SR 530 - I-5 Interchange to SR 9 - Paving and ADA Compliance - Project photos

A large picture of the cracked pavement on SR 530 between I-5 and SR 9

More than 3 miles of cracked pavement on SR 530 between I-5 and SR 9 in Arlington will be repaved beginning in spring of 2018.
 

A large picture of a pedestrian sidewalk ramp that will be improved along SR 530

Five sidewalk ramps at the SR 530/SR 9 intersection will be upgraded to provide a smoother and more gradual slope for pedestrians.