SR 526 - 5th Ave. West to Casino Road Guardrail Replacement - Project Map

Starting in September, WSDOT will replace more than 7,700 feet of existing guardrail with new, taller guardrail on SR 526 in Everett.
WSDOT replaced more than 7,700 feet of existing guardrail with new, taller guardrail on the outer edges of the highway and concrete barrier in the center roadway of SR 526 in Everett.