US 395 - Arden to Colville - Paving - Complete September 2018

Project news

US 395 was resurfaced with hot mix asphalt.  ADA sidewalk work was included.  Some minor corrective items remain.  Central Washington Asphalt of Moses Lake, WA handled the project with a construction bid of $3,491,873.

Needs & benefits

High traffic volumes with normal wear and tear had deteriorated the pavement surface. Resurfacing provides a better experience for drivers with a reduced need for repairs and patching.

Timeline

The project was mostly constructed during 2017.  A few corrective items remained as of March 27, 2018. The project was completed in September 2018.

Funding

Financial Data for PIN 639522T
Amount ($ in thousands)

  • Pre-Existing Funds (PEF) - $4,349
  • Total - $4,349