WSDOT

Desktop

Commercial Vehicle Restrictions

If you do not see the route you are looking for, no restrictions have been reported.

Interstate:

US Highways:

State Highways:


Oversize/Overweight Restrictions
Showing 8 newest restrictions
SR 433, MP: 0 to .94, Direction: Both
Date Updated: 1/15/2020 8:23 AM
Date Effective: 1/15/2020 8:23 AM

Effective Monday, February 24th through Friday, February 28th. No overwidth loads allowed on the Bridge from 7:00am to 4:00pm each day.

More
SR 823, MP: 3.15 to 4.5, Direction: Both
Date Updated: 1/8/2020 7:29 AM
Date Effective: 1/8/2020 7:29 AM

Oversize loads traveling on SR-823 between milepost 3.15 to 4.5 will be restricted to 10’ wide until further notice, due to bridge work.

More
I-82, MP: 114.39, Direction: E
BL Max: CL8 Max:
“Permit loads shall travel the centerline of the roadway”.

More
US 101, MP: 162.5 to 162.7, Direction: Both
Date Updated: 12/9/2019 7:28 AM
Date Effective: 12/9/2019 7:28 AM

The speed limit has been reduced to 25 mph and a shoofly detour bridge is in place. The bridge has relatively sharp, low-radius entry and exit curves. Loads 12ft wide or less and loads 80ft in overall length or less, can navigate through the shoofly. Longer, narrower loads may be able to navigate the site and will be individually evaluated. Shorter, wider loads may be able to navigate the site and should be individually evaluated. We will refine these figures in the weeks ahead.

More
US 101, MP: 147.5 to 147.6, Direction: Both
Date Updated: 12/9/2019 7:25 AM
Date Effective: 12/9/2019 7:25 AM

The speed limit has been reduced to 25 mph and a shoofly detour bridge is in place. The bridge has relatively sharp, low-radius entry and exit curves. Loads 12ft wide or less and loads 80ft in overall length or less, can navigate through the shoofly. Longer, narrower loads may be able to navigate the site and will be individually evaluated. Shorter, wider loads may be able to navigate the site and should be individually evaluated. We will refine these figures in the weeks ahead.

More
US 101, MP: 146.8 to 147, Direction: Both
Date Updated: 12/9/2019 7:23 AM
Date Effective: 12/9/2019 7:23 AM

The speed limit has been reduced to 25 mph and a shoofly detour bridge is in place. The bridge has relatively sharp, low-radius entry and exit curves. Loads 12ft wide or less and loads 80ft in overall length or less, can navigate through the shoofly. Longer, narrower loads may be able to navigate the site and will be individually evaluated. Shorter, wider loads may be able to navigate the site and should be individually evaluated. We will refine these figures in the weeks ahead.

More
SR 506, MP: 8 to 8.2, Direction: Both
Date Updated: 12/4/2019 1:33 PM
Date Effective: 12/4/2019 1:33 PM

SR 506, mileposts 8-8.2 both directions. Roadway closed due to Bridge replacement.

More
I-82, MP: 38 to 38, Direction: E
Date Updated: 11/22/2019 12:36 PM
Date Effective: 11/22/2019 12:36 PM

I-82 Eastbound on-ramp from Main Street, no loads over 16' wide, effective thru April 2020.

More
Home