Find contracting opportunities that include engineering contracts for design and construction projects, service contracts for transportation studies and media as well as Information Technology (IT) goods and/or services.
Search contracting opportunities
You might be looking for the public works Call for Bids or the advanced schedule of public works contracts
126 results
SR 203, High Rock Rd & 203rd St SE - Intersection Improvement
Publication date:
Contract number: XE3509
Submittal due:
Installing one compact roundabout, planing bituminous pavement, paving, pavement marking, luminaire installation, sign removal and installation, drainage, temporary erosion and water pollution control, roadside restoration, traffic control and other work. Involves 40 working days and 66 items. Work…
SR 24 et al, Strategic Pavement Preservation - 2024
Publication date:
Contract number: XE3510
Submittal due:
Pavement repair, hot mix asphalt (HMA) paving, centerline rumble strip, temporary pavement marking, traffic control and other work. Involves 40 working days and 27 items. Working class 3 or 4.
SR 302, Victor Creek - Remove Fish Barrier
Publication date:
Contract number: XE3512
Submittal due:
Replacing the existing 24-inch-diameter high density polyethylene (HDPE) pipe and 36-inch-diameter concrete culvert with a 30-foot concrete bridge structure. The work includes a temporary stream diversion system, erosion control, dewatering, clearing and grubbing, tree removal, structure and…
2024 Freight Mobility Strategic Investment Board (FMSIB) Six-Year Plan Preparation
Publication date:
Submittal due:
The Washington State Freight Mobility Strategic Investment Board (FMSIB) solicits interest from consultants who wish to be evaluated and considered to provide a FMSIB Six-Year Plan Preparation. One (1) agreement may be awarded.
The agreement will be approximately one (1) year in…
The agreement will be approximately one (1) year in…
I-5 & SR 539, Baker Creek & Spring Creek – Fish Passage
Publication date:
Contract number: XE3507
Submittal due:
This project will replace five existing fish barrier culvert crossings at the following locations: (i) I-5 at Baker Creek & Spring Creek (milepost 255.76 to milepost 256.76) and (ii) SR 539 at Baker Creek (milepost 0.00 to 0.35). The aforementioned include Washington Department of Fish and…
I-5 ET AL. Northwest Region Ramps HMA Paving & ADA
Publication date:
Contract number: XE3505
Submittal due:
Hot mix asphalt (HMA) paving, pavement marking, retrofitting curb ramps to ADA guidelines, temporary erosion control, intelligent transportation system (ITS), traffic signals, traffic control and other work. Involves 83 items and 68 working days. Work class 4.
SR 92, Pilchuck River CED - Woody Debris Repair
Publication date:
Contract number: XE3506
Submittal due:
Replacement of existing large woody material along the bank of the Pilchuck River to provide fish habitat, clearing and grubbing, erosion control, grading, placing log jacks and logs with rock collars, temporary access, planting, traffic control and other work. Involves 34 items and 50 working days…
2024 ER Transportation Management Center Relocation
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide deliverables as identified in attached scope of work. One (1) agreement may be awarded.
…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide deliverables as identified in attached scope of work. One (1) agreement may be awarded.
…
SR 20, UNT to Coal Creek Fish Passage
Publication date:
Contract number: XE3498
Submittal due:
Requires installing a buried fish passage structure, grading, hot mix asphalt (HMA) paving, pavement marking, guardrails, temporary erosion control, planting, traffic control and other work. Involves 92 items and 50 working days. Work class 1 or 6.
SR 104, Paradise Bay - Shine Road & SR 19 Safety Improvements
Publication date:
Contract number: XE3502
Submittal due:
Requires grading, splitter and center island construction, hot mix asphalt paving, placing crushed surfacing base course, bioswales, detention pond, drainage improvements, media filter drains, illumination, signing, detours, pavement marking, clearing and grubbing, tree removal, landscaping,…
I-5, SB Edgar St to E Gwinn Pl Noise Wall
Publication date:
Contract number: XE3499
Submittal due:
Involves constructing a noise barrier wall, clearing and grubbing, erosion control, planting, traffic control and other work. Involves 68 items and 105 working days. Work class 6 or 20.
2024 Community Centered Transportation Leadership to Curb Carbon
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide grant program development and awards in support of Community-Centered Transportation Leadership to…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide grant program development and awards in support of Community-Centered Transportation Leadership to…
2024 Reconnecting East Central Spokane
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide services. One (1) agreement may be awarded. The agreement will be approximately five (5) years in…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide services. One (1) agreement may be awarded. The agreement will be approximately five (5) years in…
2024 Toll Division Educational Marketing and Advertising Services
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide statewide toll educational marketing and advertising services. One (1) agreement may be awarded.…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide statewide toll educational marketing and advertising services. One (1) agreement may be awarded.…
SR112, E Fork Whiskey Creek - Remove Fish Barriers
Publication date:
Contract number: XE3503
Submittal due:
Replace 12 existing fish barrier crossings on SR112 in Clallam County with fish passable structures (buried structures and bridges) in compliance with the Federal Injunction regarding fish passage underneath WSDOT highways.
SR 20, Coupeville Ferry Terminal/Agent Office
Publication date:
Contract number: XE3496
Submittal due:
Replacing the Coupeville agent’s office and other work. Involves 32 items and 140 working days. Class 7 or 16.
2023 Grants Subject Matter Expert Services for WSF
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide Grants Subject Matter Expert Services for Washington State Ferries. One (1) agreement may be awarded…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide Grants Subject Matter Expert Services for Washington State Ferries. One (1) agreement may be awarded…
2023 SR3 Gorst Area PEL and NEPA Studies
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide SR 3 Gorst Area PEL and NEPA Studies. One (1) agreement may be awarded. The agreement will be…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide SR 3 Gorst Area PEL and NEPA Studies. One (1) agreement may be awarded. The agreement will be…
2024 FAA Statewide Disparity Study
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide a Statewide Airport Disadvantaged Business Enterprise (DBE) Program Disparity Study.
…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide a Statewide Airport Disadvantaged Business Enterprise (DBE) Program Disparity Study.
…
SR 92, SR 204, & SR 528 - Fish Passages
Publication date:
Contract number: XE3483
Submittal due:
Design-Build Project. Remove three fish barriers and replace them with fish-passable crossings at SR 92 Lundeen Creek WDFW (#991827), SR 204 UNT to Ebey Slough (WDFW #995138), and SR 528 Munson Creek (WDFW #990294). The project shall include, but is not limited to, the following: Design and…
2023 CW Branch SR 904 Betz Rd Crossing - PCC
Publication date:
Contract number: XE3425
Submittal due:
Removing sidewalk, curb, gutter, pavement markings, and roadway excavation, installing crushed surfacing base course (CSBC), hot mix asphalt(HMA), curb and gutter, sidewalk, pavement markings, conduit, rail joints, replacing rail and crossings, ballast distribution, surface line and dress,…
2023 Engineering Geology & Rock/Rockfall Geotechnical Project Delivery
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide services for senior level engineering geology, rock/rockfall related related work.
One…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide services for senior level engineering geology, rock/rockfall related related work.
One…
2023 Washington State Ferries (WSF) Fleet-wide Emergency Response Support
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide Fleet-wide Emergency Response Support for WSF Vessels. One (1) agreement may be awarded.
…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide Fleet-wide Emergency Response Support for WSF Vessels. One (1) agreement may be awarded.
…
SR 202, Sammamish Creek Fish Passage
Publication date:
Contract number: XE3422
Submittal due:
Installing a new contractor designed split box culvert, excavating and reconstructing the existing roadway, constructing new creek channels, replanting areas affected by construction, erosion control, traffic control and other work. Involves 113 items and 110 working days. Class 1 or 6.
2023 Engineering Geology & Landslide Geotechnical Project Delivery
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide services for senior level engineering geology, soils & landslide related work.
One…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide services for senior level engineering geology, soils & landslide related work.
One…
2023 Cascadia High Speed Rail & I-5 Program Plan
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide General Engineering Consultant support for the Cascadia High Speed Rail and I-5 Program.
…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide General Engineering Consultant support for the Cascadia High Speed Rail and I-5 Program.
…
2024 Transportation Systems Management & Operations (TSMO) Program Plan
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide services. One (1) agreement may be awarded. The agreement will be approximately two (2) years in…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide services. One (1) agreement may be awarded. The agreement will be approximately two (2) years in…
I-5/US-12/SR 507/SR 702 Thurston, Grays Harbor, & Pierce Co – Remove Fish Barriers
Publication date:
Contract number: XE3480
Submittal due:
The Washington State Department of Transportation (WSDOT) plans to replace 20 existing fish barriers within Thurston and Grays Harbor Counties with fish passable structures utilizing a progressive design-build delivery method. The existing fish barriers will be replaced with fish passable…
2023 Transportation Impacts of Lower Snake River Dam Removal
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide transportation analysis and reporting services and a program of inclusive community engagement for the…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide transportation analysis and reporting services and a program of inclusive community engagement for the…
2023 Olympic Region’s Progressive Design Build Program
Publication date:
Submittal due:
Notice - This ad is currently closed.
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide Independent Cost Estimate (ICE) services for a heavy civil Progressive Design-Build (PDB) program…
The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide Independent Cost Estimate (ICE) services for a heavy civil Progressive Design-Build (PDB) program…
Slow down – lives are on the line.
In 2023, speeding continued to be a top reason for work zone crashes.
Even one life lost is too many.
Fatal work zone crashes doubled in 2023 - Washington had 10 fatal work zone crashes on state roads.
It's in EVERYONE’S best interest.
95% of people hurt in work zones are drivers, their passengers or passing pedestrians, not just our road crews.