Vancouver Traffic and Cameras

Vancouver Alerts

As of 10/30/2014 7:44 AM

Blocking Incidents
  • I-5, Southbound, Gee Creek Rest Area Facility Improvements (milepost 12.0)
    Traffic Impacts:
    The southbound I-5 Gee Creek Rest Area is closed from Sept. 8 until Thanksgiving for facility improvements.
Construction Closures
  • Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Monday, Oct. 27 to Friday, Oct. 31: No scheduled traffic impacts.
  • I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Monday, Oct. 27 to Friday, Oct. 31: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation.
  • I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93)
    Friday, Oct. 24 to the morning of Friday, Oct. 31: Drivers should be prepared for occasional, nighttime, intermittent lane and ramp closures on both directions of I-5 between NE 99th and NE 39th Street for paving and striping work nightly from 8 p.m. to 6 a.m.
  • Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Monday, Oct. 27 to Friday, Oct. 31: No scheduled traffic impacts.
  • SR 502 Widening from I-5 to Battle Ground (Mileposts 0.59 to 6.61) Monday, Oct. 27 to Friday, Oct. 31: No scheduled traffic impacts.
Special Events
  • None reported