Southeast Washington Cameras


As of 3/22/2018 1:18 AM
Blocking Incidents
  • RV Dump station will be closed for the season at Sprague Lake Rest Area on I-90 eastbound at milepost 241 beginning at 1:45 pm on November 8, 2017 until further notice.
  • Westbound Schrag Rest Area RV dump station is now closed for the season on I-90 milepost 197.8 beginning at 3:00 pm on November 15, 2017 until further notice.
Construction Closures
  • I-82 milepost 132 Columbia River Bridge: Eastbound traffic is shifted to the westbound Columbia River bridge into Oregon. The speed limit is reduced to 40 mph. Westbound traffic is reduced to a single lane.
  • On SR 282 from downtown Ephrata, east to the Junction with SR 17, expect short delays with flagger controlled traffic where our crew is crack sealing damaged pavement. Work hours are 6 a.m. to 4:30 p.m. Mondays through Thursdays until March 29. Give 'em a Brake.
  • On SR 17 Monday-Friday 6 a.m. to 6 p.m., expect less than 20 minute delays with alternating one-lane flagger/piloted controlled traffic for rumble strip installation from Moses Lake to Soap Lake
  • US-395 milepost 18.5 southbound over the Blue Bridge: Saturday March 24 and Sunday March 25 starting at 8 a.m. to 3 p.m. drivers can expect a single lane closure for bridge cleaning. Monday March 26 through Wednesday March 28 work hours will be 9 a.m. to 3 p.m. The Lewis street on ramp will be closed during the cleaning operations.
  • I-82 westbound milepost 117 to milepost 118: Wednesday March 21 to Thursday March 22 between the hours of 8 a.m. and 3:30 p.m. there will be a right lane closure for guardrail repair.
  • I-82 eastbound milepost 113 to milepost 115: Monday March 19 through Thursday March 22 between the hours of 7 a.m. and 4 p.m. there will be a right lane closure for right of way clean up.
Special Events
  • None reported