US 2 - Eagle Falls Vic to Tye Creek - Resurfacing - Completed October 2017

Overview
WSDOT contractor crews resurfaced three segments of US 2 totaling almost 17 miles of roadway between Gold Bar and Skykomish. The project was a combination of chip sealing and repaving. Two segments totaling more than eight miles was chip sealed, while the other eight-mile segment received a new layer of asphalt.

 

How you benefit

Improves safety
Removing cracks, potholes and wheel ruts reduces the chance for water to pool on the roadway, creating a safer and smoother ride for drivers.

Economic incentive
The new pavement will reduce the need for maintenance and emergency road repairs, saving money long-term.

 

Funding
Pre-Existing Funds (PEF): $3,280,000
Connecting Washington (CWA): $1,125,000
Total: $4,404,000

 

Contact us
Marqise Allen
WSDOT communications
Phone: 206-440-4699
E-mail: allenmq@wsdot.wa.gov