Planning

In 2013, the Legislature directed WSDOT to study the feasibility of a single account-based system for toll road and ferry users. Specifically the study evaluated:

map showing proposed SR 167 extension from Edgewood to Tacoma.
Proposed SR 167 extension from Edgewood to Tacoma.
A portion of the construction funds needed to replace the SR 520 bridge will come from toll revenue. The Washington State Department of Transportation conducted an investment grade study to determine if enough vehicles will use the bridge once tolling begins to help finance these improvements and pay back construction bonds sold.
Tolling - Awareness and Acceptance of Pricing Project
In 2009, the Legislature directed WSDOT to conduct a feasibility study regarding tolling for the SR 167 Extension project.
In 2009, the Legislature directed WSDOT to conduct a feasibility study regarding tolling for the SR 509 project.