
Building the Deck. For the first bridge, the deck was constructed with pre-formed steel sections. The sections were carried to the bridge on scows, lifted up and attached to the cables. When all the steel sections were riveted into place, the deck was ready to receive its concrete surface.
<-- Back to 1940 Panel
|