Ground off the existing top layer of asphalt and installed new hot mix asphalt driving surface.

 

How you benefit

Improves safety
A hot-mix asphalt (HMA) overlay restores a smooth driving surface.

Economic incentive
Replacing the top layer of asphalt pavement prevents intrusion of water into the underlying layers and ultimate degradation of the entire pavement structure, protecting the public investment.

 

Partnerships & cooperation
WSDOT addresses the concerns of tribal nations using the process outlined in Section 106 of the National Historic Preservation Act and the WSDOT Tribal Consultation Policy adopted in 2003 by the Transportation Commission as part of the WSDOT Centennial Accord Plan.

 

Funding
Pre-Existing Funds (PEF): $2,742,000