More than 3 miles of cracked pavement on SR 530 between I-5 and SR 9 in Arlington will be repaved in summer 2018.
Five sidewalk ramps at the SR 530/SR 9 intersection will be upgraded to provide a smoother and more gradual slope for pedestrians.