I-5 - 116th St NE Interchange - Tulalip Tribes Lead - Road Closures

No exact dates of closures and detours have been determined at this time.
Most construction will take place during the day behind temporary concrete barriers. However, drivers can expect one overnight full closure of I-5 at 116th Street Northeast from midnight to 3 a.m. During the closure, contract crews will test the water and sewer pipes over the interstate to make sure these services will work.

116th Street Northeast over I-5 will also be completely closed overnight for a maximum of five nights so contractor crews can install the traffic signal system and sign bridges.
The closures will be from 11 p.m. to 8 a.m.
The exact dates have not been determined, but below is the planned detour route. The 116th ramps to and from I-5 will remain open while the bridge is closed.

Detour route for 116th Street Northeast bridge

On- and off-ramp closures will happen overnight from 8 p.m. to 6 a.m. At separate times on- and off-ramps from I-5 and 116th Street Northeast will be closed.
The exact dates have not been determined, but below are the planned detour routes. 
I-5 northbound off-ramp closure detour route:

Detour route for northbound I-5 off-ramp closure

I-5 northbound on-ramp closure detour route:

I-5 northbound on-ramp closure detour route

I-5 southbound on-ramp closure detour route:

Detour route for I-5 southbound on-ramp closure

I-5 southbound off-ramp detour route:

I-5 southbound off-ramp detour map


The rest of the work on this project will be done during partial lane and shoulder closures at night. 

This page will be updated when the exact dates for these closures are selected.