,368.75 $3,330,368.75
No. of Addenda: 2
Number of Bidders: 5/5

Award Status: Awarded 3/23/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Coral Construction Company - $3,050,777.00
Apparent 2nd: Massana Construction, Inc. - $3,127,620.02
Apparent 3rd: Petersen Brothers, Inc. - $3,551,708.57

VERIFIED BID TOTAL RESULTS

Low Bidder: Coral Construction Company - Awarded 3/23/2020
Bid Amount: $3,050,777.00

Bid Information:

2nd Bidder: Massana Construction, Inc.
Bid Amount: $3,127,620.02

Bid Information:

3rd Bidder: Petersen Brothers, Inc.
Bid Amount: $3,551,708.57

Bid Information:


Item No. 2: 2020 EASTERN REGION CHIP SEAL
Contract Number: 9526
Engineer's Estimate: $6,301,816.63
No. of Addenda: 3
Number of Bidders: 4/4

Award Status: Awarded 3/18/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Central Washington Asphalt, Inc. - $5,529,603.41
Apparent 2nd: Granite Construction Company - $5,820,820.00
Apparent 3rd: Poe Asphalt Paving, Inc. - $5,979,014.12

VERIFIED BID TOTAL RESULTS

Low Bidder: Central Washington Asphalt, Inc. - Awarded 3/18/2020
Bid Amount: $5,529,603.41

Bid Information:

2nd Bidder: Granite Construction Company
Bid Amount: $5,820,820.00

Bid Information:

3rd Bidder: Poe Asphalt Paving, Inc.
Bid Amount: $5,979,014.12

Bid Information:


3/4/2020 Bid Opening - Olympia, WA

Item No. 1: NCR 19-21 WEATHERING STEEL GUARDRAIL REHABILITATION
Contract Number: 9525
Engineer's Estimate: $1,033,344.48
No. of Addenda: 1
Number of Bidders: 4/4

Award Status: Awarded 3/13/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Frank Gurney, Inc. - $859,585.14
Apparent 2nd: Petersen Brothers, Inc. - $1,002,767.09
Apparent 3rd: Dirt and Aggregate Interchange, Inc. - $1,053,297.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Frank Gurney, Inc. - Awarded 3/13/2020
Bid Amount: $859,585.14

Bid Information:

2nd Bidder: Petersen Brothers, Inc.
Bid Amount: $1,002,767.09

Bid Information:

3rd Bidder: Dirt and Aggregate Interchange, Inc.
Bid Amount: $1,053,297.00

Bid Information:


2/26/2020 Bid Opening - Olympia, WA

Item No. 1: US 101 TO KANDOLL RD VIC AND US 101 TO SR 4 - CHIP SEAL
Contract Number: 9527
Engineer's Estimate: $2,882,175.37
No. of Addenda: 1
Number of Bidders: 3/2

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Granite Construction Company - $2,555,255.00
Apparent 2nd: Doolittle Construction, LLC - $2,685,366.29

VERIFIED BID TOTAL RESULTS

Low Bidder: Granite Construction Company
Bid Amount: $2,555,255.00

Bid Information:

2nd Bidder: Doolittle Construction, LLC
Bid Amount: $2,685,366.29

Bid Information:


2/20/2020 Bid Opening - Olympia, WA

Item No. 1: BAGLEY AND SIEBERT CREEKS REMOVE FISH BARRIERS
Contract Number: 9516
Engineer's Estimate: $26,637,102.79
No. of Addenda: 3
Number of Bidders: 15/8

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Interwest Construction, Inc. - $21,885,060.78
Apparent 2nd: Scarsella Bros., Inc. - $22,329,329.29
Apparent 3rd: Max J. Kuney Company - $27,071,381.44

VERIFIED BID TOTAL RESULTS

Low Bidder: Interwest Construction, Inc. - Rejected 2/24/2020
Bid Amount: $21,885,060.78

Bid Information:

2nd Bidder: Scarsella Bros., Inc.
Bid Amount: $22,329,329.29

Bid Information:

3rd Bidder: Max J. Kuney Company
Bid Amount: $27,071,381.44

Bid Information:


Item No. 2: NCR SIGN UPDATE 19-21
Contract Number: 9524
Engineer's Estimate: $397,803.00
No. of Addenda: 0
Number of Bidders: 6/3

Award Status: Awarded 2/28/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Construction Ahead, Inc. DBA Pavement Surface Control - $424,783.00
Apparent 2nd: Transportation Systems, Inc. - $520,566.00
Apparent 3rd: Road Products, Inc. - $956,753.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Construction Ahead, Inc. DBA Pavement Surface Control - Awarded 2/28/2020
Bid Amount: $424,783.00

2nd Bidder: Transportation Systems, Inc.
Bid Amount: $520,566.00

3rd Bidder: Road Products, Inc.
Bid Amount: $956,753.00


Item No. 3: CLINTON FERRY TERMINAL PAINTING PRESERVATION
Contract Number: 9521
Engineer's Estimate: $948,504.00
No. of Addenda: 0
Number of Bidders: 6/4

Award Status: Awarded 2/25/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Panther Industrial Painting, LLC. - $877,504.00
Apparent 2nd: Metro Painting, LLC - $894,464.00
Apparent 3rd: Southern Road & Bridge, LLC - $2,023,004.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Panther Industrial Painting, LLC. - Awarded 2/25/2020
Bid Amount: $877,504.00

2nd Bidder: Metro Painting, LLC
Bid Amount: $894,464.00

3rd Bidder: Southern Road & Bridge, LLC
Bid Amount: $2,023,004.00


Item No. 4: HOAG'S CREEK FISH PASSAGE
Contract Number: 9523
Engineer's Estimate: $1,474,848.80
No. of Addenda: 1
Number of Bidders: 12/6

Award Status: Awarded 2/28/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Strider Construction Co., Inc. - $868,883.00
Apparent 2nd: Tiger Construction, Ltd. - $998,632.80
Apparent 3rd: Faber Construction Corp. - $1,200,271.80

VERIFIED BID TOTAL RESULTS

Low Bidder: Strider Construction Co., Inc. - Exonerated 2/26/2020
Bid Amount: $868,883.00

Bid Information:

2nd Bidder: Tiger Construction, Ltd. - Awarded 2/28/2020
Bid Amount: $998,632.80

Bid Information:

3rd Bidder: Faber Construction Corp.
Bid Amount: $1,200,271.80

Bid Information:


2/12/2020 Bid Opening - Olympia, WA

Item No. 1: SR 202 TO SNOQUALMIE VALLEY TRAIL BRIDGE SEISMIC RETROFIT
Contract Number: 9520
Engineer's Estimate: $2,636,168.00
No. of Addenda: 0
Number of Bidders: 11/8

Award Status: Awarded 2/19/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Massana Construction, Inc. - $2,227,531.00
Apparent 2nd: Combined Construction, Inc. - $2,262,633.00
Apparent 3rd: Graham Contracting, Ltd. - $2,432,333.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Massana Construction, Inc. - Awarded 2/19/2020
Bid Amount: $2,227,531.00

Bid Information:

2nd Bidder: Combined Construction, Inc.
Bid Amount: $2,262,633.00

Bid Information:

3rd Bidder: Graham Contracting, Ltd.
Bid Amount: $2,432,333.00

Bid Information:


Item No. 2: SCR 2020 REGION WIDE CHIP SEAL AND PAVEMENT PRESERVATION
Contract Number: 9519
Engineer's Estimate: $3,560,028.40
No. of Addenda: 0
Number of Bidders: 3/3

Award Status: Awarded 2/19/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Interstate Concrete & Asphalt Company - $2,900,004.60
Apparent 2nd: Central Washington Asphalt, Inc. - $3,444,444.00
Apparent 3rd: Granite Construction Company - $3,488,884.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Interstate Concrete & Asphalt Company - Awarded 2/19/2020
Bid Amount: $2,900,004.60

Bid Information:

2nd Bidder: Central Washington Asphalt, Inc.
Bid Amount: $3,444,444.00

Bid Information:

3rd Bidder: Granite Construction Company
Bid Amount: $3,488,884.00

Bid Information:


Item No. 3: EDMONDS FERRY TERMINAL PAVEMENT REPAIRS (SMALL WORKS ROSTER)
Contract Number: 9522
Engineer's Estimate: $123,053.00
No. of Addenda: 0
Number of Bidders: 4/3

Award Status: Awarded 2/13/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Granite Construction Company - $96,467.00
Apparent 2nd: Massana Construction, Inc. - $113,143.00
Apparent 3rd: Accord Contractors, LLC - $139,899.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Granite Construction Company - Awarded 2/13/2020
Bid Amount: $96,467.00

2nd Bidder: Massana Construction, Inc.
Bid Amount: $113,143.00

3rd Bidder: Accord Contractors, LLC
Bid Amount: $139,899.00


2/5/2020 Bid Opening - Olympia, WA

Item No. 1: I-5 TO SR 7 EB CONGESTION MANAGEMENT
Contract Number: 9515
Engineer's Estimate: $395,876.00
No. of Addenda: 1
Number of Bidders: 7/7

Award Status: Awarded 2/25/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Northeast Electric, LLC - $406,736.00

Apparent 2nd: Transportation Systems, Inc. - $408,787.00

Apparent 3rd: TITAN Earthwork, LLC - $492,736.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Northeast Electric, LLC - Awarded 2/25/2020
Bid Amount: $406,736.00

2nd Bidder: Transportation Systems, Inc.
Bid Amount: $408,787.00

3rd Bidder: TITAN Earthwork, LLC
Bid Amount: $492,736.00


Item No. 2: I-5 TO 61ST AVE NE PAVING & ADA COMPLIANCE
Contract Number: 9501
Engineer's Estimate: $12,462,947.00
No. of Addenda: 7
Number of Bidders: 8/5

Award Status: Awarded 2/13/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: TITAN Earthwork, LLC - $11,140,445.00

Apparent 2nd: C.A. Carey Corporation - $11,768,719.40

Apparent 3rd: Ceccanti, Inc. - $12,787,026.00

VERIFIED BID TOTAL RESULTS

Low Bidder: TITAN Earthwork, LLC - Awarded 2/13/2020
Bid Amount: $11,140,445.00

Bid Information:

2nd Bidder: C.A. Carey Corporation
Bid Amount: $11,768,719.40

Bid Information:

3rd Bidder: Ceccanti, Inc.
Bid Amount: $12,787,026.00

Bid Information:


Item No. 3: SR 167 COMPLETION DEMO #5
Contract Number: 9517
Engineer's Estimate: $289,117.00 $389,117.00
No. of Addenda: 1
Number of Bidders: 5/4

Award Status: Awarded 2/12/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Skycorp, Ltd - $149,797.00

Apparent 2nd: 3 Kings Environmental, Inc. - $167,397.00

Apparent 3rd: R.W. Scott Construction Co. - $233,233.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Skycorp, Ltd - Awarded 2/12/2020
Bid Amount: $149,797.00

2nd Bidder: 3 Kings Environmental, Inc.
Bid Amount: $167,397.00

3rd Bidder: R.W. Scott Construction Co.
Bid Amount: $233,233.00


Item No. 4: 2019-21 ER REGIONWIDE BASIC SAFETY-SIGNING REBID
Contract Number: 9518
Engineer's Estimate:
Base: $120,204.00
Base + A1: $156,000.04 $156,004.00
Base + A1 + A2: $228,904.00
Funds Available: $228,904.00
No. of Addenda: 0
Number of Bidders: 6/4

Award Status: Awarded 2/12/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Stripe Rite, Inc.

Apparent 2nd: Road Products, Inc.

Apparent 3rd: Construction Ahead, Inc. DBA Pavement Surface Control

VERIFIED BID TOTAL RESULTS

Low Bidder: Stripe Rite, Inc. - Awarded 2/12/2020

2nd Bidder: Road Products, Inc.

3rd Bidder: Construction Ahead, Inc. DBA Pavement Surface Control


1/23/2020 Bid Opening - Olympia, WA

Item No. 1: SR 124 TO MCNARY POOL EASTBOUND PAVING
Contract Number: 9512
Engineer's Estimate: $1,189,743.95
No. of Addenda: 2
Number of Bidders: 3/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Central Washington Asphalt, Inc. - $687,231.85

Apparent 2nd: CPM Development Corporation DBA Inland Asphalt Company - $737,737.37

Apparent 3rd: Granite Construction Company - $828,912.05

VERIFIED BID TOTAL RESULTS

Low Bidder: Central Washington Asphalt, Inc.
Bid Amount: $687,231.85

Bid Information:

2nd Bidder: CPM Development Corporation DBA Inland Asphalt Company
Bid Amount: $737,737.37

Bid Information:

 

3rd Bidder: Granite Construction Company
Bid Amount: $828,912.05

Bid Information:


Item No. 2: SPOKANE RIVER E TRENT BR REPLACE BRIDGE
Contract Number: 9509
Engineer's Estimate: $18,428,247.34
No. of Addenda: 6
Number of Bidders: 9/4

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Garco Construction, Inc. - $20,149,777.00

Apparent 2nd: Max J. Kuney Company - $21,701,400.00

Apparent 3rd: N.A. Degerstrom, Inc. - $23,988,148.50

VERIFIED BID TOTAL RESULTS

Low Bidder: Garco Construction, Inc.
Bid Amount: $20,149,777.00

Bid Information:

2nd Bidder: Max J. Kuney Company
Bid Amount: $21,701,400.00

Bid Information:

 

3rd Bidder: N.A. Degerstrom, Inc.
Bid Amount: $23,988,148.50

Bid Information:


1/15/2020 Bid Opening - Olympia, WA

Item No. 1: SPRAGUE I/C TO ARGONNE I/C - PAVING
Contract Number: 9505
Engineer's Estimate: $7,235,056.50
No. of Addenda: 5
Number of Bidders: 4/3

Award Status: Awarded 1/23/2020

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Shamrock Paving, Inc. - $5,777,777.00

Apparent 2nd: CPM Development Corporation - $6,197,197.00

Apparent 3rd: Poe Asphalt Paving, Inc. - $6,975,200.50

VERIFIED BID TOTAL RESULTS

Low Bidder: Shamrock Paving, Inc. - Awarded 1/23/2020
Bid Amount: $5,777,777.00

Bid Information:

2nd Bidder: CPM Development Corporation
Bid Amount: $6,197,197.00

Bid Information:

3rd Bidder: Poe Asphalt Paving, Inc.
Bid Amount: $6,975,200.50

Bid Information:

 


1/8/2020 Bid Opening - Olympia, WA

Item No. 1: NB DUWAMISH RIVER BRIDGE SELECT GRID DECK REPLACEMENT
Contract Number: 9510
Engineer's Estimate: $626,328.00
No. of Addenda: 5
Number of Bidders: 11/3

Award Status: Awarded 1/16/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: C.A. CAREY CORPORATION - $897,273.00

Apparent 2nd: COMBINED CONSTRUCTION, INC. - $1,665,633.00

Apparent 3rd: ABHE & SVOBODA, INC. - $1,984,910.00

VERIFIED BID TOTAL RESULTS

Low Bidder: C.A. CAREY CORPORATION - Awarded 1/16/2020
Bid Amount: $897,273.00

Bid Information:

2nd Bidder: COMBINED CONSTRUCTION, INC.
Bid Amount: $1,665,633.00

Bid Information:

3rd Bidder: ABHE & SVOBODA, INC.
Bid Amount: $1,984,910.00

Bid Information:


Item No. 2: EASTSIDE NE POINTS DR AND 92ND AVE SLIDE & PAVEMENT REPAIR (SMALL WORKS ROSTER)
Contract Number: 9508
Engineer's Estimate: $82,468.10
No. of Addenda: 1
Number of Bidders: 4/2

Award Status: Awarded 1/14/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: ACCORD CONTRACTORS LLC - $92,361.00

Apparent 2nd: GRANITE CONSTRUCTION COMPANY - $280,031.00

VERIFIED BID TOTAL RESULTS

Low Bidder: ACCORD CONTRACTORS LLC - Awarded 1/14/2020
Bid Amount: $92,361.00

2nd Bidder: GRANITE CONSTRUCTION COMPANY
Bid Amount: $280,031.00

 


Item No. 3: GARDEN SPRINGS TO BROADWAY AVE RAMP METERS
Contract Number: 9507
Engineer's Estimate: $3,147,038.00
No. of Addenda: 1
Number of Bidders: 3/3

Award Status: Awarded 1/16/2020

PRELIMINARY BID TOTAL RESULTS
Apparent Low: NORTHEAST ELECTRIC, LLC - $2,873,828.50

Apparent 2nd: POWER CITY ELECTRIC - $2,950,126.00

Apparent 3rd: COLVICO, INC. - $2,989,831.00

VERIFIED BID TOTAL RESULTS

Low Bidder: NORTHEAST ELECTRIC, LLC - Awarded 1/16/2020
Bid Amount: $2,873,828.50

Bid Information:

2nd Bidder: POWER CITY ELECTRIC
Bid Amount: $2,950,126.00

Bid Information:

3rd Bidder: COLVICO, INC.
Bid Amount: $2,989,831.00

Bid Information:


Item No. 4: ROCK SLOPE SCALING
Contract Number: 9511
Engineer's Estimate: $651,846.25
No. of Addenda: 2
Number of Bidders: 7/2

Award Status: Awarded 1/14/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: STRIDER CONSTRUCTION CO., INC. - $660,265.20

Apparent 2nd: GRANITE CONSTRUCTION COMPANY - $811,000.00

VERIFIED BID TOTAL RESULTS

Low Bidder: STRIDER CONSTRUCTION CO., INC. - Awarded 1/14/2020
Bid Amount: $660,265.20

2nd Bidder: GRANITE CONSTRUCTION COMPANY
Bid Amount: $811,000.00


Item No. 5: YEW WAY RAILROAD CROSSING IMPROVEMENT
Contract Number: 9503
Engineer's Estimate: $665,457.00
No. of Addenda: 4
Number of Bidders: 5/2

Award Status: Awarded 1/16/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: AWARD CONSTRUCTION, INC. - $743,729.10

Apparent 2nd: TAYLOR'S EXCAVATORS INC - $1,200,707.00

VERIFIED BID TOTAL RESULTS

Low Bidder: AWARD CONSTRUCTION, INC. - Awarded 1/16/2020
Bid Amount: $743,729.10

Bid Information:

2nd Bidder: TAYLOR'S EXCAVATORS INC
Bid Amount: $1,200,707.00

Bid Information:


Item No. 6: SNAKE LAKE AND UNION AVE VMS REPLACEMENT
Contract Number: 9504
Engineer's Estimate: $486,704.00
No. of Addenda: 3
Number of Bidders: 5/5

Award Status: Awarded 1/16/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: NORTHEAST ELECTRIC LLC - $432,110.00

Apparent 2nd: TOTEM ELECTRIC OF TACOMA, INC. - $456,624.00

Apparent 3rd: TITAN EARTHWORK LLC - $461,204.00

VERIFIED BID TOTAL RESULTS

Low Bidder: NORTHEAST ELECTRIC LLC - Awarded 1/16/2020
Bid Amount: $432,110.00

Bid Information:

2nd Bidder: TOTEM ELECTRIC OF TACOMA, INC.
Bid Amount: $456,624.00

Bid Information:

3rd Bidder: TITAN EARTHWORK LLC
Bid Amount: $461,204.00

Bid Information:


1/23/2020 Bid Opening - Olympia, WA

Item No. 1: SR 124 TO MCNARY POOL EASTBOUND PAVING
Contract Number: 9512
Engineer's Estimate: $1,189,743.95
No. of Addenda: 2
Number of Bidders: 3/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Central Washington Asphalt, Inc. - $687,231.85

Apparent 2nd: CPM Development Corporation DBA Inland Asphalt Company - $737,737.37

Apparent 3rd: Granite Construction Company - $828,912.05

VERIFIED BID TOTAL RESULTS

Low Bidder: Central Washington Asphalt, Inc.
Bid Amount: $687,231.85

Bid Information:

2nd Bidder: CPM Development Corporation DBA Inland Asphalt Company
Bid Amount: $737,737.37

Bid Information:

 

3rd Bidder: Granite Construction Company
Bid Amount: $828,912.05

Bid Information:


Item No. 2: SPOKANE RIVER E TRENT BR REPLACE BRIDGE
Contract Number: 9509
Engineer's Estimate: $18,428,247.34
No. of Addenda: 6
Number of Bidders: 9/4

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Garco Construction, Inc. - $20,149,777.00

Apparent 2nd: Max J. Kuney Company - $21,701,400.00

Apparent 3rd: N.A. Degerstrom, Inc. - $23,988,148.50

VERIFIED BID TOTAL RESULTS

Low Bidder: Garco Construction, Inc.
Bid Amount: $20,149,777.00

Bid Information:

2nd Bidder: Max J. Kuney Company
Bid Amount: $21,701,400.00

Bid Information:

 

3rd Bidder: N.A. Degerstrom, Inc.
Bid Amount: $23,988,148.50

Bid Information:


1/15/2020 Bid Opening - Olympia, WA

Item No. 1: SPRAGUE I/C TO ARGONNE I/C - PAVING
Contract Number: 9505
Engineer's Estimate: $7,235,056.50
No. of Addenda: 5
Number of Bidders: 4/3

Award Status: Awarded 1/23/2020

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Shamrock Paving, Inc. - $5,777,777.00

Apparent 2nd: CPM Development Corporation - $6,197,197.00

Apparent 3rd: Poe Asphalt Paving, Inc. - $6,975,200.50

VERIFIED BID TOTAL RESULTS

Low Bidder: Shamrock Paving, Inc. - Awarded 1/23/2020
Bid Amount: $5,777,777.00

Bid Information:

2nd Bidder: CPM Development Corporation
Bid Amount: $6,197,197.00

Bid Information:

3rd Bidder: Poe Asphalt Paving, Inc.
Bid Amount: $6,975,200.50

Bid Information:

 


1/8/2020 Bid Opening - Olympia, WA

Item No. 1: NB DUWAMISH RIVER BRIDGE SELECT GRID DECK REPLACEMENT
Contract Number: 9510
Engineer's Estimate: $626,328.00
No. of Addenda: 5
Number of Bidders: 11/3

Award Status: Awarded 1/16/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: C.A. CAREY CORPORATION - $897,273.00

Apparent 2nd: COMBINED CONSTRUCTION, INC. - $1,665,633.00

Apparent 3rd: ABHE & SVOBODA, INC. - $1,984,910.00

VERIFIED BID TOTAL RESULTS

Low Bidder: C.A. CAREY CORPORATION - Awarded 1/16/2020
Bid Amount: $897,273.00

Bid Information:

2nd Bidder: COMBINED CONSTRUCTION, INC.
Bid Amount: $1,665,633.00

Bid Information:

3rd Bidder: ABHE & SVOBODA, INC.
Bid Amount: $1,984,910.00

Bid Information:


Item No. 2: EASTSIDE NE POINTS DR AND 92ND AVE SLIDE & PAVEMENT REPAIR (SMALL WORKS ROSTER)
Contract Number: 9508
Engineer's Estimate: $82,468.10
No. of Addenda: 1
Number of Bidders: 4/2

Award Status: Awarded 1/14/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: ACCORD CONTRACTORS LLC - $92,361.00

Apparent 2nd: GRANITE CONSTRUCTION COMPANY - $280,031.00

VERIFIED BID TOTAL RESULTS

Low Bidder: ACCORD CONTRACTORS LLC - Awarded 1/14/2020
Bid Amount: $92,361.00

2nd Bidder: GRANITE CONSTRUCTION COMPANY
Bid Amount: $280,031.00

 


Item No. 3: GARDEN SPRINGS TO BROADWAY AVE RAMP METERS
Contract Number: 9507
Engineer's Estimate: $3,147,038.00
No. of Addenda: 1
Number of Bidders: 3/3

Award Status: Awarded 1/16/2020

PRELIMINARY BID TOTAL RESULTS
Apparent Low: NORTHEAST ELECTRIC, LLC - $2,873,828.50

Apparent 2nd: POWER CITY ELECTRIC - $2,950,126.00

Apparent 3rd: COLVICO, INC. - $2,989,831.00

VERIFIED BID TOTAL RESULTS

Low Bidder: NORTHEAST ELECTRIC, LLC - Awarded 1/16/2020
Bid Amount: $2,873,828.50

Bid Information:

2nd Bidder: POWER CITY ELECTRIC
Bid Amount: $2,950,126.00

Bid Information:

3rd Bidder: COLVICO, INC.
Bid Amount: $2,989,831.00

Bid Information:


Item No. 4: ROCK SLOPE SCALING
Contract Number: 9511
Engineer's Estimate: $651,846.25
No. of Addenda: 2
Number of Bidders: 7/2

Award Status: Awarded 1/14/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: STRIDER CONSTRUCTION CO., INC. - $660,265.20

Apparent 2nd: GRANITE CONSTRUCTION COMPANY - $811,000.00

VERIFIED BID TOTAL RESULTS

Low Bidder: STRIDER CONSTRUCTION CO., INC. - Awarded 1/14/2020
Bid Amount: $660,265.20

2nd Bidder: GRANITE CONSTRUCTION COMPANY
Bid Amount: $811,000.00


Item No. 5: YEW WAY RAILROAD CROSSING IMPROVEMENT
Contract Number: 9503
Engineer's Estimate: $665,457.00
No. of Addenda: 4
Number of Bidders: 5/2

Award Status: Awarded 1/16/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: AWARD CONSTRUCTION, INC. - $743,729.10

Apparent 2nd: TAYLOR'S EXCAVATORS INC - $1,200,707.00

VERIFIED BID TOTAL RESULTS

Low Bidder: AWARD CONSTRUCTION, INC. - Awarded 1/16/2020
Bid Amount: $743,729.10

Bid Information:

2nd Bidder: TAYLOR'S EXCAVATORS INC
Bid Amount: $1,200,707.00

Bid Information:


Item No. 6: SNAKE LAKE AND UNION AVE VMS REPLACEMENT
Contract Number: 9504
Engineer's Estimate: $486,704.00
No. of Addenda: 3
Number of Bidders: 5/5

Award Status: Awarded 1/16/2020

PRELIMINARY BID TOTAL RESULTS

Apparent Low: NORTHEAST ELECTRIC LLC - $432,110.00

Apparent 2nd: TOTEM ELECTRIC OF TACOMA, INC. - $456,624.00

Apparent 3rd: TITAN EARTHWORK LLC - $461,204.00

VERIFIED BID TOTAL RESULTS

Low Bidder: NORTHEAST ELECTRIC LLC - Awarded 1/16/2020
Bid Amount: $432,110.00

Bid Information:

2nd Bidder: TOTEM ELECTRIC OF TACOMA, INC.
Bid Amount: $456,624.00

Bid Information:

3rd Bidder: TITAN EARTHWORK LLC
Bid Amount: $461,204.00

Bid Information:


12/18/2019 Bid Opening - Olympia, WA

Item No. 1: WASHINGTON STATE RURAL RAIL REHABILITATION PROJECT
Contract Number: 9502
Engineer's Estimate:
Base: $8,664,666.70
Base + A1: $8,754,666.70
Base + A1 + A2: $8,844,666.70
Funds Available: $8,852,191.00
No. of Addenda: 1
Number of Bidders: 10/3

Award Status: Awarded 1/13/2020

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Halme Construction

Apparent 2nd: Garco Construction, Inc.

Apparent 3rd: Railworks Track Systems, Inc.

VERIFIED BID TOTAL RESULTS

Low Bidder: Halme Construction
Bid Amount:

Bid Information:

2nd Bidder: Garco Construction, Inc.
Bid Amount:

Bid Information:

3rd Bidder: Railworks Track Systems, Inc.
Bid Amount:

Bid Information:

 


Item No. 2: STRATEGIC PAVEMENT PRESERVATION MAINTENANCE AREA 2 (19-21)
Contract Number: 9499
Engineer's Estimate: $495,434.00
No. of Addenda: 0
Number of Bidders: 4/3

Award Status: Awarded 12/26/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Construction Ahead, Inc. DBA Pavement Surface Control - $445,445.00
Apparent 2nd: Belarde Company, Inc. - $460,360.00**
Apparent 3rd: Doolittle Construction, LLC - $588,194.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Belarde Company, Inc. - Rejected 12/18/2019
Bid Amount: $227,204.00

2nd Bidder Low Bidder: Construction Ahead, Inc. DBA Pavement Surface Control - Awarded 12/26/2019
Bid Amount: $445,445.00

3rd Bidder Second Bidder: Doolittle Construction, LLC
Bid Amount: $588,194.00


Item No. 3: EAGLE FALLS VIC TO TYE CREEK BRIDGE DECK OVERLAY
Contract Number: 9494
Engineer's Estimate: $2,136,748.50
No. of Addenda: 2
Number of Bidders: 9/6

Award Status: Awarded 1/8/2020

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Max J. Kuney Company - $2,963,086.00
Apparent 2nd: Lakeside Industries, Inc. - $2,969,064.00
Apparent 3rd: C.A. Carey Corporation - $3,095,745.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Max J. Kuney Company - Awarded 1/8/2020
Bid Amount: $2,963,086.00

Bid Information:

2nd Bidder: Lakeside Industries, Inc.
Bid Amount: $2,969,064.00

Bid Information:

3rd Bidder: C.A. Carey Corporation
Bid Amount: $3,095,745.00

Bid Information:


Item No. 4: KINGSTON FERRY TERMINAL SLIP 1 BRIDGE SEAT SCOUR REPAIR
Contract Number: 9506
Engineer's Estimate: $502,703.00
No. of Addenda: 0
Number of Bidders: 10/2

Award Status: Awarded 12/26/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Pacific Pile & Marine, L.P. - $439,803.00
Apparent 2nd: Rognlin's, Inc. - $847,003.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Pacific Pile & Marine, L.P. - Awarded 12/26/2019
Bid Amount: $439,803.00

2nd Bidder: Rognlin's, Inc.
Bid Amount: $847,003.00


12/11/2019 Bid Opening - Olympia, WA

Item No. 1: POINT DEFIANCE/TAHLEQUAH FERRY TERMINAL PAINTING
Contract Number:9497
Engineer's Estimate: $971,553.00
No. of Addenda: 0
Number of Bidders: 7/4

Award Status: Awarded 12/17/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Panther Industrial Painting, LLC. - $864,503.00
Apparent 2nd: HCI Industrial & Marine Coatings, Inc. - $904,703.00
Apparent 3rd: Long Painting Company - $995,103.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Panther Industrial Painting, LLC. - Awarded 12/17/2019
Bid Amount: $864,503.00

2nd Bidder: HCI Industrial & Marine Coatings, Inc.
Bid Amount: $904,703.00

3rd Bidder: Long Painting Company - Rejected 12/20/2019
Bid Amount: $995,103.00


Item No. 2: NCR SEAL 2020
Contract Number: 9500
Engineer's Estimate: $6,212,887.21
No. of Addenda: 2
Number of Bidders: 3/3

Award Status: Awarded 12/17/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Granite Construction Company - $6,231,000.00
Apparent 2nd: Central Washington Asphalt, Inc. - $6,422,829.82
Apparent 3rd: Interstate Concrete & Asphalt Company - $7,041,601.92

VERIFIED BID TOTAL RESULTS

Low Bidder: Granite Construction Company - Awarded 12/17/2019
Bid Amount: $6,231,000.00

Bid Information:

2nd Bidder: Central Washington Asphalt, Inc.
Bid Amount: $6,422,829.82

Bid Information:

3rd Bidder: Interstate Concrete & Asphalt Company
Bid Amount: $7,041,601.92

Bid Information:


12/4/2019 Bid Opening - Olympia, WA

Item No. 1: LOWER HOH ROAD INTERSECTION IMPROVEMENTS (SMALL WORKS ROSTER)
Contract Number: 9492
Engineer's Estimate: $242,375.00
No. of Addenda: 0
Number of Bidders: 11/7

Award Status: Awarded 12/10/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Barcott Construction, LLC - $222,492.92
Apparent 2nd: Interwest Construction, Inc. - $235,675.95
Apparent 3rd: Active Construction, Inc. - $243,243.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Barcott Construction, LLC - Awarded 12/10/2019
Bid Amount: $222,492.92

2nd Bidder: Interwest Construction, Inc.
Bid Amount: $235,675.95

3rd Bidder: Active Construction, Inc.
Bid Amount: $243,243.00


Item No. 2: 5TH ST TO S H ST - PAVING AND ADA COMPLIANCE
Contract Number: 9491
Engineer's Estimate: $5,263,880.00
No. of Addenda: 0
Number of Bidders: 5/4

Award Status: Awarded 12/17/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Rognlin's, Inc. - $5,590,134.90
Apparent 2nd: Tucci & Sons, Inc. - $5,861,749.00
Apparent 3rd: Quigg Bros., Inc. - $6,393,655.25

VERIFIED BID TOTAL RESULTS

Low Bidder: Rognlin's, Inc. - Awarded 12/17/2019
Bid Amount: $5,590,134.90

Bid Information:

2nd Bidder: Tucci & Sons, Inc.
Bid Amount: $5,861,749.00

Bid Information:

3rd Bidder: Quigg Bros., Inc.
Bid Amount: $6,393,655.25

Bid Information:


Item No. 3: INTERSECTION AND RAILROAD CROSSING IMPROVEMENTS
Contract Number: 9495
Engineer's Estimate: $526,735.00
No. of Addenda: 1
Number of Bidders: 3/3

Award Status: Awarded 12/10/2019

PRELIMINARY BID TOTAL RESULTS

Apparent Low: Northeast Electric, LLC - $435,686.00
Apparent 2nd: Power City Electric, Inc. - $607,395.50
Apparent 3rd: Colvico, Inc. - $656,979.75

VERIFIED BID TOTAL RESULTS

Low Bidder: Northeast Electric, LLC - Awarded 12/10/2019
Bid Amount: $435,686.00

2nd Bidder: Power City Electric, Inc.
Bid Amount: $607,395.50

3rd Bidder: Colvico, Inc.
Bid Amount: $656,979.75


11/20/2019 Bid Opening - Olympia, WA

Item No. 1: EASTSIDE OF STEVENS PASS - PAVING
Contract Number: 9487
Engineer's Estimate: $3,447,180.19
No. of Addenda: 2
Number of Bidders: 4/4

Award Status: Awarded 11/26/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Interstate Concrete & Asphalt Company - $3,053,997.31
Apparent 2nd: Central Washington Asphalt, Inc. - $3,085,955.51
Apparent 3rd: Granite Construction Company - $3,658,195.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Interstate Concrete & Asphalt Company - Awarded 11/26/2019
Bid Amount: $3,053,997.31

Bid Information:

2nd Bidder: Central Washington Asphalt, Inc.
Bid Amount: $3,085,955.51

Bid Information:

3rd Bidder: Granite Construction Company
Bid Amount: $3,658,195.00

Bid Information:


Item No. 2: UNNAMED TRIBUTARY TO HOH RIVER - REMOVE FISH BARRIER
Contract Number: 9486
Engineer's Estimate: $1,094,851.00
No. of Addenda: 1
Number of Bidders: 10/5

Award Status: Awarded 12/2/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Interwest Construction, Inc. - $1,113,445.00**
Apparent 2nd: Quigg Bros., Inc. - $1,177,286.00
Apparent 3rd: Active Construction, Inc. - $1,245,245.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Interwest Construction, Inc. - Awarded 12/2/2019
Bid Amount: $1,113,405.00

Bid Information:

2nd Bidder: Quigg Bros., Inc.
Bid Amount: $1,177,286.00

Bid Information:

3rd Bidder: Active Construction, Inc.
Bid Amount: $1,245,245.00

Bid Information:


Item No. 3: SEA-TAC NB WEIGH STATION 1 - WEIGH STATION PRESERVATION
Contract Number: 9489
Engineer's Estimate: $586,615.00
No. of Addenda: 2
Number of Bidders: 8/7

Award Status: Awarded 11/27/2019

PRELIMINARY BID TOTAL RESULTS

Apparent Low: CPM Development Corporation DBA Icon Materials - $339,697.90
Apparent 2nd: Lakeside Industries, Inc. - $356,052.00
Apparent 3rd: Tucci & Sons, Inc. - $374,538.40

VERIFIED BID TOTAL RESULTS

Low Bidder: CPM Development Corporation DBA Icon Materials - Awarded 11/27/2019
Bid Amount: $339,697.90

2nd Bidder: Lakeside Industries, Inc.
Bid Amount: $356,052.00

3rd Bidder: Tucci & Sons, Inc.
Bid Amount: $374,538.40

 


11/14/2019 Bid Opening - Olympia, WA

Item No. 1: 7 MI. W OF RAINY PASS FLOOD DEFLECTION BERM
Contract Number: 9485
Engineer's Estimate: $693,537.54
No. of Addenda: 0
Number of Bidders: 14/7

Award Status: Awarded 11/21/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: TIGER CONSTRUCTION, LTD. - $497,730.01**
Apparent 2nd: STRIDER CONSTRUCTION CO., INC. - $509,769.00
Apparent 3rd: KRCI LLC - $541,466.00

VERIFIED BID TOTAL RESULTS

Low Bidder: TIGER CONSTRUCTION, LTD. - Awarded 11/21/2019
Bid Amount: $497,730.00

2nd Bidder: STRIDER CONSTRUCTION CO., INC.
Bid Amount: $509,769.00

3rd Bidder: KRCI LLC
Bid Amount: $541,466.00


Item No. 2: ACME VIC TO MT BAKER HIGHWAY VIC VIRTUAL WEIGH IN MOTION
Contract Number: 9488
Engineer's Estimate: $358,026.90
No. of Addenda: 1
Number of Bidders: 3/2

Award Status: Awarded 11/18/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: NORTHEAST ELECTRIC, LLC - $329,848.00
Apparent 2nd: GRANITE CONSTRUCTION COMPANY - $528,637.00

VERIFIED BID TOTAL RESULTS

Low Bidder: NORTHEAST ELECTRIC, LLC - Awarded
Bid Amount: $329,848.00

2nd Bidder: GRANITE CONSTRUCTION COMPANY
Bid Amount: $528,637.00


Item No. 3: BENCH RD INTERSECTION IMPROVEMENTS
Contract Number: 9484
Engineer's Estimate: $1,409,224.28
No. of Addenda: 3
Number of Bidders: 8/3

Award Status: Awarded 11/26/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: CAMERON-REILLY LLC - $1,552,789.61
Apparent 2nd: GRAHAM CONTRACTING, LTD. - $1,575,268.61
Apparent 3rd: HURST CONSTRUCTION LLC - $1,639,363.31**

VERIFIED BID TOTAL RESULTS

Low Bidder: CAMERON-REILLY LLC - Awarded 11/26/2019
Bid Amount: $1,552,789.61

Bid Information:

2nd Bidder: GRAHAM CONTRACTING, LTD.
Bid Amount: $1,575,268.61

Bid Information:

3rd Bidder: HURST CONSTRUCTION LLC
Bid Amount: $1,638,821.31

Bid Information:


11/6/2019 Bid Opening - Olympia, WA

Item No. 1: PACIFIC AVE S TO CANYON RD E PAVING & BRIDGE REPAIR
Contract Number: 9483
Engineer's Estimate: $1,628,967.00
No. of Addenda: 1
Number of Bidders: 8/3

Award Status: Awarded 11/14/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Tucci & Sons, Inc. - $1,305,503.50
Apparent 2nd: Miles Resources, LLC - $1,398,657.60
Apparent 3rd: Granite Construction Company - $1,895,951.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Tucci & Sons, Inc. - Awarded
Bid Amount: $1,305,503.50

Bid Information:

2nd Bidder: Miles Resource, LLC
Bid Amount: $1,398,657.60

Bid Information:

3rd Bidder: Granite Construction Company
Bid Amount: $1,895,951.00

Bid Information:


9/25/2019 Bid Opening - Olympia, WA

Item No. 1: NE 154TH ST TO SR 502 MEDIAN BARRIER
Contract Number: 9481
Engineer's Estimate: $1,524,717.25
No. of Addenda: 2
Number of Bidders: 10/8

Award Status: Awarded - 10/3/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Rotschy, Inc. - $1,788,863.17
Apparent 2nd: Cascade Bridge, LLC - $1,956,468.50
Apparent 3rd: Tapani, Inc. - $1,961,083.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Rotschy, Inc.
Bid Amount: $1,788,863.17

Bid Information:

2nd Bidder: Cascade Bridge, LLC
Bid Amount: $1,956,468.50

Bid Information:

3rd Bidder: Tapani, Inc. - Rejected
Bid Amount: $1,961,083.00

Bid Information:


9/11/2019 Bid Opening - Olympia, WA

Item No. 1: LEWIS AND CLARK BRIDGE UPGRADE ELECTRICAL
Contract Number: 9479
Engineer's Estimate: $1,837,886.60
No. of Addenda: 1
Number of Bidders: 4/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Mill Plain Electric, LLC - $1,445,006.00
Apparent 2nd: Northeast Electric, LLC - $1,528,504.00
Apparent 3rd: Colvico, Inc. - $2,141,508.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Mill Plain Electric, LLC
Bid Amount: $1,445,006.00

Bid Information:

2nd Bidder: Northeast Electric, LLC
Bid Amount: $1,528,504.00

Bid Information:

3rd Bidder: Colvico, Inc.
Bid Amount: $2,141,508.00

Bid Information:


9/5/2019 Bid Opening - Olympia, WA

Item No. 1: PV HOOPER TRACK IMPROVEMENTS
Contract Number: 9472
Engineer's Estimate: $2,818,492.50
No. of Addenda: 3
Number of Bidders: 2/2

Award Status: AWARDED 9/10/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: RAILWORKS TRACK SYSTEMS, INC. - $2,728,907.00
Apparent 2nd: H & H ENGINEERING CONSTRUCTION, INC. - $3,857,363.00

VERIFIED BID TOTAL RESULTS

Low Bidder: RAILWORKS TRACK SYSTEMS, INC.
Bid Amount: $2,728,907.00

Bid Information:

2nd Bidder: H & H ENGINEERING CONSTRUCTION, INC.
Bid Amount: $3,857,363.00

Bid Information:


Item No. 2: I-90 & SR 18 INTERCHANGE AUXILIARY RAMP                           
Contract Number: 9476
Engineer's Estimate: $780,474.50
No. of Addenda: 0
Number of Bidders: 13/10

Award Status: AWARDED 9/10/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: ROAD CONSTRUCTION NORTHWEST, INC. - $646,162.00
Apparent 2nd: ACTIVE CONSTRUCTION, INC. - $709,709.00
Apparent 3rd: TUCCI & SONS, INC. - $762,562.75

VERIFIED BID TOTAL RESULTS

Low Bidder: ROAD CONSTRUCTION NORTHWEST, INC.
Bid Amount: $646,162.00

2nd Bidder: ACTIVE CONSTRUCTION, INC.
Bid Amount: $709,709.00

3rd Bidder: TUCCI & SONS, INC.
Bid Amount: $762,562.75


Item No. 3: SR 167 COMPLETION DEMO #4 (SMALL WORKS ROSTER)                
Contract Number: 9477
Engineer's Estimate: $35,333.00
No. of Addenda: 1
Number of Bidders: 6/1

Award Status: ALL BIDS REJECTED - 9/9/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: R.W. SCOTT CONSTRUCTION CO. - $48,003.00

VERIFIED BID TOTAL RESULTS

Low Bidder: R.W. SCOTT CONSTRUCTION CO.
Bid Amount: $48,003.00


8/21/2019 Bid Opening - Olympia, WA

Item No. 1: NORTH OF PILGRIM RD E SLOPE STABILIZATION (SMALL WORKS ROSTER)
Contract Number: 9474
Engineer's Estimate: $171,104.00
No. of Addenda: 0
Number of Bidders: 6/3

Award Status: Awarded 8/30/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Hi Tech Rockfall Construction Inc - $189,899.00
Apparent 2nd: Midwest Rockfall, Inc. - $255,404.00
Apparent 3rd: Jensen Drilling Company - $477,700.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Hi Tech Rockfall Construction Inc - AWARDED 8/30/2019
Bid Amount: $189,899.00

2nd Bidder: Midwest Rockfall, Inc.
Bid Amount: $255,404.00

3rd Bidder: Jensen Drilling Company
Bid Amount: $477,700.00


Item No. 2: EDMONDS FERRY TERMINAL TIMBER PILE AND PAVEMENT REPAIRS (SMALL WORKS ROSTER)
Contract Number: 9470
Engineer's Estimate: $119,154.00
No. of Addenda: 1
Number of Bidders: 5/1

Award Status: ALL BIDS REJECTED - 8/23/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Conway Construction Company - $196,963.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Conway Construction Company
Bid Amount: $196,963.00


8/14/2019 Bid Opening - Olympia, WA

Item No. 1: BOW HILL SB WEIGH STATION PRESERVATION
Contract Number: 9473
Engineer's Estimate: $636,157.00
No. of Addenda: 0
Number of Bidders: 3/2

Award Status: Awarded 8/30/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Granite Construction Company - $587,478.00
Apparent 2nd: Conway Construction Company - $779,468.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Granite Construction Company - Awarded 8/30/2019
Bid Amount: $587,478.00

2nd Bidder: Conway Construction Company
Bid Amount: $779,468.00


Item No. 2: ANACORTES FERRY TERMINAL SHARED PEDESTRIAN IMPROVEMENT
Contract Number: 9471
Engineer's Estimate: $576,528.70
No. of Addenda: 1
Number of Bidders: 2/2

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Taylor's Excavators Inc - $787,922.00
Apparent 2nd: Granite Construction Company - $863,070.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Taylor's Excavators Inc
Bid Amount: $787,922.00

Bid Information:

2nd Bidder: Granite Construction Company
Bid Amount: $863,070.00

Bid Information:


Item No. 3: SB INTERSTATE BR TO NE 78TH ST VIC ACTIVE TRAFFIC MANAGEMENT
Contract Number: 9469
Engineer's Estimate: Base: $4,544,384.60, Base+A1: $4,592,384.60, Base+A1+A2: $4,701,784.60, Base+A1+A2+A3: $4,790,484.60, Base+A1+A2+A3+A4: $4,995,784.60
Funds Available: $4,995,785.00
No. of Addenda: 4
Number of Bidders: 3/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Northeast Electric, LLC - Base: $3,564,496.00, Base+A1: $3,594,012.00
Base+A1+A2: $3,691,472.00, Base+A1+A2+A3: $3,763,309.00, Base+A1+A2+A3+A4: $3,874,020.00
Apparent 2nd: Mill Plain Electric, Inc. - Base: $4,486,863.00, Base+A1: $4,512,931.00
Base+A1+A2: $4,608,929.00, Base+A1+A2+A3: $4,687,455.00, Base+A1+A2+A3+A4: $4,794,902.00
Apparent 3rd: Elcon Corporation - Base: $5,874,744.00, Base+A1: $5,911,434.00
Base+A1+A2: $6,031,894.00, Base+A1+A2+A3: $6,138,204.00, Base+A1+A2+A3+A4: $6,324,534.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Northeast Electric, LLC - Rejected 8/21/2019
Bid Amount: Base: $3,564,496.00, Base+A1: $3,594,012.00, Base+A1+A2: $3,691,472.00,
Base+A1+A2+A3: $3,763,309.00, Base+A1+A2+A3+A4: $3,874,020.00

Bid Information:

2nd Bidder: Mill Plain Electric, Inc.
Bid Amount: Base: $4,486,863.00, Base+A1: $4,512,931.00, Base+A1+A2: $4,608,929.00,
Base+A1+A2+A3: $4,687,455.00, Base+A1+A2+A3+A4: $4,794,902.00

Bid Information:

3rd Bidder: Elcon Corporation - Rejected 8/16/2019
Bid Amount: Base: $5,874,744.00, Base+A1: $5,911,434.00, Base+A1+A2: $6,031,894.00,
Base+A1+A2+A3: $6,138,204.00, Base+A1+A2+A3+A4: $6,324,534.00

Bid Information:


8/7/2019 Bid Opening - Olympia, WA

Item No. 2: NSC BNSF - 2ND RAILROAD REALIGNMENT
Contract Number: 9462
Engineer's Estimate: $29,219,201.71
No. of Addenda: 9
Number of Bidders: 13/8

Award Status: AWARDED 8/12/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Halme Construction Inc. - $26,443,012.00
Apparent 2nd: Scarsella Bros. Inc. - $26,680,719.89
Apparent 3rd: Apollo, Inc. - $27,955,203.26

VERIFIED BID TOTAL RESULTS

Low Bidder: Halme Construction Inc. - AWARDED 8/12/2019
Bid Amount: $26,443,012.00 $26,443,011.99

Bid Information:

2nd Bidder: Scarsella Bros. Inc.
Bid Amount: $26,680,719.89

Bid Information:

3rd Bidder: Apollo, Inc.
Bid Amount: $27,955,203.26

Bid Information:


7/24/2019 Bid Opening - Olympia, WA

Item No. 1: 2019-21 ER REGIONWIDE BASIC SAFETY SIGNING (SMALL WORKS ROSTER)
Contract Number: 9468
Engineer's Estimate: $236,004.00
No. of Addenda: 0
Number of Bidders: 6/3

Award Status: ALL BIDS REJECTED 8/6/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: ROAD PRODUCTS, INC. - $319,004.00
Apparent 2nd: KT CONTRACTING CO., INC. - $340,366.42
Apparent 3rd: CONSTRUCTION AHEAD, INC. DBA PAVEMENT SURFACE CONTROL - $376,004.00

VERIFIED BID TOTAL RESULTS

Low Bidder: ROAD PRODUCTS, INC.
Bid Amount: $319,004.00

Bid Information:

2nd Bidder: KT CONTRACTING CO., INC.
Bid Amount: $340,366.42

Bid Information:

3rd Bidder: CONSTRUCTION AHEAD, INC. DBA PAVEMENT SURFACE CONTROL
Bid Amount: $376,004.00

Bid Information:

 

Item No. 2: PCC RAILROAD STRUCTURE REHABILITATION AND REPLACEMENT
Contract Number: 9466
Engineer's Estimate: $1,238,982.00
No. of Addenda: 1
Number of Bidders: 10/3

Award Status:Awarded 8/15/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: HALME CONSTRUCTION INC. - $1,713,482.08
Apparent 2nd: RAILWORKS TRACK SYSTEMS, INC. - $1,749,156.85 $1,750,156.85
Apparent 3rd: IMCO GENERAL CONSTRUCTION, INC. - $1,882,256.00

VERIFIED BID TOTAL RESULTS

Low Bidder: HALME CONSTRUCTION INC.
Bid Amount: $1,713,482.08

Bid Information:

2nd Bidder: RAILWORKS TRACK SYSTEMS, INC.
Bid Amount: $1,749,156.85 $1,750,156.85

Bid Information:

3rd Bidder: IMCO GENERAL CONSTRUCTION, INC.
Bid Amount: $1,882,256.00

Bid Information:


7/17/2019 Bid Opening - Olympia, WA

Item No. 1: 0.8 MILES W OF SNOQUALMIE SUMMIT EB - CULVERT REPAIR (SMALL WORKS ROSTER)
Contract Number: 9463
Engineer's Estimate: $226,903.00
No. of Addenda: 2
Number of Bidders: 6/5

Award Status: AWARDED 7/25/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: RODARTE CONSTRUCTION, INC. - $199,897.00
Apparent 2nd: TITAN EARTHWORK, LLC - $235,899.00
Apparent 3rd: CONWAY CONSTRUCTION COMPANY - $256,713.00

VERIFIED BID TOTAL RESULTS

Low Bidder: RODARTE CONSTRUCTION, INC. - AWARDED 7/25/2019
Bid Amount: $199,897.00

Bid Information:

2nd Bidder: TITAN EARTHWORK, LLC
Bid Amount: $235,899.00

Bid Information:

3rd Bidder: CONWAY CONSTRUCTION COMPANY
Bid Amount: $256,713.00

Bid Information:


7/10/2019 Bid Opening - Olympia, WA

Item No. 1: WHITE PASS DOMESTIC WATERLINE REPLACEMENT – SCR - RE-BID 
Contract Number: 9461
Engineer's Estimate: $430,000.00
No. of Addenda: 1
Number of Bidders: 4/3

Award Status: Awarded 7/15/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: NOVA CONTRACTING, INC. - $479,000.00
Apparent 2nd: CONWAY CONSTRUCTION COMPANY - $495,968.00 - Rejected 7/11/2019
Apparent 3rd: SELLAND CONSTRUCTION, INC. - $715,000.00

VERIFIED BID TOTAL RESULTS

Low Bidder: NOVA CONTRACTING, INC. - Awarded 7/15/2019
Bid Amount: $479,000.00

2nd Bidder: CONWAY CONSTRUCTION COMPANY - Rejected 7/11/2019
Bid Amount: $495,968.00

3rd Bidder: SELLAND CONSTRUCTION, INC.
Bid Amount: $715,000.00


Item No. 2: RIDGEFIELD WEIGH STATION PRESERVATION 
Contract Number: 9464
Engineer's Estimate: $710,087.90
No. of Addenda: 1
Number of Bidders: 2/2

Award Status: Awarded 7/19/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: CONWAY CONSTRUCTION COMPANY - $703,489.20 - Rejected 7/11/2019
Apparent 2nd: GRANITE CONSTRUCTION COMPANY - $939,939.00

VERIFIED BID TOTAL RESULTS

Low Bidder: CONWAY CONSTRUCTION COMPANY - Rejected 7/11/2019
Bid Amount: $703,489.20

Bid Information:

Second Bidder: GRANITE CONSTRUCTION COMPANY - Awarded 7/19/2019
Bid Amount: $939,939.00

Bid Information:


6/26/2019 Bid Opening - Olympia, WA

Item No. 1: I-5 OVER PACIFIC AVE SEISMIC RETROFIT
Contract Number: 9458
Engineer's Estimate: $770,400.32
No. of Addenda: 1
Number of Bidders: 9/5

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: MASSANA CONSTRUCTION, INC. - $616,235.20
Apparent 2nd: COMBINED CONSTRUCTION, INC. - $715,266.00
Apparent 3rd: QUIGG BROS., INC. - $733,942.00

VERIFIED BID TOTAL RESULTS

Low Bidder: MASSANA CONSTRUCTION, INC.
Bid Amount: $616,235.20

Bid Information:

2nd Bidder: COMBINED CONSTRUCTION, INC.
Bid Amount: $715,266.00

Bid Information:

3rd Bidder: QUIGG BROS., INC.
Bid Amount: $733,942.00

Bid Information:


6/19/2019 Bid Opening - Olympia, WA

Item No. 1: TUMWATER MATERIALS LAB BLDG ROOF REPLACEMENT - HQ
Contract Number: 9456
Engineer's Estimate: $1,434,650.00
No. of Addenda: 1
Number of Bidders: 4/4

Award Status: Awarded 6/24/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Construct, Inc. - $1,348,000.00
Apparent 2nd: Cobra BEC, Inc. Flynn BEC LP - $1,378,000.00 Good News Group, Inc. - $1,478,560.00**
Apparent 3rd: Good News Group, Inc. - $1,478,560.00 Scholten Roofing, Inc - $1,866,758.00**

VERIFIED BID TOTAL RESULTS

Low Bidder: Construct, Inc.
Bid Amount: $1,348,000.00

Bid Information:

2nd Bidder: Good News Group, Inc.
Bid Amount: $1,478,560.00

Bid Information:

3rd Bidder: Scholten Roofing, Inc
Bid Amount: $1,866,758.00

Bid Information:


Item No. 2: RAMP METER ENHANCEMENT AND ITS
Contract Number: 9459
Engineer's Estimate: $930,634.50
No. of Addenda: 1
Number of Bidders: 4/1

Award Status: AWARDED - 6/28/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Elcon Corporation - $1,198,329.90

VERIFIED BID TOTAL RESULTS

Low Bidder: Elcon Corporation - AWARDED
Bid Amount: $1,198,329.90


6/12/2019 Bid Opening - Olympia, WA

Item No. 1: 5TH ST TO S H ST – PAVING AND ADA COMPLIANCE
Contract Number: 9455
Engineer's Estimate: $4,733,297.50
No. of Addenda: 1
Number of Bidders: 2/1

Award Status: ALL BIDS REJECTED

PRELIMINARY BID TOTAL RESULTS
Apparent Low: GRANITE CONSTRUCTION COMPANY - $8,886,640.75

VERIFIED BID TOTAL RESULTS

Low Bidder: GRANITE CONSTRUCTION COMPANY
Bid Amount: $8,886,640.75

Bid Information:


Item No. 2: KILISUT HARBOR - REMOVE FISH BARRIER
Contract Number: 9447
Engineer's Estimate: $8,669,852.00
No. of Addenda: 6
Number of Bidders: 17/8

Award Status: Awarded 6/19/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: CASCADE BRIDGE, LLC - $9,087,681.00
Apparent 2nd: PACIFIC PILE & MARINE, L.P. - $9,934,000.00
Apparent 3rd: CECCANTI, INC. - $10,257,757.00

VERIFIED BID TOTAL RESULTS

Low Bidder: CASCADE BRIDGE, LLC
Bid Amount: $9,087,681.00

Bid Information:

Second Bidder: PACIFIC PILE & MARINE, L.P.
Bid Amount: $9,934,000.00

Bid Information:

Third Bidder: CECCANTI, INC.
Bid Amount: $10,257,757.00

Bid Information:

6/5/2019 Bid Opening - Olympia, WA

Item No. 1: WHITE PASS DOMESTIC WATERLINE REPLACEMENT - SCR
Contract Number: 9449
Engineer's Estimate: $430,000.00
No. of Addenda: 1
Number of Bidders: 4/3

Award Status: ALL BIDS REJECTED - 6/11/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Nova Contracting, Inc. - $424,000.00
Apparent 2nd: Conway Construction Company - $496,900.00
Apparent 3rd: Northwest Cascade, Inc. - $965,012.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Nova Contracting, Inc.
Bid Amount: $424,000.00

Second Bidder: Conway Construction Company
Bid Amount: $496,900.00

Third Bidder: Northwest Cascade, Inc.
Bid Amount: $965,012.00


Item No. 2: SCR REGION WIDE REDIRECTIONAL LANDFORMS AND MEDIAN CABLE BARRIER
Contract Number: 9448
Engineer's Estimate: $1,457,872.80
No. of Addenda: 2
Number of Bidders: 5/4

Award Status: Awarded 6/13/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Frank Gurney, Inc. - $1,457,843.00
Apparent 2nd: Massana Construction, Inc. - $1,489,414.00
Apparent 3rd: Petersen Brothers, Inc. - $1,562,568.11

VERIFIED BID TOTAL RESULTS

Low Bidder: Frank Gurney, Inc.
Bid Amount: $1,457,843.00

Bid Information:

Second Bidder: Massana Construction, Inc.
Bid Amount: $1,489,414.00

Bid Information:

Third Bidder: Petersen Brothers, Inc.
Bid Amount: $1,562,568.11

Bid Information:


Item No. 3: SAFETY CORRIDOR IMPROVEMENTS & E ELM RD TO SR 17 SB - PAVING
Contract Number: 9451
Engineer's Estimate: $11,888,331.88
Maximum Funds Available: $13,500,000.00
No. of Addenda: 1
Number of Bidders: 3/3

Award Status: Awarded 6/13/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Central Washington Asphalt, Inc. - $12,195,888.85
Apparent 2nd: Interstate Concrete & Asphalt Company DBA Columbia Asphalt and Ready Mix - $12,334,881.10
Apparent 3rd: Granite Construction Company - $13,200,000.00 - Rejected 6/6/2019

VERIFIED BID TOTAL RESULTS

Low Bidder: Central Washington Asphalt, Inc.
Bid Amount: $12,195,888.85

Bid Information:

Second Bidder: Interstate Concrete & Asphalt Company DBA Columbia Asphalt and Ready Mix
Bid Amount: $12,334,881.10

Bid Information:

Third Bidder: Granite Construction Company - Rejected 6/6/2019
Bid Amount: $13,200,000.00

Bid Information:


Item No. 4: E OF ELGIN CLIFTON RD TO SR 16-REMOVE FISH BARRIERS, PAVING ADA & BRIDGE
Contract Number: 9446
Engineer's Estimate: $8,936,411.37
No. of Addenda: 2
Number of Bidders: 18/2

Award Status: Awarded 6/19/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Granite Construction Company - $10,055,978.60
Apparent 2nd: Ceccanti, Inc. - $10,579,055.44

VERIFIED BID TOTAL RESULTS

Low Bidder: Granite Construction Company
Bid Amount: $10,055,978.60

Bid Information:

Second Bidder: Ceccanti, Inc.
Bid Amount: $10,579,055.44

Bid Information:


Item No. 5: NCR INTERSECTION IMPROVEMENTS 2019
Contract Number: 9454
Engineer's Estimate: $857,493.00
No. of Addenda: 1
Number of Bidders: 3/3

Award Status: Awarded 6/10/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Neppel Electrical Controls, LLC - $865,014.00
Apparent 2nd: Power City Electric, Inc. - $883,135.00**
Apparent 3rd: Northeast Electric, LLC - $1,996,583.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Neppel Electrical Controls, LLC
Bid Amount: $865,014.00

Bid Information:

Second Bidder: Power City Electric, Inc.
Bid Amount: $877,614.50

Bid Information:

Third Bidder: Northeast Electric, LLC
Bid Amount: $1,996,583.00

Bid Information:


Item No. 6: N OF N 54TH ST TO POINT DEFIANCE LANDING - PAVING
Contract Number: 9457
Engineer's Estimate: $583,697.00
No. of Addenda: 1
Number of Bidders: 5/1

Award Status: Awarded 6/19/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Tucci & Sons, Inc. - $1,036,446.90 **

VERIFIED BID TOTAL RESULTS

Low Bidder: Tucci & Sons, Inc.
Bid Amount: $1,036,446.90 $1,036,466.90

Bid Information:

5/30/2019 Bid Opening - Olympia, WA

Item No. 1: SYSTEM WIDE ON-CALL OFF-SHORE MAINTENANCE
Contract Number: 9443
Engineer's Estimate: $1,436,243.00
No. of Addenda: 0
Number of Bidders: 4/3

Award Status: Awarded 6/3/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: PACIFIC PILE & MARINE, L.P. - $1,351,743.00
Apparent 2nd: AMERICAN CONSTRUCTION CO., INC. - $1,499,503.00
Apparent 3rd: MANSON CONSTRUCTION CO. - $1,581,553.00

VERIFIED BID TOTAL RESULTS

Low Bidder: PACIFIC PILE & MARINE, L.P.
Bid Amount: $1,351,743.00

Bid Information:

Second Bidder: AMERICAN CONSTRUCTION CO., INC
Bid Amount: $1,499,503.00

Bid Information:

Third Bidder: MANSON CONSTRUCTION CO.
Bid Amount: $1,581,553.00

Bid Information:

Item No. 2: BURNT BRIDGE CREEK TO 4TH PLAIN RD PAVING AND EXPANSION JOINTS
Contract Number: 9453
Engineer's Estimate: $5,393,441.01
No. of Addenda: 2
Number of Bidders: 3/1

Award Status: Awarded 6/7/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: GRANITE CONSTRUCTION COMPANY - $5,347,347.00

VERIFIED BID TOTAL RESULTS

Low Bidder: GRANITE CONSTRUCTION COMPANY
Bid Amount: $5,347,347.00

Bid Information:

5/22/2019 Bid Opening - Olympia, WA

 

Item No. 1: N OF ALDER - ROCK SCALING
Contract Number: 9442
Engineer's Estimate: $581,202.00
No. of Addenda: 0
Number of Bidders: 5/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: TRIPTYCH CONSTRUCTION, LLC - $519,594.86 **
Apparent 2nd Low: BOETTCHER & SONS, INC. - $716,652.00
Apparent 3rd 2nd: HI TECH ROCKFALL CONSTRUCTION INC - $799,302.00

VERIFIED BID TOTAL RESULTS

Low Bidder: TRIPTYCH CONSTRUCTION, LLC
Bid Amount: $519,594.86

Bid Information:

Second Bidder Low Bidder: BOETTCHER & SONS, INC.
Bid Amount: $716,652.00

Bid Information:

Third Bidder Second Bidder: HI TECH ROCKFALL CONSTRUCTION, INC
Bid Amount: $799,302.00

Bid Information:

Item No. 2: NW REGION BREAKAWAY CABLE TERMINAL REPLACEMENT
Contract Number: 9441
Engineer's Estimate: $1,096,222.50
No. of Addenda: 0
Number of Bidders: 3/1

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: PETERSEN BROTHERS, INC. - $1,109,941.73

VERIFIED BID TOTAL RESULTS

Low Bidder: PETERSEN BROTHERS, INC.
Bid Amount: $1,109,941.73

Bid Information:

 

Item No. 3: WIND RIVER RD INTERSECTION IMPROVEMENTS
Contract Number: 9445
Engineer's Estimate: $3,497,847.00
Maximum Funds Available: $3,501,900.00
No. of Addenda: 1
Number of Bidders: 7/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: CRESTLINE CONSTRUCTION COMPANY, L.L.C. - $3,399,638.50
Apparent 2nd: MCDONALD EXCAVATING, INC. - $3,671,445.00
Apparent 3rd: NUTTER CORPORATION DBA NUTTER UNDERGROUND UTILITIES - $3,935,582.22

VERIFIED BID TOTAL RESULTS

Low Bidder: CRESTLINE CONSTRUCTION COMPANY,
Bid Amount: $3,399,638.50

Bid Information:

Second Bidder: MCDONALD EXCAVATING, INC.
Bid Amount: $3,671,445.00

Bid Information:

Third Bidder: NUTTER CORPORATION DBA NUTTER
Bid Amount: $3,935,582.22

Bid Information:

Item No. 4: SR 167 COMPLETION DEMO #3 (SMALL WORKS ROSTER)
Contract Number: 9450
Engineer's Estimate: $216,319.00
No. of Addenda: 1
Number of Bidders: 3/2

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: SKYCORP, LTD - $87,464.00
Apparent 2nd: ASCENDENT LLC - $191,455.30

VERIFIED BID TOTAL RESULTS

Low Bidder: SKYCORP, LTD
Bid Amount: $87,464.00

Second Bidder: ASCENDENT LLC
Bid Amount: $191,455.30

 

Item No. 5: EASTGATE TO SR 900 CORRIDOR IMPROVEMENTS
Contract Number: 9429
Engineer's Estimate: $50,573,965.40
Maximum Funds Available: $54,000,000.00
No. of Addenda: 5
Number of Bidders: 8/4

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: GUY F. ATKINSON CONSTRUCTION, LLC. - $46,898,047.00
Apparent 2nd: IMCO GENERAL CONSTRUCTION, INC. - $48,971,683.15
Apparent 3rd: GRANITE CONSTRUCTION COMPANY - $53,790,359.40

VERIFIED BID TOTAL RESULTS

Low Bidder: GUY F. ATKINSON CONSTRUCTION, LLC.
Bid Amount: $46,898,047.00

Bid Information:

Second Bidder: IMCO GENERAL CONSTRUCTION, INC.
Bid Amount: $48,971,683.15

Bid Information:

Third Bidder: GRANITE CONSTRUCTION COMPANY
Bid Amount: $53,790,359.40

Bid Information:

 

5/15/2019 Bid Opening - Olympia, WA

Item No. 1: SPOKANE STREET SMF BLDG 1 ROOF REPLACEMENT - NWR
Contract Number: 9437
Engineer's Estimate: $479,468.00
No. of Addenda: 3
Number of Bidders: 2/2

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: GOOD NEWS GROUP, INC. - $490,865.00
Apparent 2nd: J.R. ABBOTT CONSTRUCTION, INC. - $606,191.00

VERIFIED BID TOTAL RESULTS

Low Bidder: GOOD NEWS GROUP, INC.
Bid Amount: $490,865.00

Second Bidder: J.R. ABBOTT CONSTRUCTION, INC.
Bid Amount: $606,191.00


Item No. 2: SPIKETON CREEK BRIDGE TEMPORARY BRIDGE
Contract Number: 9438
Engineer's Estimate: $2,349,346.00
No. of Addenda: 1
Number of Bidders: 7/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: HAMILTON CONSTRUCTION CO. - $2,140.559.35
Apparent 2nd: JOHANSEN CONSTRUCTION COMPANY, INC. - $2,284,525.50
Apparent 3rd: CECCANTI, INC. - $2,989,568.00

VERIFIED BID TOTAL RESULTS

Low Bidder: HAMILTON CONSTRUCTION CO.
Bid Amount: $2,140.559.35

Bid Information:

Second Bidder: JOHANSEN CONSTRUCTION COMPANY, INC.
Bid Amount: $2,284,525.50

Third Bidder: CECCANTI, INC.
Bid Amount: $2,989,568.00

 


5/8/2019 Bid Opening - Olympia, WA

Item No. 1: SB TOUTLE RIVER BRIDGE - EXPANSION JOINT, DECK REPAIR AND OVERLAY
Contract Number: 9433
Engineer's Estimate: $1,732,588.14
No. of Addenda: 0
Number of Bidders: 10/4

Award Status: Awarded 5/13/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: M.J. HUGHES CONSTRUCTION, INC. - $1,679,068.65
Apparent 2nd: CASCADE BRIDGE LLC - $1,833,095.25
Apparent 3rd: GRANITE CONSTRUCTION COMPANY - $2,389,389.00

VERIFIED BID TOTAL RESULTS

Low Bidder: M.J. HUGHES CONSTRUCTION, INC.
Bid Amount: $1,679,068.65

Bid Information:

Second Bidder: CASCADE BRIDGE LLC
Bid Amount: $1,833,095.25

Bid Information:

Third Bidder: GRANITE CONSTRUCTION COMPANY
Bid Amount: $2,389,389.00

Bid Information:

 

Item No. 2: S 200TH STREET ON-RAMP TO SB I-5 METERED SHOULDER
Contract Number: 9439
Engineer's Estimate: $897,305.00
No. of Addenda: 1
Number of Bidders: 5/2

Award Status: Awarded 5/14/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: TITAN EARTHWORK LLC - $866,688.00
Apparent 2nd: ROAD CONSTRUCTION NORTHWEST, INC. - $1,017,517.50

VERIFIED BID TOTAL RESULTS

Low Bidder: TITAN EARTHWORK LLC
Bid Amount: $866,688.00

Second Bidder: ROAD CONSTRUCTION NORTHWEST, INC.
Bid Amount: $1,017,517.50


Item No. 3: SAUK-SUIATTLE CONFLUENCE CED RETROFIT
Contract Number: 9436
Engineer's Estimate: $1,804,200.50
No. of Addenda: 2
Number of Bidders: 6/3

Award Status: Awarded 5/13/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: TRIMAXX CONSTRUCTION, INC. - $1,811,798.25
Apparent 2nd: ROAD CONSTRUCTION NORTHWEST, INC. - $1,879,349.50
Apparent 3rd 2nd: A-1 LANDSCAPING AND CONSTRUCTION, INC. - $3,251,924.00

VERIFIED BID TOTAL RESULTS

Low Bidder: TRIMAXX CONSTRUCTION, INC
Bid Amount: $1,811,798.25

Bid Information:

Second Bidder: ROAD CONSTRUCTION NORTHWEST, INC.
Bid Amount: $1,879,349.50

Bid Information:

Third Second Bidder: A-1 LANDSCAPING AND CONSTRUCTION, INC.
Bid Amount: $3,251,924.00

Bid Information:

Item No. 4: STEAMBOAT SLOUGH MITIGATION SITE
Contract Number: 9435
Engineer's Estimate: $3,475,083.00
No. of Addenda: 2
Number of Bidders: 8/2

Award Status: Awarded 5/13/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: TRIMAXX CONSTRUCTION, INC. - $6,338,297.00
Apparent 2nd: A-1 LANDSCAPING AND CONSTRUCTION, INC. - $7,493,565.00

VERIFIED BID TOTAL RESULTS

Low Bidder: TRIMAXX CONSTRUCTION, INC.
Bid Amount: $6,338,297.00

Bid Information:

Second Bidder: A-1 LANDSCAPING AND CONSTRUCTION, INC.
Bid Amount: $7,493,565.00

Bid Information:

 

Item No. 5: MEDICAL LAKE I/C RECONSTRUCTION
Contract Number: 9425
Engineer's Estimate: $10,840,925.09
No. of Addenda: 5
Number of Bidders: 10/8

Award Status: Awarded 5/13/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: N.A. DEGERSTROM, INC. - $9,688,216.30
Apparent 2nd: HALME EXCAVATING, INC. - $10,540,872.17**
Apparent 3rd: MAX J. KUNEY COMPANY - $10,776,874.65

VERIFIED BID TOTAL RESULTS

Low Bidder: N.A. DEGERSTROM, INC.
Bid Amount: $9,688,216.30

Bid Information:

Second Bidder: HALME CONSTRUCTION, INC.
Bid Amount: $10,540,872.18

Bid Information:

Third Bidder: MAX J. KUNEY COMPANY
Bid Amount: $10,776,874.65

Bid Information:


5/1/2019 Bid Opening - Olympia, WA

Item No. 1: N OF SR 107 - STABILIZE SLOPE
Contract Number: 9430
Engineer's Estimate: $5,936,429.50
No. of Addenda: 0
Number of Bidders: 5/4

Award Status: Awarded 5/10/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: ROGNLIN'S, INC. - $6,650,000.00
Apparent 2nd: SCARSELLA BROS. INC. - $6,953,615.75
Apparent 3rd: GRANITE CONSTRUCTION COMPANY - $8,204,771.00

VERIFIED BID TOTAL RESULTS

Low Bidder: ROGNLIN'S, INC.
Bid Amount: $6,650,000.00

Bid Information:


Item No. 2: TAHLEQUAH FERRY TERMINAL PAINTING PRESERVATION
Contract Number: 9431
Engineer's Estimate: $466,154.00
No. of Addenda: 0
Number of Bidders: 4/1

Award Status: All Bids Rejected 5/9/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: LIBERTY MAINTENANCE, INC. - $1,115,504.00

VERIFIED BID TOTAL RESULTS

Low Bidder: LIBERTY MAINTENANCE, INC.
Bid Amount: $1,115,504.00


Item No. 3: SPOKANE AREA TRAFFIC VOLUME COLLECTION - REBID (Small Works Roster)
Contract Number: 9434
Engineer's Estimate: $211,454.00
No. of Addenda: 0
Number of Bidders: 2/2

Award Status: Awarded 5/10/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: POWER CITY ELECTRIC, INC. - $221,754.00
Apparent 2nd: COLVICO, INC. - $243,686.86

VERIFIED BID TOTAL RESULTS

Low Bidder: POWER CITY ELECTRIC, INC.
Bid Amount: $221,754.00

Second Bidder: COLVICO, INC.
Bid Amount: $243,686.86


Item No. 4: PAVEMENT REHABILITATION
Contract Number: 9432
Engineer's Estimate: $2,803,263.70
No. of Addenda: 0
Number of Bidders: 5/2

Award Status: Awarded 5/6/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: GRANITE CONSTRUCTION COMPANY - $3,307,307.00
Apparent 2nd: WILDISH STANDARD PAVING CO. - $4,422,778.50

VERIFIED BID TOTAL RESULTS

Low Bidder: GRANITE CONSTRUCTION COMPANY
Bid Amount: $3,307,307.00


Item No. 5: MUKILTEO FERRY TERMINAL (PHASE 2) - MARINE STRUCTURES
Contract Number: 9338
Engineer's Estimate: Base: $27,660,430.00, Base + A1: $30,746,340.00, Base + A1 + A2: $31,745,360.00 
Funds Available: $31,083,378.00
No. of Addenda: 6
Number of Bidders: 7/5

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: MANSON CONSTRUCTION CO. - Base: $22,668,903.00,
Base + A1: $25,350,848.00, Base + A1 + A2: $26,418,348.00 
Apparent 2nd: PACIFIC PILE & MARINE, L.P. - Base: $24,534,550.00,
Base + A1: $27,446,700.00, Base + A1 + A2: $28,249,000.00 
Apparent 3rd: IMCO GENERAL CONSTRUCTION, INC. - Base: $25,110,032.00,
Base + A1: $27,780,082.00, Base + A1 + A2: $28,375,582.00

VERIFIED BID TOTAL RESULTS

Low Bidder: MANSON CONSTRUCTION CO.
Bid Amount: - Base: $22,668,903.00, Base + A1: $25,350,848.00, Base + A1 + A2: $26,418,348.00 

4/24/2019 Bid Opening - Olympia, WA

Item No. 1: SPRAGUE AVE I/C TO ARGONNE RD I/C PCCP REHABILITATION GRINDING
Contract Number: 9428
Engineer's Estimate: $8,759,625.50
No. of Addenda: 3
Number of Bidders: 4/1

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: ACME CONCRETE PAVING, INC. - $16,841,153.95

VERIFIED BID TOTAL RESULTS

Low Bidder: ACME CONCRETE PAVING, INC.
Bid Amount: $16,841,153.95

Bid Information:


Item No. 2: W FORK SAN POIL BRIDGE REPLACE STRUCTURE
Contract Number: 9426
Engineer's Estimate: $4,025,720.84
No. of Addenda: 2
Number of Bidders: 8/4

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: N.A. DEGERSTROM, INC. - $5,673,976.14
Apparent 2nd: MAX J. KUNEY COMPANY - $6,385,007.14
Apparent 3rd: IMCO GENERAL CONSTRUCTION, INC. - $6,459,504.54

VERIFIED BID TOTAL RESULTS

Low Bidder: N.A. DEGERSTROM, INC.
Bid Amount: $5,673,976.14

Bid Information:

Second Bidder: MAX J. KUNEY COMPANY
Bid Amount: $6,385,007.14

Bid Information:

Third Bidder: IMCO GENERAL CONSTRUCTION, INC.
Bid Amount: $6,459,504.54

Bid Information:


4/17/2019 Bid Opening - Olympia, WA

Item No. 1: NCR INTERSECTION IMPROVEMENTS 2019
Contract Number: 9422
Engineer's Estimate: $802,753.00
No. of Addenda: 0
Number of Bidders: 3/3

Award Status: ALL BIDS REJECTED**

PRELIMINARY BID TOTAL RESULTS
Apparent Low: NEPPEL ELECTRICAL & CONTROLS, L L C - $934,857.000**
Apparent 2nd: NORTHEAST ELECTRIC, LLC - $989,898.00**
Apparent 3rd: TRANSPORTATION SYSTEMS, INC. - $1,262,952.00**


Item No. 2: PED. ACTIVATED WARNING SYSTEM AND IMPROVEMENTS (SMALL WORKS ROSTER)
Contract Number: 9427
Engineer's Estimate: $117,897.00
No. of Addenda: 0
Number of Bidders: 4/3

Award Status: AWARDED

PRELIMINARY BID TOTAL RESULTS
Apparent Low: MORENO & NELSON CONSTRUCTION CORP. - $188,922.00**
Apparent 2nd Low: NEPPEL ELECTRICAL & CONTROLS, L L C - $237,262.50**
Apparent 3rd 2nd: NORTHEAST ELECTRIC, LLC - $265,483.00**

VERIFIED BID TOTAL RESULTS

Low Bidder: NEPPEL ELECTRICAL & CONTROLS, L L C
Bid Amount: $237,262.50

2nd Bidder: NORTHEAST ELECTRIC, LLC
Bid Amount: $265,483.00


Item No. 3: DIVISION WYE TO FARWELL RD PAVING
Contract Number: 9400
Engineer's Estimate: $3,032,947.20
No. of Addenda: 6
Number of Bidders: 3/2

Award Status: AWARDED

PRELIMINARY BID TOTAL RESULTS
Apparent Low: CPM DEVELOPMENT CORPORATION DBA INLAND ASPHALT COMPANY - $2,815,815.00
Apparent 2nd: SHAMROCK PAVING, INC. - $3,399,999.99

VERIFIED BID TOTAL RESULTS

Low Bidder: CPM DEVELOPMENT CORPORATION DBA INLAND ASPHALT COMPANY
Bid Amount: $2,815,815.00

Bid Information:

2nd Bidder: SHAMROCK PAVING, INC.
Bid Amount: $3,399,999.99

Bid Information:


Item No. 4: BUFORD CREEK BARRIER FISH PASSAGE
Contract Number: 9418
Engineer's Estimate: $2,579,181.00
No. of Addenda: 2
Number of Bidders: 6/3

Award Status: Awarded May 24, 2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: ASCORP, INC. DBA DEBCO - $3,268,371.00
Apparent 2nd: IMCO GENERAL CONSTRUCTION, INC. - $3,664,000.00
Apparent 3rd: N.A. DEGERSTROM, INC. - $4,556,488.50

VERIFIED BID TOTAL RESULTS

Low Bidder: ASCORP, INC. DBA DEBCO
Bid Amount: $3,268,371.00

Bid Information:

2nd Bidder: IMCO GENERAL CONSTRUCTION, INC.
Bid Amount: $3,664,000.00

Bid Information:

3rd Bidder: N.A. DEGERSTROM, INC.
Bid Amount: $4,556,488.50

Bid Information:


4/10/2019 Bid Opening - Olympia, WA

Item No. 1: GEE CREEK SB SRA - REHABILITATE RV DUMP STATION
Contract Number: 9415
Engineer's Estimate: $2,085,000.00
No. of Addenda: 1
Number of Bidders: 8/5

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: TAPANI, INC. - $1,509,065.00
Apparent 2nd:MCDONALD EXCAVATING, INC. - $1,840,000.00
Apparent 3rd: ADVANCED EXCAVATING SPECIALISTS, LLC - $1,888,500.00

VERIFIED BID TOTAL RESULTS

Low Bidder: TAPANI, INC.
Bid Amount: $1,509,065.00

Bid Information:

2nd Bidder: MCDONALD EXCAVATING, INC.
Bid Amount: $1,840,000.00

Bid Information:

3rd Bidder: ADVANCED EXCAVATING SPECIALISTS, LLC
Bid Amount: $1,888,500.00

Bid Information:


Item No. 2: WEST JEFFERSON COUNTY REMOVE FISH BARRIERS
Contract Number: 9398
Engineer's Estimate: $13,311,084.93
No. of Addenda: 6
Number of Bidders: 16/7

Award Status: AWARDED

PRELIMINARY BID TOTAL RESULTS
Apparent Low: QUIGG BROS., INC. - $15,542,998.00
Apparent 2nd: CASCADE BRIDGE LLC - $15,894,172.50
Apparent 3rd: SCARSELLA BROS., INC. - $16,219,950.80

VERIFIED BID TOTAL RESULTS

Low Bidder: QUIGG BROS., INC.
Bid Amount: $15,542,998.00

Bid Information:

2nd Bidder: CASCADE BRIDGE LLC
Bid Amount: $15,894,172.50

Bid Information:

3rd Bidder: SCARSELLA BROS., INC.
Bid Amount: $16,219,950.80

Bid Information:


Item No. 3: LACAMAS CREEK BRIDGE REPLACEMENT
Contract Number: 9419
Engineer's Estimate: $3,385,677.50
No. of Addenda: 2
Number of Bidders: 13/8

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: FARLINE BRIDGE, INCORPORATED - $3,238,905.33
Apparent 2nd: CASCADE BRIDGE LLC - $3,629,338.75
Apparent 3rd: CARTER & COMPANY, INC. DBA CARTER & COMPANY OF WASHINGTON - $3,735,997.00

VERIFIED BID TOTAL RESULTS

Low Bidder: FARLINE BRIDGE, INCORPORATED
Bid Amount: $3,238,905.33

Bid Information:

2nd Bidder: CASCADE BRIDGE LLC
Bid Amount: $3,629,338.75

Bid Information:

3rd Bidder: CARTER & COMPANY, INC. DBA CARTER & COMPANY OF WASHINGTON
Bid Amount: $3,735,997.00

Bid Information:


4/3/2019 Bid Opening - Olympia, WA

Item No. 1: DUWAMISH RIVER BRIDGES SPECIAL BRIDGE REPAIR
Contract Number: 9413
Engineer's Estimate: $1,179,627.00
No. of Addenda: 1
Number of Bidders: 5/1

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Kraemer North America, LLC - $1,848,838.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Kraemer North America, LLC
Bid Amount: $1,848,838.00

Bid Information:


Item No. 2: US 12 TO W OF WILSON RD PAVING
Contract Number: 9411
Engineer's Estimate: $4,286,282.00
No. of Addenda: 1
Number of Bidders: 3/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Granite Construction Company - $3,520,316.20
Apparent 2nd: Lakeside Industries, Inc. - $3,777,628.80
Apparent 3rd: Tucci & Sons, Inc. - $4,375,176.85

VERIFIED BID TOTAL RESULTS

Low Bidder: Granite Construction Company
Bid Amount: $3,520,316.20

Bid Information:

2nd Bidder: Lakeside Industries, Inc.
Bid Amount: $3,777,628.80

Bid Information:

3rd Bidder: Tucci & Sons, Inc.
Bid Amount: $4,375,176.85

Bid Information:


Item No. 3: ACCESS IMPROVEMENTS
Contract Number: 9416
Engineer's Estimate: Base: $4,424,319.30, Base + A1: $4,643,426.70, Base + A1 + A2: $4,777,763.70, Base + A1 + A2 + A3: $4,801,953.70
Funds Available: $4,830,000.00
No. of Addenda: 3
Number of Bidders: 9/5

Award Status: Awarded

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Thompson Bros. Excavating, Inc. - Base: $4,289,488.50, Base + A1: $4,455,788.50, Base + A1 + A2: $4,568,488.50, Base + A1 + A2 + A3: $4,594,488.50
Apparent 2nd: McDonald Excavating, Inc. - Base: $4,742,355.64, Base + A1: 4,877,455.64, Base + A1 + A2: $5,015,425.64, Base + A1 + A2 + A3: $5,036,425.64
Apparent 3rd: Tapani, Inc. - Base: $5,013,495.15, Base + A1: $5,150,095.15, Base + A1 + A2: $5,285,655.15, Base + A1 + A2 + A3: $5,305,155.15

VERIFIED BID TOTAL RESULTS

Low Bidder: Thompson Bros. Excavating, Inc.
Bid Amount: Base: $4,289,488.50, Base + A1: $4,455,788.50, Base + A1 + A2: $4,568,488.50, Base + A1 + A2 + A3: $4,594,488.50

Bid Information:

2nd Bidder: McDonald Excavating, Inc.
Bid Amount: Base: $4,742,355.64, Base + A1: 4,877,455.64, Base + A1 + A2: $5,015,425.64, Base + A1 + A2 + A3: $5,036,425.64

Bid Information:

3rd Bidder: Tapani, Inc.
Bid Amount: Base: $5,013,495.15, Base + A1: $5,150,095.15, Base + A1 + A2: $5,285,655.15, Base + A1 + A2 + A3: $5,305,155.15

Bid Information:


Item No. 4: SWR BREAKAWAY CABLE TERMINAL REPLACEMENT - INTERSTATE
Contract Number: 9417
Engineer's Estimate: $599,177.05
No. of Addenda: 0
Number of Bidders: 4/3

Award Status: Awarded

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Dirt & Aggregate Interchange, Inc. - $608,597.00
Apparent 2nd: Petersen Brothers, Inc. - $640,326.28
Apparent 3rd: Coral Construction Company - $837,777.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Dirt & Aggregate Interchange, Inc.
Bid Amount: $608,597.00

Bid Information:

2nd Bidder: Petersen Brothers, Inc.
Bid Amount: $640,326.28

Bid Information:

3rd Bidder: Coral Construction Company
Bid Amount: $837,777.00

Bid Information:


Item No. 5: OLYMPIA AREA SOUTHBOUND - CONGESTION MANAGEMENT
Contract Number: 9420
Engineer's Estimate: $873,704.00
No. of Addenda: 1
Number of Bidders: 3/2

Award Status: Awarded

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Northeast Electric, LLC - $927,777.00
Apparent 2nd: Titan Earthwork, LLC - $1,175,284.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Northeast Electric, LLC
Bid Amount: $927,777.00

2nd Bidder: Titan Earthwork, LLC
Bid Amount: $1,175,284.00


Item No. 6: SALMON CREEK FISH PASSAGE
Contract Number: 9414
Engineer's Estimate: $1,206,930.00
No. of Addenda: 1
Number of Bidders: 11/4

Award Status: Awarded

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Quigg Bros., Inc. - $1,186,934.00
Apparent 2nd: Rognlin's, Inc. - $1,239,721.36
Apparent 3rd: M.J. Hughes Construction, Inc. - $1,364,970.70

VERIFIED BID TOTAL RESULTS

Low Bidder: Quigg Bros., Inc.
Bid Amount: $1,186,934.00

Bid Information:

2nd Bidder: Rognlin's, Inc.
Bid Amount: $1,239,721.36

Bid Information:

3rd Bidder: M.J. Hughes Construction, Inc.
Bid Amount: $1,364,970.70

Bid Information:

3/27/2019 Bid Opening - Olympia, WA

Item No. 1: AGATE PASS BRIDGE - BRIDGE PAINTING
Contract Number: 9409
Engineer's Estimate: $10,577,150.00
No. of Addenda: 2
Number of Bidders: 16/10

Award Status: AWARDED 4/3/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Champion Painting Specialty Services Corp. - $8,015,044.00
Apparent 2nd: Panther Industrial Painting, LLC. - $9,328,077.20
Apparent 3rd: Liberty Maintenance, Inc. - $9,495,246.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Champion Painting Specialty Services Corp. - AWARDED 4/3/2019
Bid Amount: $8,015,044.00

Bid Information:

2nd Bidder: Panther Industrial Painting, LLC.
Bid Amount: $9,328,077.20

Bid Information:

3rd Bidder: Liberty Maintenance, Inc.
Bid Amount: $9,495,246.00

Bid Information:


Item No. 2: SOUTH BRANCH FRONIA CREEK AND FRONIA CREEK - FISH PASSAGE
Contract Number: 9412
Engineer's Estimate: $1,385,282.84
No. of Addenda: 3
Number of Bidders: 12/6

Award Status: AWARDED 4/3/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Stellar J Corporation - $1,383,884.20
Apparent 2nd: M.J. Hughes Construction, Inc. - $1,458,174.53
Apparent 3rd: Quigg Bros., Inc. - $1,542,156.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Stellar J Corporation - AWARDED 4/3/2019
Bid Amount: $1,383,884.20

Bid Information:

2nd Bidder: M.J. Hughes Construction, Inc.
Bid Amount: $1,458,174.53

Bid Information:

3rd Bidder: Quigg Bros., Inc.
Bid Amount: $1,542,156.00

Bid Information:


Item No. 3: STEVENS PASS - AVALANCHE DEFLECTION BERM
Contract Number: 9399
Engineer's Estimate: $429,901.84
No. of Addenda: 1
Number of Bidders: 7/3

Award Status: AWARDED 4/9/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Strider Construction Co., Inc. - $748,525.00
Apparent 2nd: Trimaxx Construction Incorporated - $842,348.00
Apparent 3rd: Conway Construction Company - $898,638.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Strider Construction Co., Inc.
Bid Amount: $748,525.00

Bid Information:

2nd Bidder: Trimaxx Construction Incorporated
Bid Amount: $842,348.00

Bid Information:

3rd Bidder: Conway Construction Company
Bid Amount: $898,638.00

Bid Information:


Item No. 4: CHEHALIS RIVER BRIDGE SCOUR REPAIR
Contract Number: 9403
Engineer's Estimate: $1,926,843.00
No. of Addenda: 2
Number of Bidders: 7/3

Award Status: AWARDED 4/3/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Quigg Bros., Inc. - $1,638,803.00
Apparent 2nd: Pacific Pile & Marine, L.P. - $1,685,853.00 $2,675,853.00**
Apparent 3rd: Rognlin's, Inc. - $1,711,761.00*

VERIFIED BID TOTAL RESULTS

Low Bidder: Quigg Bros., Inc. - AWARDED 4/3/2019
Bid Amount: $1,638,803.00

Bid Information:

2nd Bidder: Rognlin's, Inc.
Bid Amount: $1,711,761.00

Bid Information:

3rd Bidder: Pacific Pile & Marine, L.P.
Bid Amount: $2,675,853.00

Bid Information:


3/20/2019 Bid Opening - Olympia, WA

Item No. 1: 80TH AVE TO 108TH AVE CULVERT REPAIRS
Contract Number: 9401
Engineer's Estimate: $664,205.00
No. of Addenda: 2
Number of Bidders: 4/3

Award Status: Awarded

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Active Construction, Inc. - $1,177,177.00
Apparent 2nd: A-1 Landscaping and Construction, Inc. - $1,758,735.00
Apparent 3rd: Road Construction Northwest, Inc. - $2,534,574.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Active Construction, Inc. -AWARDED
Bid Amount: $1,177,177.00

2nd Bidder: A-1 Landscaping and Construction, Inc.
Bid Amount: $1,758,735.00

3rd Bidder: Road Construction Northwest, Inc.
Bid Amount: $2,534,574.00


Item No. 2: POMEROY TO EAST ALPOWA VICINITY CHIP SEAL
Contract Number: 9402
Engineer's Estimate: $1,798,328.00
No. of Addenda: 1
Number of Bidders: 7/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Central Washington Asphalt, Inc. - $1,622,222.22
Apparent 2nd: Poe Asphalt Paving, Inc. - $1,725,652.70
Apparent 3rd: Granite Construction Company - $1,781,781.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Central Washington Asphalt, Inc.
Bid Amount: $1,622,222.22

Bid Information:

2nd Bidder: Poe Asphalt Paving, Inc.
Bid Amount: $1,725,652.70

Bid Information:

3rd Bidder: Granite Construction Company
Bid Amount: $1,781,781.00

Bid Information:


Item No. 3: LUNZ RD VIC & CASCADE DR TO GRANITE CR RUMBLE STRIP
Contract Number: 9408
Engineer's Estimate: $1,118,066.00
No. of Addenda: 1
Number of Bidders: 3/2

Award Status: AWARDED 3/29/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Granite Construction Company - $667,853.60
Apparent 2nd: Construction Ahead, Inc. DBA Pavement Surface Control - $993,467.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Granite Construction Company - AWARDED 3/29/2019
Bid Amount: $667,853.60

Bid Information:

2nd Bidder: Construction Ahead, Inc. DBA Pavement Surface Control
Bid Amount: $993,467.00

Bid Information:


Item No. 4: 2019-21 ER REGIONWIDE BASIC SAFETY GUARDRAIL
Contract Number: 9404
Engineer's Estimate: $1,428,971.00
No. of Addenda: 2
Number of Bidders: 4/2

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Dirt and Aggregate Interchange, Inc. - $1,690,857.00
Apparent 2nd: Coral Construction Company - $2,299,229.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Dirt and Aggregate Interchange, Inc.
Bid Amount: $1,690,857.00

Bid Information:

2nd Bidder: Coral Construction Company
Bid Amount: $2,299,229.00

Bid Information:


Item No. 5: 2019 EASTERN REGION CHIP SEAL
Contract Number: 9407
Engineer's Estimate: $8,912,410.50
No. of Addenda: 2
Number of Bidders: 3/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Central Washington Asphalt, Inc. - $9,222,222.22
Apparent 2nd: Poe Asphalt Paving, Inc. - $10,975,540.81
Apparent 3rd: Granite Construction Company - $11,537,537.00**

VERIFIED BID TOTAL RESULTS

Low Bidder: Central Washington Asphalt, Inc.
Bid Amount: $9,222,222.22

Bid Information:

2nd Bidder: Poe Asphalt Paving, Inc.
Bid Amount: $10,975,540.81

Bid Information:

3rd Bidder: Granite Construction Company
Bid Amount: $11,537,536.99

Bid Information:


3/13/2019 Bid Opening - Olympia, WA

Item No. 1: SILVER LAKE SB RV DUMP STATION REHABILITATION - NWR (SMALL WORKS ROSTER)
Contract Number: 9370
Engineer's Estimate: $75,000.00
No. of Addenda: 2
Number of Bidders: 2/2

Award Status: AWARDED 3/22/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Transportation Systems, Inc. - $79,000.00
Apparent 2nd: Northeast Electric, LLC - $100,000.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Transportation Systems, Inc. AWARDED 3/22/2019
Bid Amount: $79,000.00

2nd Bidder: Northeast Electric, LLC
Bid Amount: $100,000.00


Item No. 2: WHITE PASS VICINITY MAJOR DRAINAGE - PHASE 2
Contract Number: 9396
Engineer's Estimate: $570,964.65
No. of Addenda: 1
Number of Bidders: 9/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Selland Construction, Inc. - $645,588.00
Apparent 2nd: Conway Construction Company - $999,323.00
Apparent 3rd: Quigg Bros. Inc. - $1,019,588.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Selland Construction, Inc.
Bid Amount: $645,588.00

2nd Bidder: Conway Construction Company
Bid Amount: $999,323.00

3rd Bidder: Quigg Bros. Inc.
Bid Amount: $1,019,588.00


Item No. 3: SR 204 INTERSECTION IMPROVEMENTS (STAGE 1)
Contract Number: 9374
Engineer's Estimate: $1,664,641.00
No. of Addenda: 3
Number of Bidders: 9/7

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Marshbank Construction, Inc. - $ 1,201,059.80
Apparent 2nd: Granite Construction Company - $1,284,861.00
Apparent 3rd: Trimaxx Construction Incorporated - $1,321,547.45

VERIFIED BID TOTAL RESULTS

Low Bidder: Marshbank Construction, Inc.
Bid Amount: $1,201,059.80

Bid Information:

2nd Bidder: Granite Construction Company
Bid Amount: $1,284,861.00

Bid Information:

3rd Bidder: Trimaxx Construction Incorporated
Bid Amount: $1,321,547.45

Bid Information:


Item No. 4: PLUM ST TO S TACOMA WAY - PAVING
Contract Number: 9384
Engineer's Estimate: $1,944,544.50
No. of Addenda: 2
Number of Bidders: 5/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Granite Construction Company - $2,241,876.10
Apparent 2nd: Tucci & Sons, Inc. - $2,490,373.00
Apparent 3rd: Lakeside Industries, Inc. - $2,709,325.30

VERIFIED BID TOTAL RESULTS

Low Bidder: Granite Construction Company
Bid Amount: $2,241,876.10

Bid Information:

2nd Bidder: Tucci & Sons, Inc.
Bid Amount: $2,490,373.00

Bid Information:

3rd Bidder: Lakeside Industries, Inc.
Bid Amount: $2,709,325.30

Bid Information:


Item No. 5: BULLFROG RD VIC - CONCRETE REHAB, BRIDGE DECK REHAB & PAINTING
Contract Number: 9385
Engineer's Estimate: $16,398,303.31
No. of Addenda: 5
Number of Bidders: 12/5

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Max J. Kuney Company - $14,801,298.50
Apparent 2nd: Hamilton Construction Co. - $16,267,635.98
Apparent 3rd: IMCO General Construction, Inc. - $16,342,838.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Max J. Kuney Company
Bid Amount: $14,801,298.50

Bid Information:

2nd Bidder: Hamilton Construction Co.
Bid Amount: $16,267,635.98

Bid Information:

3rd Bidder: IMCO General Construction, Inc.
Bid Amount: $16,342,838.00

Bid Information:


Item No. 6: HAYFORD RD TO DEER HEIGHTS RD CHANNELIZATION (SMALL WORKS ROSTER)
Contract Number: 9395
Engineer's Estimate: $235,749.00
No. of Addenda: 2
Number of Bidders: 6/2

Award Status: Awarded 3/15/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Cameron-Reilly, LLC - $342,559.00
Apparent 2nd: Wm. Winkler Company - $379,182.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Cameron-Reilly, LLC - Awarded 3/15/2019
Bid Amount: $342,559.00

2nd Bidder: Wm. Winkler Company
Bid Amount: $379,182.00


3/6/2019 Bid Opening - Olympia, WA

Item No. 1: NINE MILE HILL TO FRENCHTOWN VIC TURNBACK IMPROVEMENTS
Contract Number: 9391
Engineer's Estimate: $949,100.15
No. of Addenda: 2
Number of Bidders: 3/2

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Central Washington Asphalt, Inc. - $1,120,386.00
Apparent 2nd: CPM Development Corporation DBA Inland Asphalt - $1,190,371.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Central Washington Asphalt, Inc.
Bid Amount: $1,120,386.00

2nd Bidder: CPM Development Corporation DBA Inland Asphalt
Bid Amount: $1,190,371.00


Item No. 2: BCT REPLACEMENT AND ROADSIDE SAFETY
Contract Number: 9392
Engineer's Estimate: $1,783,130.50
No. of Addenda: 1
Number of Bidders: 4/3

Award Status: Awarded - 3/13/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Dirt and Aggregate Interchange, Inc. - $1,798,798.00
Apparent 2nd: Petersen Brothers, Inc. - $1,978,050.34
Apparent 3rd: Coral Construction Company - $3,141,592.65

VERIFIED BID TOTAL RESULTS

Low Bidder: Dirt and Aggregate Interchange, Inc. Awarded - 3/13/2019
Bid Amount: $1,798,798.00

Bid Information:

2nd Bidder: Petersen Brothers, Inc.
Bid Amount: $1,978,050.34

Bid Information:

3rd Bidder: Coral Construction Company
Bid Amount: $3,141,592.65

Bid Information:


Item No. 3: ELLENSBURG VIC TO VANTAGE - PAVING
Contract Number: 9390
Engineer's Estimate: $6,276,163.00
No. of Addenda: 1
Number of Bidders: 2/2

Award Status: Awarded - 3/13/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Interstate Concrete & Asphalt Company DBA Columbia Asphalt & Ready Mix - $5,558,319.00
Apparent 2nd: Central Washington Asphalt, Inc. - $5,634,032.30
Apparent 3rd: Granite Construction Company - $6,187,371.25

VERIFIED BID TOTAL RESULTS

Low Bidder: Interstate Concrete & Asphalt Company DBA Columbia Asphalt & Ready Mix - Awarded - 3/13/2019
Bid Amount: $5,558,319.00

Bid Information:

2nd Bidder: Central Washington Asphalt, Inc.
Bid Amount: $5,634,032.30

Bid Information:

3rd Bidder: Granite Construction Company
Bid Amount: $6,187,371.25

Bid Information:


Item No. 4: ANACORTES FERRY TERMINAL PARKING LOT AND SLIP 1 PAVING
Contract Number: 9393
Engineer's Estimate: $578,470.00
No. of Addenda: 1
Number of Bidders: 2/2

Award Status: Awarded - 3/13/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Lakeside Industries, Inc. - $391,684.00
Apparent 2nd: Granite Construction Company - $515,473.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Lakeside Industries, Inc. - Awarded - 3/13/2019
Bid Amount: $391,684.00

2nd Bidder: Granite Construction Company
Bid Amount: $515,473.00


Item No. 5: PIERCE CO LINE TO S 359TH ST VIC PAVING
Contract Number: 9397
Engineer's Estimate: $1,391,748.00
No. of Addenda: 1
Number of Bidders: 4/4

Award Status: Awarded - 3/13/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Tucci & Sons, Inc. - $868,400.45**
Apparent 2nd: Miles Resources, LLC - $980,596.20
Apparent 3rd: Lakeside Industries, Inc. - $1,042,701.16

VERIFIED BID TOTAL RESULTS

Low Bidder: Tucci & Sons, Inc. - Awarded - 3/13/2019
Bid Amount: $868,800.45

Bid Information:

2nd Bidder: Miles Resources, LLC
Bid Amount: $980,596.20

Bid Information:

3rd Bidder: Lakeside Industries, Inc.
Bid Amount: $1,042,701.16

Bid Information:


Item No. 6: TAWES CR & TWO TRIBUTARIES TO TAWES CR - FISH PASSAGE
Contract Number: 9380
Engineer's Estimate: $2,171,399.50
No. of Addenda: 4
Number of Bidders: 10/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Faber Construction Corp. - $1,951,955.12
Apparent 2nd: IMCO General Construction, Inc. - $2,661,704.00
Apparent 3rd: Tiger Construction, Ltd. - $2,769,871.05

VERIFIED BID TOTAL RESULTS

Low Bidder: Faber Construction Corp. - Rejected 3/14/2019
Bid Amount: $1,951,955.12

Bid Information:

2nd Bidder: IMCO General Construction, Inc.
Bid Amount: $2,661,704.00

Bid Information:

3rd Bidder: Tiger Construction, Ltd.
Bid Amount: $2,769,871.05

Bid Information:


2/27/2019 Bid Opening - Olympia, WA

Item No. 1: GRAND COULEE BRIDGE UPGRADE ILLUMINATION
Contract Number: 9387
Engineer's Estimate: $315,003.00
No. of Addenda: 0
Number of Bidders: 4/4

Award Status: AWARDED - 3/6/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Colvico, Inc. - $242,086.00
Apparent 2nd: Northeast Electric, LLC - $380,503.00
Apparent 3rd: Neppel Electrical & Controls, LLC - $426,503.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Colvico, Inc. - AWARDED - 3/6/2019
Bid Amount: $242,086.00

2nd Bidder: Northeast Electric, LLC
Bid Amount: $380,503.00

3rd Bidder: Neppel Electrical & Controls, LLC
Bid Amount: $426,503.00


Item No. 2: METHOW RIVER BRIDGES STRUCTURAL REHABILITATION - PHASE 3
Contract Number: 9388
Engineer's Estimate: $1,319,232.50
No. of Addenda: 1
Number of Bidders: 6/2

Award Status: AWARDED - 3/6/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Hamilton Construction Co. - $1,109,096.00
Apparent 2nd: Combined Construction, Inc. - $1,242,001.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Hamilton Construction Co. - AWARDED - 3/6/2019
Bid Amount: $1,109,096.00

Bid Information:

Subcontractors Named

  1. NA
    Description of work:

2nd Bidder: Combined Construction, Inc.
Bid Amount: $1,242,001.00

Bid Information:

Subcontractors Named

  1. NA
    Description of work:

Item No. 3: SUNNYSIDE VIC TO PROSSER VIC - PAVING & ADA
Contract Number: 9386
Engineer's Estimate: $2,224,857.38
No. of Addenda: 1
Number of Bidders: 3/3

Award Status:AWARDED - 3/6/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Central Washington Asphalt, Inc. - $2,238,377.32
Apparent 2nd: Granite Construction Company - $2,676,012.00
Apparent 3rd: CPM Development Corporation DBA Inland Asphalt Company - $2,777,777.77

VERIFIED BID TOTAL RESULTS

Low Bidder: Central Washington Asphalt, Inc. - AWARDED - 3/6/2019
Bid Amount: $2,238,377.32

Bid Information:

Subcontractors Named

  1. Neppel Electrical & Controls, LLC
    Description of work: Electrical, traffic signal installation.

2nd Bidder: Granite Construction Company
Bid Amount: $2,676,012.00

Bid Information:

Subcontractors Named

  1. Neppel Electrical & Controls, LLC
    Description of work: Electrical

3rd Bidder: CPM Development Corporation DBA Inland Asphalt Company
Bid Amount: $2,777,777.77

Bid Information:

Subcontractors Named

  1. Sierra Electric, Inc.
    Description of work: Traffic signal system.

Item No. 4: RUSH RD. TO 13TH ST. CRACK SEALING
Contract Number: 9389
Engineer's Estimate: $543,754.95
No. of Addenda: 0
Number of Bidders: 3/3

Award Status: AWARDED - 3/6/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Granite Construction Company - $509,532.60
Apparent 2nd: Construction Ahread Inc. DBA Pavement Surface Control - $651,302.00
Apparent 3rd: Conway Construction Company - $827,276.68

VERIFIED BID TOTAL RESULTS

Low Bidder: Granite Construction Company - AWARDED - 3/6/2019
Bid Amount: $509,532.60

Bid Information:

2nd Bidder: Construction Ahead Inc. DBA Pavement Surface Control
Bid Amount: $651,302.00

Bid Information:

3rd Bidder: Conway Construction Company
Bid Amount: $827,276.68

Bid Information:


Item No. 5: SE 164TH AVE TO NW 6TH AVE PAVING
Contract Number: 9394
Engineer's Estimate: $2,565,902.70
No. of Addenda: 2
Number of Bidders: 3/2

Award Status:AWARDED - 3/6/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Granite Construction Company - $2,188,188.00
Apparent 2nd: Lakeside Industries, Inc. - $2,314,314.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Granite Construction Company - AWARDED - 3/6/2019
Bid Amount: $2,188,188.00

Bid Information:

Subcontractors Named

  1. Mill Plain Electric
    Description of work: Electrical

2nd Bidder: Lakeside Industries, Inc.
Bid Amount: $2,314,314.00

Bid Information:

Subcontractors Named

  1. Mill Plain Electric
    Description of work: Electrical

Item No. 6: SR 167 COMPLETION DEMO #2 (SMALL WORKS ROSTER)
Contract Number: NA
Engineer's Estimate: $213,954.00
No. of Addenda: 2
Number of Bidders: 9/4

Award Status: Awarded 3/15/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Skycorp, Ltd. - $85,944.00
Apparent 2nd: Northwest Cascade, Inc. - $125,512.00
Apparent 3rd: 3 Kings Environmental, Inc. - $159,459.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Skycorp, Ltd. - Awarded 3/15/2019
Bid Amount: $85,944.00

2nd Bidder: Northwest Cascade, Inc.
Bid Amount: $125,512.00

3rd Bidder: 3 Kings Environmental, Inc.
Bid Amount: $159,459.00


2/21/2019 Bid Opening - Olympia, WA

Item No. 1: MOUNT BAKER AREA BST - 2019
Contract Number: 9372
Engineer's Estimate: $6,218,762.10
No. of Addenda: 3
Number of Bidders: 3/3

Award Status: AWARDED 3/1/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Doolittle Construction, LLC - $6,142,011.70
Apparent 2nd: Granite Construction Company - $6,223,392.00
Apparent 3rd: Central Washington Asphalt, Inc. - $7,470,000.00

VERIFIED BID TOTAL RESULTS

Low Bidder: Doolittle Construction, LLC - AWARDED 3/1/2019
Bid Amount: $6,142,011.70

Bid Information:

Subcontractors Named

  1. NA
    Description of work:

2nd Bidder: Granite Construction Company
Bid Amount: $6,223,392.00

Bid Information:

Subcontractors Named

  1. NA
    Description of work:

3rd Bidder: Central Washington Asphalt, Inc.
Bid Amount: $7,470,000.00

Bid Information:

Subcontractors Named

  1. NA
    Description of work:

Item No. 2: HYAK TO STAMPEDE PASS PHASES 1F & 2F - FENCING 1B & 2A
Contract Number: 9376
Engineer's Estimate: $2,134,973.00
No. of Addenda: 1
Number of Bidders: 5/2

Award Status: AWARDED - 3/6/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Graham Contracting, Ltd. - $2,818,862.00
Apparent 2nd: Guy F. Atkinson, LLC - $2,895,111.50

VERIFIED BID TOTAL RESULTS

Low Bidder: Graham Contracting, Ltd. - AWARDED - 3/6/2019
Bid Amount: $2,818,862.00

Bid Information:

Subcontractors Named

  1. NA
    Description of work:

2nd Bidder: Guy F. Atkinson, LLC
Bid Amount: $2,895,111.50

Bid Information:

Subcontractors Named

  1. Totem Electric
    Description of work: Electrical

Item No. 3: NORTH CREEK BRIDGE TO SR 9 VIC PAVING
Contract Number: 9378
Engineer's Estimate: $4,740,915.00
No. of Addenda: 2
Number of Bidders: 4/3

Award Status: AWARDED 3/1/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Lakeside Industries, Inc. - $4,081,626.50
Apparent 2nd: Cadman Materials, Inc. - $4,495,959.45
Apparent 3rd: Granite Construction Company - $5,360,999.50

VERIFIED BID TOTAL RESULTS

Low Bidder: Lakeside Industries, Inc. - AWARDED 3/1/2019
Bid Amount: $4,081,626.50

Bid Information:

Subcontractors Named

  1. G&G Inc.
    Description of work: Electrical

2nd Bidder: Cadman Materials, Inc.
Bid Amount: $4,495,959.45

Bid Information:

Subcontractors Named

  1. G&G Corp
    Description of work: Electrical

3rd Bidder: Granite Construction Company
Bid Amount: $5,360,999.50

Bid Information:

Subcontractors Named

  1. G&G Inc.
    Description of work: Electrical

Item No. 4: SMYTHE RD TO PARADISE RD PAVING
Contract Number: 9381
Engineer's Estimate: $730,766.40
No. of Addenda: 3
Number of Bidders: 3/3

Award Status: AWARDED 3/1/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Shamrock Paving, Inc. - $856,856.00
Apparent 2nd: CPM Development Corporation DBA Inland Asphalt Corporation - $898,000.98
Apparent 3rd: Poe Asphalt Paving, Inc. - $909,977.65

VERIFIED BID TOTAL RESULTS

Low Bidder: Shamrock Paving, Inc. - AWARDED 3/1/2019
Bid Amount: $856,856.00

Bid Information:

2nd Bidder: CPM Development Corporation DBA Inland Asphalt Corporation
Bid Amount: $898,000.98

Bid Information:

3rd Bidder: Poe Asphalt Paving, Inc.
Bid Amount: $909,977.65

Bid Information:


Item No. 5: BANTA RD INTERSECTION SAFETY IMPROVEMENTS
Contract Number: 9382
Engineer's Estimate: $1,479,735.20
No. of Addenda: 2
Number of Bidders: 7/2

Award Status: AWARDED - 3/6/2019

PRELIMINARY BID TOTAL RESULTS
Apparent Low: SRV Construction, Inc. - $1,994,212.85**
Apparent 2nd: Colacurcio Brothers, Inc. - $2,098,221.10

VERIFIED BID TOTAL RESULTS

Low Bidder: SRV Construction, Inc. - AWARDED - 3/6/2019
Bid Amount: $2,054,212.85

Bid Information:

Subcontractors Named

  1. Sail Electric
    Description of work: Electrical

2nd Bidder: Colacurcio Brothers, Inc.
Bid Amount: $2,098,221.10

Bid Information:

Subcontractors Named

  1. Sail Electric
    Description of work: Electrical

2/6/2019 Bid Opening - Olympia, WA

Item No. 1: SR 271 TO PLAZA RD - PAVING
Contract Number: 9377
Engineer's Estimate: $3,270,139.57
No. of Addenda: 1
Number of Bidders: 4/3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: Shamrock Paving, Inc. - $3,245,934.98
Apparent 2nd: CPM Development Corporation DBA Inland Asphalt Company - $3,930,000.93
Apparent 3rd: Poe Asphalt Paving, Inc. - $3,972,033.20

VERIFIED BID TOTAL RESULTS

Low Bidder: Shamrock Paving, Inc.
Bid Amount: $3,245,934.98

Bid Information:

Subcontractors Named

  1. None proposed.
    Description of work:

2nd Bidder: CPM Development Corporation DBA Inland Asphalt Company
Bid Amount: $3,930,000.93

Bid Information:

Subcontractors Named

  1. NA
    Description of work:

3rd Bidder: Poe Asphalt Paving, Inc.
Bid Amount: $3,972,033.20

Bid Information:

Subcontractors Named

  1. NA
    Description of work:

Item No. 2: NB SENECA ST TO SR 520 MOBILITY IMPROVEMENTS
Contract Number: 9361
Engineer's Estimate: $16,492,808.50
No. of Addenda: 5
Number of Bidders: 5/ 3

Award Status: Pending

PRELIMINARY BID TOTAL RESULTS
Apparent Low: C.A. Carey Corporation - $22,377,276.50
Apparent 2nd: Ceccanti, Inc. - $23,286,529.00
Apparent 3rd: Granite Construction Company - $26,621,759.00

VERIFIED BID TOTAL RESULTS

Low Bidder: C.A. Carey Corporation
Bid Amount: $22,377,276.50

Bid Information:

Subcontractors Named

  1. Elcon Corporation
    Description of work: Electrical
  2. Self Perform
    Description of work: Plumbing
  3. HVAC N/A
    Description of work:

2nd Bidder: Ceccanti, Inc.
Bid Amount: $23,286,529.00

Bid Information:

Subcontractors Named

  1. Ceccanti, Inc.
    Description of work: Plumbing
  2. Elcon Corporation
    Description of work: Electrical

3rd Bidder: Granite Construction Company
Bid Amount: $26,621,759.00

Bid Information:

Subcontractors Named

  1. Elcon Corporation
    Description of work: Electrical

 

Bid Opening Results are available online for 1 year after bid opening.
Please note: A Public Records Request is required to disseminate any information not listed here.