SR 528 - 55th Dr NE Vic to 83rd Ave NE Vic - Paving & ADA Compliance - Completed November 2017

Overview

On SR 528 between 55th Drive Northeast and 83rd Avenue Northeast in Marysville, we completed grinding, repaving and striping to rehabilitate about 1.76 miles of the highway. We also rebuilt 12 sidewalk ramps and added 11 new ramps along SR 528 to create better sidewalk connections for people of all abilities.

How you benefit

Improves safety
Repaving the highway removed ruts and cracks, where water can puddle and reduce traction for vehicles.

Rebuilding 12 sidewalk ramps and adding 11 new ramps smooths the transition between the sidewalk and road level, creating better sidewalk connections for people of all abilities.

Economic incentive
Repaving preserves this section of highway and extends its lifespan by protecting the roadway’s supporting layers underneath the driving surface. Repaving also removes cracks and potholes, which reduces annual maintenance costs and the possibility of emergency repairs.

Funding

Pre-existing Fund (PEF) $770,000
Connecting Washington $2.53 million
Total: $3.3 million

Contact us

Northwest Region communications
15700 Dayton Avenue North
Seattle, WA 98133
206-440-4697
NWPublicAffairs@wsdot.wa.gov