-120.9447.33700000Medium Impact
Construction has closed E. South Riverton Avenue between Fiske and Ermina Avenue near Spokane Community College. The closure is part of work happening for the North Spokane Corridor River Crossing project.
]]>
#MediumConstruction-117.363754372,47.677020945
Low Impact
Construction on the Post Street bridge will keep the bridge closed in both directions until further notice.
]]>
#LowConstruction-117.424258251,47.662157442
Low Impact
Construction on SR 270 eastbound from milepost near the Alpine Animal Hospital at milepost 4.5 to near milepost 5.6. One lane will be reduced thru the area for construction on the Bill Chipman-Palouse Trail. Lane reduction will remain in place thru mid-April.
]]>
#LowConstruction-117.144154256,46.72169058
Medium Impact
Construction on Carlisle has the roadway closed between Upriver Drive to Greene Street until further notice as part of the North Spokane Corridor Spokane River Crossing project. Detours possible utilizing Freya Street and Euclid Avenue.
]]>
#MediumConstruction-117.363968058,47.679524972
Lowest Impact
City of Spokane Construction: Post Street Bridge and intersection of Lincoln Street and Summit Boulevard is closed.
]]>
#LowestClosure-117.42508321,47.663394026
High Impact
Exit Closure on I-90 westbound at milepost 284, Thor-Freya Exit 283B. This exit is closed from the 25th of March until approximately the end of May. Use other exits, expect delays.
]]>
#HighExitClosure-117.354004663,47.653966615
Medium Impact
On US 97 Blewett Pass at milepost 151 (north of the jct. US 97/SR 970) Monday through Friday there will be single lane, alternating traffic from 8 a.m. to 5 p.m. No restrictions during non-working hours. Project is scheduled to wrap up March 28, but working days may be extended depending on conditions. Contact: Miguel Castillo, project engineer, 509-667-2860
]]>
#MediumConstruction-120.697322734,47.222701311
High Impact
On SR 17 between milepost 76 and 85 (north of Soap Lake), beginning March 25, Monday through Friday from 8 a.m. to 5 p.m. there will be 20 minute all-stops with single lane alternating traffic, then back to 20 min. all-stop. There is also a 12 ft. width restriction during working hours. Road is open with no restrictions during non-working hours. Contact: Miguel Castillo, project engineer, 509-667-2861
]]>
#HighConstruction-119.483463241,47.391818286
Highest Impact
SR 20 the North Cascades Highway is closed for the season on Thursday, November 30th at 6:00 p.m. The closure points will be milepost 134 at Ross Dam Trailhead on the west side and at milepost 171 at the Silver Star Gate on the east side.
]]>
#HighestClosure-121.063567097,48.726217349
Lowest Impact
The Iron Goat Rest Area located on US 2 at milepost 58.3, approximately six miles west of the Stevens Pass summit, is closed for the winter season.
]]>
#LowestRestArea-121.162760762,47.711148603
Low Impact
The westbound Winchester RV dumping station (including the freshwater pump) is out of service due to mechanical issues. There is no estimated time of reopening.
]]>
#LowRestArea-119.615849652,47.103965767
Medium Impact
The west bound Winchester rest area RV dump , at milepost 161, 14.5 miles west of Moses Lake, is closed due to a maintenance. There is currently no estimated time of reopening.
]]>
#MediumRestArea-119.633332152,47.103932563
High Impact
On I-90 between milepost 161 and 162 (Winchester rest area west of Moses Lake), Thursday (3/28) beginning at 7 a.m., the eastbound off ramp to the rest area will be closed to allow a contractor to replace luminaires above the ramp. Work is scheduled to take appx. 2 hours. After completing work on the eastbound ramp, the contractor will move operations and close the westbound ramp to replace luminaires. Work is weather dependent.
]]>
#HighMaintenance-119.633660662,47.103746538
Medium Impact
The westbound I-90 HOV lane will close between I-405 and 142nd Place Southeast for up to two years starting at 9 p.m. Monday, Feb. 26. The long-term closure of the 142nd Place Southeast HOV on-ramp to westbound I-90 begins at the same time. Signed detours will be available.
]]>
#MediumConstruction-122.178881386,47.580257883
Medium Impact
Up to two lanes of southbound I-405 from Southeast 8th Street to the eastbound I-90 on-ramp will be closed nightly, 8 p.m. Monday, March 25 – 5 a.m. Friday, March 29.
]]>
#MediumConstruction-122.184748094,47.603783527
High Impact
Until further notice - The Ault Field/Hoffman Road Park and Ride on SR 20 is closed for maintenance.
]]>
#HighClosure-122.630381476,48.332616487
High Impact
Flammable cargo is prohibited on SR 520 eastbound & westbound from Montlake Blvd (MP 1) to 84th Ave NE (MP 5).
]]>
#HighFlammableCargoRestriction-122.303082155,47.644373883
Medium Impact
Up to three lanes of northbound I-405 from Coal Creek Parkway (milepost 11.37) to Northeast 6th Street (milepost 13.5) will be closed nightly, 9 p.m. Monday, March 25 – 5 a.m. Friday, March 29.
]]>
#MediumConstruction-122.17685308,47.584298064
Medium Impact
Weekdays from 6 a.m. to 8 p.m. beginning Monday, March 4 to Wednesday, April 24, Earth Work Solutions and Skagit PUD will alternate traffic of State Route 20 near Cascade Road in Marblemount for utility work. The work is expected to end at noon on Fridays.
]]>
#MediumMaintenance-121.454601955,48.52593772
Medium Impact
Nightly construction on I-5 northbound from I-90 interchange (MP 164) to Olive Way (MP 166.2) beginning as early as 11 p.m. on Monday, March 25 until about 5 a.m. on Friday, March 29. The Cherry Street and Olive Way ramps will also be closed.
]]>
#MediumConstruction-122.320113013,47.586715865
Medium Impact
Nightly construction on I-5 northbound from Interurban (MP 156) to Albro (MP 161) beginning at 10 p.m. on Monday, March 25 until about 5 a.m. on Friday, March 29. The Swift, Bailey, Boeing Access Road and SR 900/MLK Jr. Way ramps will be closed.
]]>
#MediumConstruction-122.270179516,47.483672893
Medium Impact
Starting Monday, Jan. 22 on westbound Interstate 90 near 436th Avenue Southeast (milepost 32) and State Route 202 (milepost 31), the right lane will close for maintenance until further notice.
]]>
#MediumMaintenance-121.770346782,47.473606448
Medium Impact
Up to two lanes of southbound I-405 from 112th Avenue Southeast (milepost 10) to Northeast 30th Street (milepost 6.75) will be closed nightly, 10:30 p.m. Wednesday, March 27 – 5:30 a.m. Friday, March 29.
]]>
#MediumConstruction-122.183345348,47.56626349
Medium Impact
Sound Transit crews will close several lanes of northbound I-5 between SR 104 and 220th Street Southwest from 9 p.m. to 5 a.m. nightly Monday, March 25 through the morning of Friday, March 29.
]]>
#MediumConstruction-122.322515152,47.76723661
Medium Impact
Nightly construction on I-5 southbound from. Albro (MP 161) to SR 599 (MP 155) beginning at 10 p.m. on Monday, March 25 until about 5 a.m. on Friday, March 29. The Boeing Access Road and SR 900/MLK Jr. Way ramp will be closed.
]]>
#MediumConstruction-122.308854589,47.546263585
Lowest Impact
Sound Transit contractor crews will close the right lane on eastbound SR 520 between West Lake Sammamish Parkway and SR 202 from 9 p.m. to 6 a.m. nightly Monday, March 25 through the morning of Friday, March 29.
]]>
#LowestConstruction-122.129498217,47.666503277
Medium Impact
Thursday, March 28 to Saturday, March 30: The right general-purpose lane of northbound I-405 from milepost 23 to 24.2 will be closed from 11:59 p.m. – 7 a.m.
]]>
#MediumConstruction-122.186926548,47.748336845
Lowest Impact
Nightly from 9 p.m. to 5 a.m. Sunday night, March 24, to Friday morning, March 29, crews will close the right lane of State Route 9 in Cathcart between 176th Street Southeast, milepost 4, to 180th Street Southeast, milepost 3, for utility work.
]]>
#LowestMaintenance-122.123989423,47.837508734
Medium Impact
Up to two lanes of northbound I-405 from SR 167 (milepost 2.20) to Sunset Boulevard Northeast (milepost 3.66) will be closed overnight, 9 p.m. Thursday, March 28 – 4:30 a.m. Friday, March 29.
]]>
#MediumConstruction-122.220430913,47.467625906
Medium Impact
Up to two lanes of northbound I-405 from SR 167 (milepost 2.20) to Sunset Boulevard Northeast (milepost 5.5) will be closed nightly, 9 p.m. Wednesday, March 27 – 4:30 a.m. Thursday, March 28 and 9 p.m. Friday, March 29 – 4:30 a.m. Sunday, March 31.
]]>
#MediumConstruction-122.220430913,47.467625906
Medium Impact
Starting Sunday, March 17 on eastbound I-90 from East Mercer Way to Bellevue Way Southeast, a temporary lane-shift is in-place with a reduced speed limit to 45 mph due to a failing expansion joint until further notice.
]]>
#MediumMaintenance-122.207390078,47.577869379
Medium Impact
Up to three lanes of northbound I-405 from the northbound I-5 off-ramp (milepost 0.48) to the SR 169 offramp (milepost 3.66) will be closed nightly, 11:30 p.m. Wednesday, March 27 – 4 a.m. Thursday, March 28 and 11:30 p.m. Friday, March 29 – 4 a.m. Sunday, March 31.
]]>
#MediumConstruction-122.255208143,47.461846593
High Impact
SR 542/Mount Baker Highway is closed at the Mount Baker Ski Area (milepost 55) for the season. This section of the road usually reopens early summer after snow removal and roadway repairs are completed.
]]>
#HighClosure-121.681958289,48.861264876
Medium Impact
Sound Transit will close several lanes of southbound I-5 between 220th Street Southwest and SR 104 from 8 p.m. to 5 a.m. nightly Monday, March 25 through the morning of Friday, March 29.
]]>
#MediumConstruction-122.31491795,47.799358071
Medium Impact
Up to three lanes of southbound I-405 from milepost 15.85 to milepost 11.8 will be closed nightly, 9 p.m. Sunday, March 24 – 5 a.m. Friday, March 29.
]]>
#MediumConstruction-122.187135414,47.646664541
High Impact
Northbound I-5 will be reduced to two lanes, 24 hours a day, from 10 p.m. Friday, March 29, to 4 a.m. Monday, April 1, between north Boeing Field and Albro Place for construction.
]]>
#HighConstruction-122.300802225,47.539547279
Medium Impact
Up to two lanes of southbound I-405 from SR 520 (milepost 13.35) to north of I-90 (milepost 10.85) will be closed nightly, 9 p.m. Sunday, March 24 – 5 a.m. Friday, March 29.
]]>
#MediumConstruction-122.188699915,47.610623934
Medium Impact
Sound Transit will close the three right lanes of southbound I-5 between 44th Avenue West and 220th Street Southwest from 8 p.m. to 5 a.m. nightly Wednesday, March 27 through the morning of Friday, March 29. A single lane will close at 8 p.m. each night, with the two adjacent lanes remaining open until 11 p.m. each night. The 44th Avenue West on-ramp to, and the 220th Street Southwest off-ramp from southbound I-5 will also close at 11 p.m. each night.
]]>
#MediumConstruction-122.293779303,47.813360334
Medium Impact
Expect nightly lane and ramp closures on northbound I-5 between SR 516 and S. 188th Street for road construction work. Sunday through Thursday nights, ramps begin closing as early as 7 p.m. and lanes at 8 p.m. All lanes and ramps will be open by 4:30 a.m. on weekdays. On Saturday nights, lanes and ramps may begin closing as early as 6:30 p.m. Lanes will reopen by 9 a.m. on Sunday and ramps by 10:30 a.m.
]]>
#MediumConstruction-122.290688237,47.391451422
Medium Impact
Until further notice – The I-5 Express Lanes will be reduced from four to three lanes between the Ship Canal Bridge and Mercer Street as crews create a work zone for the SR 520/I-5 Express Lanes Connection Project.
]]>
#MediumConstruction-122.326511814,47.603437776
High Impact
Friday, March 29 - A Tim McGraw concert at the Climate Pledge Arena in Seattle will create additional congestion on Interstate 5 and 90, and State Route 99, 509, 513, 520 and 522 from 5 p.m. to 11:55 p.m.
]]>
#HighSpecialEvent-122.343580708,47.624648595
Medium Impact
Thursday, March 28 to Saturday, March 30: The westbound SR 522 on-ramp to northbound I-405 and Northeast 195th Street will be closed nightly from 11:00 p.m. – 5:00 a.m.
]]>
#MediumConstruction-122.184242587,47.75777286
Medium Impact
Thursday, March 28 to Friday, March 29: The left express toll lane and shoulder of northbound I-405 from milepost 24.1 to milepost 27.1 will be closed from 8 p.m. – 4:30 a.m.
]]>
#MediumConstruction-122.185921983,47.763570776
Medium Impact
A single lane will alternate in both directions on SR 164 at milepost 5.5 near SE 376th St beginning at 8:00 pm on March 26, 2024, until about 5:30 am on March 29, 2024, for roadwork.
]]>
#MediumMaintenance-122.142007874,47.264300642
Medium Impact
Until further notice, weekdays from 7 a.m. to 5:30 p.m. construction on SR 20 will alternate traffic near Sauk Store Rd to near Hornbeck Lane. The construction is expected to be completed at noon on Fridays.
]]>
#MediumConstruction-121.651371019,48.504187714
Medium Impact
Monday, Sept. 25 until further notice – The Montlake Boulevard on-ramp to eastbound SR 520 will close for construction between 10 p.m. and 6 a.m. nightly Mondays through Thursdays.
]]>
#MediumConstruction-122.304331216,47.644268948
Medium Impact
Sound Transit contractor crews will close the Northeast 145th Street on-ramp to northbound I-5 at 11 p.m. on Thursday, March 28 and will reopen it at 5 a.m. on Friday, March 29.
]]>
#MediumConstruction-122.324923285,47.734493457
High Impact
Saturday, March 30 - A Monster Jam event at Lumen Field in Seattle will create additional congestion on Interstate 5 and 90, and State Route 99, 509, 513, 520 and 522 from 5 p.m. to 11 p.m.
]]>
#HighSpecialEvent-122.328202407,47.590311673
Medium Impact
Sound Transit will alternate closing the northbound I-5 on-ramps from 220th Street Southwest and 236th Street Southwest from 9 p.m. to 5 a.m. nightly Monday, March 25 through the morning of Friday, March 29.
]]>
#MediumConstruction-122.316118762,47.785017381
Medium Impact
The northbound I-405 off-ramp to SR 169 will be closed nightly, 11 p.m. Monday, March 25 – 4:30 a.m. Sunday, March 31. A signed detour will be in place.
]]>
#MediumConstruction-122.194756948,47.485715682
Medium Impact
The southbound I-405 on-ramp from eastbound SR 520 will be closed nightly, 9 p.m. Sunday, March 24 – 5 a.m. Friday, March 29. A signed detour will be in place.
]]>
#MediumConstruction-122.188119554,47.632358558
Medium Impact
The ramp from northbound SR 527/Bothell Everett Highway to southbound I-90 will close from 10 p.m. Thursday, March 28, to 4 a.m. Friday, March 29, for guardrail work. Please follow the signed detour, using northbound SR 527 to eastbound 220th Street Southeast to northbound 20th Avenue Southeast to southbound SR 527 to the on-ramp to southbound I-405.
]]>
#MediumConstruction-122.21400513,47.795282158
Medium Impact
The southbound I-405 off-ramp to southbound SR 167 will be closed nightly, 11:30 p.m. Monday, March 25 – 4:30 a.m. Friday, March 29. A signed detour will be in place.
]]>
#MediumConstruction-122.219633095,47.467853603
Medium Impact
On SR 104 eastbound at Pine St (MP 25) there is a slow-moving maintenance operation affecting the right lane.
]]>
#MediumMaintenance-122.383261126,47.80383107
Medium Impact
The northbound on-ramp from SR 181/Interurban Avenue (Exit 1) will be closed nightly, 9 p.m. Monday, March 25 – 4:45 a.m. Thursday, March 28 and 9 p.m. Friday, March 29 – 4:45 a.m. Sunday, March 31. A signed detour will be in place.
]]>
#MediumConstruction-122.246881208,47.463319469
Medium Impact
Sound Transit contractor crews will close the northbound I-5 on-ramp to eastbound I-90 from 9 p.m. to 5 a.m. nightly Wednesday, March 27 through the morning of Friday, March 29.
]]>
#MediumConstruction-122.320113013,47.586715865
Medium Impact
Sound Transit contractor crews will close the West Lake Sammamish Parkway on-ramp to eastbound SR 520 from 9 p.m. to 6 a.m. nightly Monday, March 25 through the morning of Friday, March 29.
]]>
#MediumConstruction-122.129498217,47.666503277
Medium Impact
Thursday, March 28 to Saturday, March 30: The northbound I-405 to Northeast 195th Street will be closed nightly from 11:59 p.m. – 7:00 a.m.
]]>
#MediumConstruction-122.189462012,47.769271903
High Impact
Saturday, March 30 - A Kraken hockey game at the Climate Pledge Arena in Seattle will create additional congestion on Interstate 5 and 90, and State Route 99, 509, 513, 520 and 522 from 5 p.m. to 11:55 p.m.
]]>
#HighSpecialEvent-122.343580708,47.624648595
Medium Impact
The southbound I-405 HOV off and on-ramps to and from Northeast Sixth Street will be closed nightly, from 9 p.m. on Sunday, Feb. 25 – 1 a.m. on Friday, March 1. A signed detour will be in place.
]]>
#MediumConstruction-122.18891608,47.615326464
Medium Impact
The southbound I-405 off-ramp to eastbound I-90 will be closed nightly, 11 p.m. Monday, March 25 – 4:30 a.m. Friday, March 29. A signed detour will be in place.
]]>
#MediumConstruction-122.176440196,47.573635611
High Impact
Thursday through Sunday, March 28 to 31 - A Mariners baseball game at The T-Mobile Park in Seattle will create additional congestion on Interstate 5 and 90, and State Route 99, 509, 513, 520 and 522 from 4:30 p.m. to 11:30 p.m. nightly.
]]>
#HighSpecialEvent-122.328202407,47.590311673
Medium Impact
Monday, March 25 to the morning of Saturday, March 30: All lanes of the southbound I-405 off-ramp to Northeast 85th Street will be closed nightly, from 10:00 p.m. – 4:00 a.m.
]]>
#MediumConstruction-122.184684349,47.679470371
Medium Impact
Nightly from 9 p.m. to 5 a.m. Wednesday night, March 27, to Friday morning, March 29, road crews will have a traffic-controlled intersection on State Route 9 in Cathcart at Cathcart Way for roadwork.
]]>
#MediumMaintenance-122.109866576,47.864735984
Medium Impact
Sound Transit contractor crews will close the eastbound SR 520 off-ramp to Northeast 51st Street at 9 p.m. on Thursday, March 28 and will reopen at 6 a.m. on Friday, March 29.
]]>
#MediumConstruction-122.137714867,47.654420058
High Impact
Beginning 7 a.m. Monday, March 4, maintenance crews will close both directions of the Interstate 5 Smokey Point safety rest area and dump station in Arlington for maintenance. No ETA for reopening.
]]>
#HighMaintenance-122.191017135,48.165561585
High Impact
Thursday, March 28 - A Kraken hockey game at the Climate Pledge Arena in Seattle will create additional congestion on Interstate 5 and 90, and State Route 99, 509, 513, 520 and 522 from 5 p.m. to 11:55 p.m.
]]>
#HighSpecialEvent-122.343580708,47.624648595
Medium Impact
Sound Transit will close the northbound I-5 on-ramp to westbound SR 104 from 9 p.m. to 5 a.m. nightly Monday, March 25 through the morning of Friday, March 29.
]]>
#MediumConstruction-122.322515152,47.76723661
Lowest Impact
The northbound I-405 on-ramp from Talbot Road South will be closed nightly, 9 p.m. Monday, March 25 – 4:30 a.m. Sunday, March 31. A signed detour will be in place.
]]>
#LowestConstruction-122.208325906,47.468789988
Medium Impact
The northbound I-405 on-ramp from Tukwila Parkway will be closed nightly, 10 p.m. Monday, March 25 – 5 a.m. Thursday, March 28 and 10 p.m. Friday, March 29 – 5 a.m. Sunday, March 31. A signed detour will be in place.
]]>
#MediumConstruction-122.25833479,47.462588542
Medium Impact
One lane of westbound and eastbound SR 516 near I-5 may be closed nightly for construction work. Sunday nights through Friday mornings, lanes may be closed from 8 p.m. to 5 a.m. On Saturday nights, lanes may be closed from 7:30 p.m. to 5:30 a.m. At least one lane in each direction remains open for travel.
]]>
#MediumConstruction-122.293093688,47.392421825
Medium Impact
From 9 a.m. to 1 p.m. Saturday, March 30, Olympic Pipeline crews will fully close State Route 534 in Conway at Conway Hill Road, milepost 1, for ongoing Olympic Pipeline cleanup. A signed detour will be in place.
]]>
#MediumMaintenance-122.322298529,48.340968871
Medium Impact
The southbound I-405 on- and off-ramps to and from Northeast 6th Street will be closed nightly, 9 p.m. Sunday, March 24 – 5 a.m. Friday, March 29. Signed detours will be in place.
]]>
#MediumConstruction-122.18891608,47.615326464
Medium Impact
Sound Transit will close the northbound I-5 on-ramp from eastbound SR 104 at 9 p.m. on Thursday, March 28 and reopen the ramp at 5 a.m. Friday, March 29.
]]>
#MediumConstruction-122.322515152,47.76723661
High Impact
Until further notice - The Interstate 5 Silver Lake Rest Area is closed for maintenance indefinitely. There is no access for recreational vehicle dumping at this location.
]]>
#HighRestArea-122.210954765,47.907026048
Medium Impact
Thursday, March 28 to the morning of Saturday, March 30: All lanes of the northbound on-ramp from Northeast 85th Street to I-405 will be closed nightly, from 11:00 p.m. – 5:00 a.m.
]]>
#MediumConstruction-122.184379668,47.679488357
Medium Impact
Sound Transit will alternate closing the northbound I-5 on-ramps from 220th Street Southwest and 236th Street Southwest from 9 p.m. to 5 a.m. nightly Monday, March 25 through the morning of Friday, March 29.
]]>
#MediumConstruction-122.314359661,47.799343554
Medium Impact
The southbound I-405 off-ramp and HOV lane to Southeast Eighth Street will be closed nightly, 9 p.m. Sunday, March 24 – 5 a.m. Friday, March 29. A signed detour will be in place.
]]>
#MediumConstruction-122.184748094,47.603783527
Medium Impact
Thursday, March 28 to Saturday, March 30: The westbound SR 522 on-ramp to northbound I-405 and Northeast 195th Street will be closed nightly from11:59 p.m. – 7 a.m.
]]>
#MediumConstruction-122.184242587,47.75777286
Medium Impact
Sound Transit contractor crews will close the Northeast 40th Street on-ramp to eastbound SR 520 at 9 p.m. on Thursday, March 28 and will reopen at 6 a.m. on Friday, March 29.
]]>
#MediumConstruction-122.134801552,47.646025831
Medium Impact
The northbound I-405 on-ramp from the SR 167 HOV lane will be closed nightly, 10:30 p.m. Monday, March 25 – 4:15 a.m. Thursday, March 28 and 10:30 p.m. Friday, March 29 – 4:15 a.m. Sunday, March 31. A signed detour will be in place
]]>
#MediumConstruction-122.219599861,47.467670897
Medium Impact
Monday, March 25 to Friday, March 29: The left express toll lane and shoulder of southbound I-405 from milepost 27.2 to milepost 23.8 will be closed nightly from 8 p.m. – 4:30 a.m.
]]>
#MediumConstruction-122.221909199,47.798612666
Medium Impact
Expect nightly lane and ramp closures on southbound I-5 between S. 188th Street and SR 516 for road construction work. Sunday through Thursday nights, lanes begin closing at 8 p.m. and ramps at 8:30 p.m. Ramps will reopen by 5 a.m. and all lanes by 7 a.m. On Saturday nights, lanes begin closing at 6:30 p.m. and ramps at 9 p.m. Ramps will reopen by 9:30 a.m. Sunday and all lanes by 11 a.m.
]]>
#MediumConstruction-122.271397546,47.43203686
Highest Impact
SR 123 Cayuse Pass is closed for the season due to adverse road and weather conditions. Southbound traffic is closed at milepost 57 on SR 410, Crystal Mountain Blvd, 8 miles north of the summit. Northbound traffic is closed at milepost 2.5, north of the US 12 junction, 14 miles south of the summit.
]]>
#HighestClosure-121.577591043,46.717421199
Medium Impact
Thursday, March 28 to Friday, March 29: The right off-ramp lane and shoulder of southbound I-405 from milepost 27.1 to milepost 26.8 will be closed nightly from 10:30 p.m. – 4 a.m.
]]>
#MediumConstruction-122.220193834,47.797727885
Low Impact
Expect daytime single-lane and shoulder closures along I-90 near the SR 18 interchange and the on- and off-ramps at the interchange between 5 a.m. and 6 p.m. Monday, March 25, through Thursday, March 26, and from 5 a.m. to 11 a.m. Friday, March 22 and 29.
]]>
#LowConstruction-121.897635504,47.506005581
Medium Impact
Monday, Sept. 25, until further notice – A single lane in both directions of SR 520 near the Montlake Lid in Seattle will close for construction between 9 p.m. and 5 a.m. nightly Mondays through Thursdays.
]]>
#MediumConstruction-122.313213219,47.64308269
Medium Impact
Monday, March 25 to Saturday, March 30: The left general-purpose lane of eastbound and westbound SR 522 from milepost 10.7 to milepost 12.05 will be closed nightly from 8 p.m. – 4 a.m.
]]>
#MediumConstruction-122.175589139,47.574378356
Medium Impact
Sound Transit contractor crews will close the eastbound I-90 HOV lane between Judkins Park Station and the Mount Baker Tunnel from 8 p.m. to 5 a.m. nightly Monday, March 25 through the morning of Friday, March 29. It will once again close at 9 p.m. on Saturday, March 30 and will reopen at 5 a.m. on Sunday, March 31.
]]>
#MediumConstruction-122.311095792,47.591433285
Medium Impact
Up to two lanes of northbound I-405 from Sunset Boulevard Northeast (milepost 4.75) to Northeast 30th Street (milepost 6.51) will be closed overnight, 9 p.m. Thursday, March 28 – 5 a.m. Friday, March 29.
]]>
#MediumConstruction-122.191893098,47.493607236
I-5 Mounts Rd to Steilacoom-DuPont Rd Corridor Improvements project page for more details.]]>Medium Impact
Crews are widening I-5 to extend HOV lanes and rebuild the I-5 and Steilacoom-DuPont Road interchange. Drivers will see narrowed and shifted lanes and overnight lane and ramp closures. Visit the I-5 Mounts Rd to Steilacoom-DuPont Rd Corridor Improvements project page for more details.
]]>
#MediumConstruction-122.68394807,47.078963253
SR 167/I-5 to SR 509 New Expressway project. Closures begin as early as 7 p.m. with detours provided for ramp closures. Sunday through Friday, all lanes and ramps reopen by 4:30 a.m. All lanes and ramps must be open by 10 a.m. on Saturdays and 11 a.m. on Sundays.]]>Medium Impact
Expect nighttime northbound I-5 ramp and lane closures near the Fife curve for construction of the SR 167/I-5 to SR 509 New Expressway project. Closures begin as early as 7 p.m. with detours provided for ramp closures. Sunday through Friday, all lanes and ramps reopen by 4:30 a.m. All lanes and ramps must be open by 10 a.m. on Saturdays and 11 a.m. on Sundays.
]]>
#MediumConstruction-122.377181842,47.240534542
fish barrier removal project.]]>Medium Impact
US 12 is reduced to one lane in each direction at Monte-Brady Road near Montesano with both lanes on the eastbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project.
]]>
#MediumConstruction-123.570871717,46.982067911
SR 167/I-5 to SR 509 New Expressway project. Closures begin as early as 7:30 p.m. with detours provided for ramp closures. Sunday through Friday, all lanes and ramps reopen by 6 a.m. All lanes and ramps must be open by 9 a.m. on Saturdays and 10:30 a.m. on Sundays.]]>Medium Impact
Expect nighttime southbound I-5 ramp and lane closures near the Fife curve for construction of the SR 167/I-5 to SR 509 New Expressway project. Closures begin as early as 7:30 p.m. with detours provided for ramp closures. Sunday through Friday, all lanes and ramps reopen by 6 a.m. All lanes and ramps must be open by 9 a.m. on Saturdays and 10:30 a.m. on Sundays.
]]>
#MediumConstruction-122.333206827,47.250366443
Medium Impact
From Monday, March 25 through Friday, April 19, travelers on northbound SR 167 near Sumner will see overnight single-lane closures from the SR 410 interchange to Stewart Road. Crews will close lanes on weeknights from 7 p.m. to 5 a.m. each following day and from 7 p.m. Fridays to 9 a.m. Saturdays.
]]>
#MediumConstruction-122.246820154,47.211561108
fish barrier removal project.]]>Medium Impact
US 12 is reduced to one lane in each direction between South 3rd Street and Schouweiler Road with both lanes on the westbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project.
]]>
#MediumConstruction-123.439327137,46.995549394
fish barrier removal project.]]>Medium Impact
US 12 is reduced to one lane in each direction between Keys Road and Schouweiler Road west of Elma with both lanes on the westbound side of the highway. The speed limit is reduced to 50 mph for a fish barrier removal project.
]]>
#MediumConstruction-123.472071089,46.998948573
fish barrier removal project.]]>Medium Impact
State Route 8 is reduced to one lane in each direction on the westbound side of the highway between the Grays Harbor County line and McCleary. The speed limit is reduced to 50 mph for a fish barrier removal project.
]]>
#MediumConstruction-123.236127078,47.049602263
fish barrier removal project.]]>Medium Impact
State Route 8 is reduced to one lane in each direction on the westbound side of the highway between McCleary and Elma. The speed limit is reduced to 50 mph for a fish barrier removal project.
]]>
#MediumConstruction-123.341267385,47.028588905
High Impact
Road work on SR 509 both directions from milepost 3.3 near Wapato Creek to milepost 7.8 near Pierce/King County Line beginning at 7:06 am on March 28, 2024 until about 4:00 pm.
]]>
#HighRoadwork-122.391888022,47.28152973
Lowest Impact
Crews will be trimming vegetation along the roadway. Expect to see flaggers and one-lane traffic.
]]>
#LowestUtilitiesworktakingplace-124.37004911,48.279636776
Medium Impact
From 7 p.m. Thursday, April 11 to 5 a.m. Friday, April 12 and from 9 p.m. Friday, April 12 to 7 a.m. Saturday, April 13, expect single-lane closures on westbound SR 410 near the SR 162 interchange for guardrail work.
]]>
#MediumConstruction-122.237102105,47.192386985
fish passage project. Travelers can expect overnight single-lane closures on eastbound SR 16 weeknights from 7 p.m. to 6 a.m. Lane closures on westbound SR 16 are allowed weeknights from 8 p.m. to 6 a.m.]]>Medium Impact
The two eastbound SR 16 lanes are shifted towards the median with a reduced speed limit of 45 mph between mileposts 18 and 17.15 for a fish passage project. Travelers can expect overnight single-lane closures on eastbound SR 16 weeknights from 7 p.m. to 6 a.m. Lane closures on westbound SR 16 are allowed weeknights from 8 p.m. to 6 a.m.
]]>
#MediumConstruction-122.616875741,47.390860854
Lowest Impact
Utility Work along SR 509. Crews are trimming trees away from overhead power lines on both sides of the road. Crews will be present Monday through Friday 8:30am to 4:00pm.
]]>
#LowestUtilitiesworktakingplace-122.415791464,47.318096709
Medium Impact
Temporary left turn restrictions are in effect for westbound travelers east of McCleary at Mox Chehalis Road East.
]]>
#MediumConstruction-123.231149151,47.050433216
City of Tumwater Trosper Road Intersection Reconfiguration project.]]>Medium Impact
Travelers can expect intermittent ramp closures at Trosper Road for work on the City of Tumwater Trosper Road Intersection Reconfiguration project.
]]>
#MediumConstruction-122.911997272,47.000067263
Medium Impact
On Monday, March 18 the ramp meter at Bay Street/SB SR 167 on-ramp to southbound I-5 will re-activate. The ramp meters will be in use during peak travel times.
]]>
#MediumConstruction-122.399036914,47.239352542
project webpage.]]>High Impact
Travelers will see shifted lanes and a reduced speed limit through late summer 2024. The work is related to fish barrier removal. Additional information is available on the project webpage.
]]>
#HighConstruction-122.99205056,48.029681586
Medium Impact
The Monte-Brady Road intersection with US 12 is closed at milepost 12.5 near Montesano until late 2025 for fish habitat work. Travelers can still exit the highway in either direction but will not be able to enter the highway or cross it. The Monte-Brady Road intersection at milepost 14.7 in Brady will remain open.
]]>
#MediumConstruction-123.559182437,46.983085427
Highest Impact
Collision on I-5 northbound at milepost 135.54 near Puyallup River Bridge North-End beginning at 7:44 am on March 28, 2024 until further notice. The HOV lane is blocked. The three left lanes are blocked.
]]>
#HighestCollision-122.397071175,47.241021925
project webpage.]]>High Impact
Travelers will see shifted lanes and a reduced speed limit to 30 mph on a portion of US 101. Travelers will see construction through late summer 2024. The work is related to fish barrier removal. Additional information is available on the project webpage.
]]>
#HighConstruction-123.035738215,48.047239491
Medium Impact
On Monday, March 18 the ramp meter at Portland Avenue/27th Street on-ramp to southbound I-5 will re-activate. The ramp meters will be in use during peak travel times.
]]>
#MediumConstruction-122.410350297,47.239224667
High Impact
Road work on SR 110 both directions at milepost 5 near Wilson Rd beginning at 8:09 am on March 28, 2024 until about 3:00 pm.
]]>
#HighRoadwork-124.481355768,47.931064107
Medium Impact
Utility crews will be adding new pedestals for the South Creek Fish Culvert project. Travelers can expect single lane closures and delays.
]]>
#MediumUtilitiesworktakingplace-122.295653829,46.993857498
Medium Impact
One-way alternating traffic on SR 121 near Millersylvania State Park 9 a.m. to 1 p.m. Monday, April 1. Expect intermittent stops while crews make repairs to the roadway.
]]>
#MediumMaintenance-122.907039381,46.914051029
May Creek.]]>Medium Impact
Starting Tuesday, March 12, travelers will see around-the-clock single-lane alternating traffic on US 101 at the Jefferson-Clallam county line. The speed limit is reduced to 25 mph between mileposts 184 and 185. Crews are building a bridge to improve fish passage in May Creek.
]]>
#MediumConstruction-124.35087107,47.879865594
Medium Impact
Both directions between Stafford Ave. and Oakes Ave. in Cle Elum. Monday, Mar 25 through Thursday, Mar 28 from 7 a.m. to 5 p.m. daily, W. 2nd Street (SR-903) will be closed for utility work. Local detours will be in place.
]]>
#MediumUtilitiesworktakingplace-120.940407456,47.195144083
High Impact
Westbound milepost 140 to 136 over the Vantage Bridge: Tuesday, March 26 at 5 a.m. until Friday, March 29 at 9 a.m. there will be a 24-hour single-lane closure with a 10-ft width restriction for bridge work.
]]>
#HighConstruction-119.968019046,46.976790507
Medium Impact
Both directions milepost 11 to 16, 2 miles north of Sunnyside. Monday, March 25 to Friday, March 29 from 7:30 a.m. to 5:30 p.m. daily, there will be one-way flagger-controlled traffic for utility work.
]]>
#MediumUtilitiesworktakingplace-119.979070644,46.356161962
Medium Impact
Both directions between Exit 80 and Exit 82 near Prosser. Until October 2024, traffic will be reduced to a single lane each direction with a 12-ft width restriction for bridge work.
]]>
#MediumConstruction-119.789341718,46.221942079
Medium Impact
SR-241 near Mabton is closed between Wheeler's Smoke-N-Gas (milepost 1) and the Yakima River boat launch (milepost 1.5). Travelers will be detoured to Grandview Pavement, Hornby, Chase, South Euclid and East Euclid roads. The detour will add about 15 minutes to travel time. This section of SR-241 will remain closed until construction on the Mabton bridges is completed in 2025. Wheelers Smoke-N-Gas and the Yakima River boat launch will remain accessible.
]]>
#MediumConstruction-119.999592139,46.225853673
High Impact
SR-410 Chinook Pass is closed for the season due to adverse road and weather conditions. Eastbound traffic is closed at milepost 57, Crystal Mountain Boulevard, 12 miles west of the summit. Westbound traffic is closed at milepost 74.5 Morse Creek, 5 miles east of the summit.
]]>
#HighPassClosure-121.534643131,46.986892186
Medium Impact
Southbound milepost 19 over the Pioneer Memorial Bridge (Blue Bridge) between Pasco and Kennewick. Monday, March 25 through Saturday March 30 from 7 a.m. to 6 p.m. daily, there will be a single lane closure with a speed reduction for bridge painting. Travelers are encouraged to use I-182 or US 397 as alternate routes.
]]>
#MediumConstruction-119.132027612,46.234063416
Medium Impact
Northbound milepost 19 over the Pioneer Memorial Bridge (Blue Bridge) between Pasco and Kennewick. Monday, March 25 through Saturday March 30 from 7 a.m. to 6 p.m. daily, there will be a single lane closure with a speed reduction for bridge painting. Travelers are encouraged to use I-182 or US 397 as alternate routes.
]]>
#MediumConstruction-119.137646026,46.220343197
Low Impact
Both directions milepost 39 in Richland. Monday, March 25 to Friday, March 29 from 7 a.m. to 7 p.m. daily, there will be intermittent lane closures for upgrading of signals and illumination systems.
]]>
#LowMaintenance-119.221459746,46.232375753
Medium Impact
W Dolarway Road to University Way at Exit 106 roundabout near Ellensburg is currently blocked due to a collision. There is no estimated time for the roadway to be cleared.
]]>
#MediumCollision-120.586027721,47.006491102
High Impact
Eastbound milepost 135 to 138 over the Vantage Bridge: Monday, March 25 at 5 a.m. until Friday, March 29 at 9 a.m. there will be a 24-hour single-lane closure with a 10-ft width restriction for bridge work.
]]>
#HighConstruction-120.018604739,46.937747375
Medium Impact
Both directions milepost 44 over the Vernita Bridge. Tuesday, March 26 through Thursday, March 28 from 8 a.m. to 3:30 p.m. daily, there will be one-way flagger-controlled traffic for routine bridge inspection.
]]>
#MediumMaintenance-119.730228338,46.638671161
Medium Impact
The right shoulder is blocked due to maintenance on I-5 southbound from milepost 18 near East Fork Bridge to milepost 16 near Port Of Entry beginning at 7:13 am on March 28, 2024 until further notice. Please use caution
]]>
#MediumMaintenance-122.708402953,45.868842961
Medium Impact
Sunday, March 24 between 3-4 p.m.: Crews will briefly close SR 6 in both directions at milepost 51, near Chehalis River, for a memorial sign unveiling. Following the unveiling, there will be a short procession from milepost 51 to milepost 45, near Spooner Rd. Expect delays.
]]>
#MediumOther-122.984873386,46.658047406
Medium Impact
Traffic is being alternated for construction on SR 4 both directions from milepost 49 near Bunker Hill Road to milepost 50 near Half Bridge beginning at 8:07 am on March 28, 2024 until further notice. Please use caution
]]>
#MediumConstruction-123.150669781,46.193092653
High Impact
Starting Monday, Oct. 2, 2023, and continuing through at least May 2024: The Forest Learning Center Safety Rest Area, located along SR 504 at milepost 33, east of Castle Rock, will close for the season.
]]>
#HighClosure-122.394897384,46.309917921
Highest Impact
Beginning June 15, 2023, until further notice: Both directions of SR 504 at milepost 45.0 are CLOSED at the winter gate, due to a landslide that washed out the road and the Spirit Lake Outlet Bridge, on Sunday, May 14, 2023. There is no estimated time for when the road will reopen and no access beyond the closure. To receive updates on this closure, please sign up for email updates: https://public.govdelivery.com/accounts/WADOT/subscriber/new
]]>
#HighestClosure-122.270285595,46.287135788
High Impact
Beginning Monday, Feb. 27, until further notice: An around-the-clock single-lane closure will be in place along the SR 411/A Street Bridge, for the duration of construction to remove and replace the bridge deck. Note: Travelers should plan for delays of up to 15-minutes when flaggers are present. For everyone's safety, please slow down through the area and watch for road crews. https://wsdot.wa.gov/construction-planning/search-projects/sr-411-cowlitz-river-bridge-replace-bridge-deck
]]>
#HighConstruction-122.914023295,46.274876801
Medium Impact
Traffic is being alternated for maintenance on SR 14 both directions at milepost 55 beginning at 7:12 am on March 28, 2024 until further notice. Please use caution
]]>
#MediumMaintenance-121.68423558,45.705752896
Medium Impact
Traffic is being alternated for maintenance on US 12 both directions at milepost 110 near Kiona Creek beginning at 6:49 am on March 28, 2024 until further notice. Please use caution
]]>
#MediumMaintenance-122.058657528,46.545538685