SR 509 - S 168th St to S 112th St Vic - Paving, ADA, & Barrier Replacement - Photos

A large picture of the new concrete barrier on SR 509 in Burien
WSDOT contractor crews place new concrete barrier in the median of SR 509 in Burien.


Contractor crews working for WSDOT work to improve drainage in the median of SR 509 in Burien.


Work to improve drainage in the median of SR 509 will continue through the month of June.

A large picture showing cracked pavement on SR 509 in Burien.

The pavement on northbound SR 509 in Burien is cracked and in need of repair. Contractor crews will grind the top layer and repave the road with asphalt.

A large picture showing a curb ramp on northbound SR 509 that will be reconstructed during the project.

Four pedestrian curb ramps on northbound SR 509 at South 128th Street will be upgraded to meet ADA standards.


A large picture showing rusted guardrail that will be replaced with concrete barrier on SR 509 in Burien.

Approximately 3 miles of old guardrail in the median of SR 509 will  be replaced with concrete barrier.