State Route Contract Status Contract Number Federal Aid Number Contract Title Contractor Name Bid Amount Region WSDOT Engineer Name Bid Opening Date Awarded Date Execution Date Substantial Completion Date Physical Completion Date Engineer's Estimate Prime Bid Amount Amount Paid to Date Original Working Days Count Authorized Days Count Remaining Working Days Count Contract State Routes Delivery Method RunDate
002 Active 007916 STATE Us 2 Safety Improvements Vetch Construction Inc. $2,932,708.10 NW DAVE CRISMAN 04/14/10 04/28/10 05/18/10 09/02/11 02/13/14 $4,326,328.00 $2,932,708.10 $3,356,336.37 80 99 0 002 Design Bid Build 2014-04-16 05:50:55.323
002 Active 008139 BR-0002(283) Us 2, Tumwater Canyon Bridge Replacements Selland Construction, Inc. $8,485,707.28 NC BOB ROMINE 05/19/11 06/24/11 07/13/11 10/24/13   $8,838,512.74 $8,485,707.28 $9,770,182.56 275 305.5 -69.5 002 Design Bid Build 2014-04-16 05:50:55.323
002 Active 008177 NH-0002(313) Us 2, Rice Road Intersection - Safety Improvements Lakeside/Tri-State Joint Venture $2,170,507.00 NW MARY ANN REDDELL 08/24/11 09/07/11 10/05/11 07/02/12   $2,750,002.00 $2,170,507.00 $2,367,526.50 266 266 0 002 Design Build 2014-04-16 05:50:55.323
002 Active 008229 NH-0002(282) Us 2, Stevens Pass West Slope Stabilization Midwest Rockfall, Inc. $5,291,071.20 NC KEVIN WALIGORSKI 12/22/11 12/29/11 01/20/12     $6,202,171.00 $5,291,071.20 $5,689,917.33 230 230 1 002 Design Bid Build 2014-04-16 05:50:55.323
002 Active 008270 NH-0002(829) Us 2, Stevens Pass Variable Message Signs Colvico, Inc. $1,407,513.00 NC KEVIN WALIGORSKI 04/19/12 04/30/12 05/24/12 07/24/13 10/17/13 $1,396,448.64 $1,407,513.00 $1,504,012.65 45 52 0 002 Design Bid Build 2014-04-16 05:50:55.323
002 Active 008286 NH-0002(311) Us 2, Bickford Ave I/C Safety And Culvert Replacem Granite Construction Company $14,311,311.00 NW MARK SAWYER 05/09/12 06/08/12 06/11/12     $15,490,448.45 $14,311,311.00 $15,684,532.67 300 311 44.5 002 Design Bid Build 2014-04-16 05:50:55.323
002 Active 008306 NH-STPF-9999(597) Sr Us 2/97, Sr 97a, West Of Wenatchee Paving And I Central Washington Asphalt, Inc. $2,891,203.15 NC BOB ROMINE 05/17/12 05/24/12 06/13/12 10/21/12 10/25/13 $2,655,685.10 $2,891,203.15 $2,982,957.09 65 67 0 002, 097, 285 Design Bid Build 2014-04-16 05:50:55.323
002 Active 008385 NH-0002(825) Us 2, E Of Coles Corner Box Culvert Selland Construction, Inc. $644,193.20 NC ROBERT ROMINE 12/06/12 12/11/12 12/31/12 10/15/13   $929,103.00 $644,193.20 $461,150.85 30 30 0 002 Design Bid Build 2014-04-16 05:50:55.323
002 Active 008517 STPUS-0097(162) Us 2/97, Easy St Link Stop Wb Central Washington Asphalt, Inc. $102,985.50 NC KEVIN WALIGORSKI 08/08/13 08/21/13 09/11/13 11/20/13 11/20/13 $88,893.00 $102,985.50 $94,854.40 15 15 1 002 Design Bid Build 2014-04-16 05:50:55.323
002 Active 008535 NH-0002(180) Us 2, Espanola Rd To Jct I-90 - Paving Inland Asphalt Company $5,108,782.97 ER BOB HILMES 11/07/13 11/18/13 12/09/13     $6,305,157.85 $5,108,782.97 $0.00 85 85 85 002 Design Bid Build 2014-04-16 05:50:55.323
002 Active 008557 NH-0002(830) Us 2, Westwood Rd To Pend Oreille Co Line - Paving Spokane Rock Products Inc $1,600,000.00 ER BOB HILMES 12/19/13 12/26/13 01/15/14     $1,959,214.00 $1,600,000.00 $0.00 40 40 40 002 Design Bid Build 2014-04-16 05:50:55.323
002 Active 008566 STPF-NHPP-9999(441) Ncr Seal 2014 Central Washington Asphalt, Inc. $15,496,657.95 ER Not Specified 01/09/14 01/13/14 02/03/14     $15,278,170.40 $15,496,657.95 $1,538,730.69 120 120 95 002, 017, 020, 024, 026, 097, 150, 172, 174 Design Bid Build 2014-04-16 05:50:55.323
002 Active 008587 NHPP-STPF-9999(664) 2014 Eastern Region Chip Seal DW Not Applicable $8,876,791.30 ER Not Specified 03/26/14 03/31/14 04/14/14     $8,723,415.70 $8,876,791.30 $0.00       002, 020, 025, 027, 194, 195, 211 Design Bid Build 2014-04-16 05:50:55.323
003 Active 008463 NH-0101(339) Sr3, Us101 To End Front St - Paving Northwest Asphalt Inc $2,037,908.08 OR SCOTTY IRELAND 05/08/13 05/15/13 06/10/13 11/04/13 11/26/13 $1,993,463.15 $2,037,908.08 $2,051,566.81 78 80 0 003, 101 Design Bid Build 2014-04-16 05:50:55.323
005 Active 007465 NICKEL/LOCAL I-5 Grand Mound-Maytown Stg 1-Add Lanes Scarsella Bros., Inc. $61,494,605.66 OR MCNUTT/ENGEL 03/05/08 03/17/08 04/07/08 08/19/11   $68,294,765.61 $61,494,605.66 $65,904,394.11 530 568 0 005, 012 Design Bid Build 2014-04-16 05:50:55.323
005 Active 007779 ARRA-IM-0053(948) I-5, Port Of Tacoma Road To King County Line - Hov Tri-State Construction, Inc. $31,015,383.05 OR RUMINA SUAFOA 07/08/09 07/13/09 07/23/09 05/31/11 05/02/12 $41,349,337.02 $31,015,383.05 $35,225,458.81 425 405 0 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 007835 STATE I-5, Sr 432, Talley Way Interchange Northwest Construction, Inc. $20,528,756.00 SW LORI FIGONE 12/02/09 12/15/09 01/05/10 11/15/11 09/23/13 $30,928,998.66 $20,528,756.00 $21,291,701.57 400 438.5 0 005, 432 Design Bid Build 2014-04-16 05:50:55.323
005 Active 007903 STATE I-5, Blakeslee Junction Rr Xing To Grand Mound I/C Tri-State Construction, Inc. $19,730,514.90 SW COLIN NEWELL 04/07/10 04/15/10 05/10/10 02/24/12 01/17/14 $28,025,229.50 $19,730,514.90 $22,532,753.96 220 246 0 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 007936 STATE I-5, Sr 161/Sr 18 Interchange Improvements Mowat Construction Company $50,778,922.50 NW ALETA BORSCHOWA 06/09/10 06/21/10 07/08/10 04/12/13   $64,553,797.24 $50,778,922.50 $52,046,273.77 660 660 0 005, 018, 161 Design Bid Build 2014-04-16 05:50:55.323
005 Active 007945 STATE I-5, 196th St (Sr 524) I/C Sb Braided Ramp Northwest Construction, Inc. $18,727,000.00 NW MARK SAWYER 06/23/10 06/28/10 07/15/10 10/09/12   $31,389,404.89 $18,727,000.00 $19,925,248.50 360 362 1 005, 525 Design Bid Build 2014-04-16 05:50:55.323
005 Active 007946 STATE I-5, Portland Ave To Port Of Tacoma Rd - Nb Hov St Scarsella Bros., Inc. $16,392,704.34 OR NEAL UHLMEYER 06/09/10 06/14/10 07/07/10 07/30/12   $22,136,273.50 $16,392,704.34 $16,916,904.26 270 297 3.5 005, 167 Design Bid Build 2014-04-16 05:50:55.323
005 Active 007962 IM-ITS-0055(238) I-5 Downtown Bellingham On/Off Ramps - Ramp Recons Vetch Construction Inc. $4,439,672.03 NW CHRIS DAMITIO 07/14/10 08/18/10 09/07/10 12/19/12 10/22/13 $5,930,296.14 $4,439,672.03 $4,573,071.76 160 171.5 -38 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 007998 NICKEL_FUNDS I-5, Grand Mound To Maytown Stage Two - Replace In Tri-State Construction, Inc. $15,517,831.55 OR ENGEL/NEBERGALL 11/03/10 11/22/10 12/14/10 11/13/12   $22,367,513.91 $15,517,831.55 $16,668,093.67 198 292 0 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008016 IM-0055(242) I-5, Joe Leary Slough To Nulle Rd Vic Paving Desig Granite Construction Company $14,553,000.00 NW PATRICK FULLER 01/14/11 02/04/11 02/18/11 10/31/12 11/09/12 $14,553,000.00 $14,553,000.00 $14,883,420.65 367 367 18 005 Design Build 2014-04-16 05:50:55.323
005 Active 008102 IM-0053(955) I-5, Express Lane Automation Elcon Corporation $3,419,556.00 NW JOHN CHI 03/30/11 04/04/11 04/28/11 06/01/12 03/15/13 $3,419,601.86 $3,419,556.00 $4,781,080.56 200 252 0 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008150 IM-0051(285) I-5, E Fork Lewis River Bridge To Todd Road Vicini Granite Construction Company $4,250,250.00 SW LORI FIGONE 06/15/11 06/27/11 07/12/11 10/18/12 12/19/13 $5,157,579.39 $4,250,250.00 $4,586,963.72 60 74 0 005, 503 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008153 STATE I-5 / I-205, Ne 134th St Interchange (I-5 / I-205) Rotschy, Inc. $19,949,910.16 SW LEON WINGER 06/08/11 06/22/11 07/01/11 02/08/13 04/01/14 $20,598,245.39 $19,949,910.16 $20,553,371.46 175 192 0 005, 205 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008189 STATE I-5 / Sr16, Eastbound Nalley Valley I/C - Hov Mowat Construction Company $74,687,777.28 OR NEAL UHLMEYER 08/31/11 09/22/11 10/13/11     $92,457,289.58 $74,687,777.28 $68,248,895.47 610 640 638 005, 016 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008272 STATE I-5, Mellen Street To Blakeslee Junction - Stage 1 Cascade Bridge, Llc $21,596,149.85 SW COLIN NEWELL 04/25/12 04/30/12 05/21/12 08/23/13   $27,943,652.95 $21,596,149.85 $22,591,353.82 300 325 0 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008311 STATE I-5 / I-205, Ne 134th St. Interchange(I-5/I-205) S Max J. Kuney Company $43,416,928.50 SW LEON WINGER 06/20/12 06/29/12 07/19/12     $51,761,282.71 $43,416,928.50 $35,683,069.27 480 490 93 005, 205 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008314 IM-0053(961) I-5, Military Rd To Ne 117th St Pavement Repair Interstate Improvement, Inc. $5,004,744.22 NW HIEN TRINH 06/06/12 06/11/12 07/03/12 06/30/13 10/14/13 $4,831,928.05 $5,004,744.22 $5,205,079.93 96 100 0 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008352 IM-0053(960) I-5, Spokane Street Interchange Vic Special Bridge Mowat Construction Company $2,400,400.00 NW ALETA BORSCHOWA 08/08/12 08/15/12 09/04/12 05/06/13 05/14/13 $2,562,993.00 $2,400,400.00 $1,947,962.80 120 120 0 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008405 IM0053(940) Sign Replace/Lane Electrical & Express Lane Electr Valley Electric Co. Of Mt Vernon $4,878,672.00 NW HIEN TRINH 01/16/13 01/29/13 02/19/13 02/27/14   $4,611,226.91 $4,878,672.00 $5,045,802.55 170 170 0 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008406 IM0053(968) Sr510-Sr512 Its Fiber Improvements I-5 Magnum Power Llc 6902 Ne 219th St, Battl $1,104,454.09 OR KIM MUELLER 01/24/13 02/04/13 02/25/13 12/16/13 03/18/14 $1,339,355.00 $1,104,454.09 $1,099,818.68 85 89 0 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008414 BH-0053(962) I-5, Seattle Area Bridges Phase 1 Deck Rehab And E Mowat Construction Company $3,950,268.66 NW ALETA BORSCHOWA 03/13/13 03/26/13 04/15/13 10/06/13 10/06/13 $3,513,199.50 $3,950,268.66 $3,877,399.05 120 120 37 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008435 BH-0053(969) I-5, Nisqually River Bridges Bridge Painting Intech Contracting Llc $4,993,368.87 OR KIM MUELLER 03/20/13 04/04/13 04/25/13     $5,789,274.00 $4,993,368.87 $4,606,559.76 230 230 16 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008439 IM-0053(063) Sr 104 To 52nd/220th Sw Paving I-5/220th St Sw I/C Granite Construction Company $3,624,239.33 NW MARK SAWYER 03/27/13 04/01/13 04/22/13     $3,352,800.00 $3,624,239.33 $3,092,882.59 77 80 5 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008460 NHPP-0053(966) I-5 M St & I-705 Overcrossings Seismic Retrofit Quigg Bros. Inc. $3,237,136.00 OR KIM MUELLER 05/01/13 05/09/13 05/30/13 03/24/14 03/25/14 $3,201,760.54 $3,237,136.00 $2,621,367.72 160 174 4 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008462 NHPP-2051(283) I-205 / I-5, Sr 14 To I-5 Merge Concrete Rehabilit Penhall Company $2,240,474.35 SW CHRIS TAMS 04/17/13 04/24/13 05/14/13 09/20/13 10/15/13 $2,288,046.30 $2,240,474.35 $2,010,376.00 50 54 -2 005, 205 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008471 STATE I-5, Squalicum Creek Channel Fish Passage Razz Construction, Inc. $947,436.00 NW CHRIS DAMITIO 05/15/13 05/20/13 06/10/13 01/30/14   $1,061,197.00 $947,436.00 $884,680.67 60 60 -77.5 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008473 STATE I-5, Mellen Street To Blakeslee Junction - Stage 2 Scarsella Bros., Inc. $48,221,444.44 SW COLIN NEWELL 06/19/13 06/24/13 07/16/13     $56,786,330.20 $48,221,444.44 $15,639,329.22 875 875 640.5 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008482 NHPP0051(290,291) I-5, Nb & Sb, Ne 179th St To North Fork Lewis Rive Kerr Contractors Oregon Inc $4,468,700.00 SW LEON WINGER 05/30/13 06/04/13 06/24/13 10/16/13   $4,914,473.20 $4,468,700.00 $4,329,614.22 45 54 0 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008487 NHPP-0052(207)IM- I-5, Carpenter Rd Vic Stormwater Retrofit Nova Contracting, Inc. $218,978.00 OR STEVE FUCHS 06/05/13 06/11/13 07/01/13 09/27/13   $264,648.00 $218,978.00 $173,344.50 20 20 -3.5 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008489 STATE I-5, Chamber Way Bridge Special Repair Olivas Valdez Inc. $408,303.00 SW CHRIS TAMS 06/05/13 06/11/13 07/11/13 11/15/13 11/20/13 $413,689.70 $408,303.00 $582,009.02 40 53 -3 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008491 STATE I-5, M St To Portland Ave Vault Removal Mid-Mountain Contractors, Inc. $1,693,757.00 OR JON DEFFENBACHER 06/12/13 06/24/13 07/15/13 10/31/13 11/11/13 $2,782,001.07 $1,693,757.00 $1,663,136.73 56 58 2 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008499 NHPP-0051(289/288 I-5, N Fork Lewis River Bridge Nb And Sb Painting Geronimo Painting Company $11,981,648.40 SW LORI FIGONE 07/03/13 07/12/13 08/01/13     $13,400,242.75 $11,981,648.40 $4,266,847.84 462 462 340.5 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008500 ER-1303(001) I-5, Skagit River Bridge Permanent Bridge Replacem Max J. Kuney Company $6,875,800.00 NW PATRICK FULLER 06/18/13 06/18/13 06/19/13 09/15/13 12/13/13 $5,440,979.00 $6,875,800.00 $6,851,940.00 78 86 1 005 Design Build 2014-04-16 05:50:55.323
005 Active 008501 IM-0053(968) I-5, Sr 510 To Sr 512 Congestion Management Granite Construction Company $9,823,887.57 OR KIM MUELLER 07/10/13 07/16/13 08/05/13     $11,042,255.80 $9,823,887.57 $4,560,418.26 301 311 158 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008503 STATE I-5, Sb S 320th St Vicinity Noise Wall Replacement Massana Construction, Inc. $201,147.00 NW Not Specified 06/26/13 07/01/13 07/24/13 12/20/13 12/20/13 $320,369.53 $201,147.00 $168,363.50 50 50 15 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008508 IM-0053(960),BH(962) I-5, Seattle Area Bridges - Phase 2 Expansion Join Pcl Civil Constructors Inc $2,160,423.83 NW ALETA BORSCHOWA 07/24/13 08/09/13 09/08/13     $2,864,177.00 $2,160,423.83 $1,230,628.86 160 160 71.5 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008518 STPF-ER-1303(001) I-5, Skagit River Bridge Bridge Elements Repair Pcl Civil Constructors Inc $2,739,075.00 NW DAVE CRISMAN 08/07/13 08/07/13 08/23/13     $2,937,025.00 $2,739,075.00 $2,435,989.01 50 50 7.5 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008544 IM-0053(968) I-5, Sr 510 To Sr 512 Its And Ramp Revisions Tucci & Sons, Inc. $2,322,690.40 OR KIM MUELLER 11/20/13 12/04/13 12/24/13     $2,307,033.50 $2,322,690.40 $0.00 54 54 54 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008559 BH-0053(967) I-5, S 272nd St Vic To S Rose St Seismic Retrofit Quigg Bros. Inc. $8,504,188.00 NW Not Specified 12/18/13 01/03/14 01/23/14     $9,120,770.50 $8,504,188.00 $0.00 445 0 0 005 Design Bid Build 2014-04-16 05:50:55.323
005 Active 008565 BH-0053(695) I-5, Sr 18 I/C To S 288th St Seismic Retrofit Ceccanti Inc $4,644,837.00 NW Not Specified 12/18/13 12/26/13 01/15/14     $4,914,294.50 $4,644,837.00 $0.00 215 215 200 005 Design Bid Build 2014-04-16 05:50:55.323
006 Active 008464 STATE Sr6, Willapa River Bridge - Replace Bridge Rotschy, Inc. $4,077,489.75 SW COLIN NEWELL 04/24/13 04/29/13 05/20/13     $4,620,715.88 $4,077,489.75 $2,937,560.51 240 240 54 006 Design Bid Build 2014-04-16 05:50:55.323
006 Active 008572 STPF-0006(021) Sr 6, Rock Creek Bridges - Replace Bridges 6/102 & Scarsella Bros., Inc. $11,612,612.12 SW COLIN NEWELL 01/29/14 02/03/14 02/25/14     $11,692,592.95 $11,612,612.12 $0.00 360 360 342 006 Design Bid Build 2014-04-16 05:50:55.323
007 Active 008444 STATE Sr 7, Muck Cr Trib To Nisqually River - Fish Barri Active Construction Inc. $1,125,102.00 OR STEVE FUCHS 04/03/13 04/18/13 05/13/13 10/22/13 10/24/13 $999,411.90 $1,125,102.00 $1,094,659.56 60 60 -8.5 007 Design Bid Build 2014-04-16 05:50:55.323
009 Active 007920 STATE Sr 9, Lundeen Parkway To Sr 92 Intersection Improv Granite Construction Company $10,921,000.00 NW DAVE CRISMAN 05/05/10 05/17/10 06/10/10 10/28/11   $16,571,849.37 $10,921,000.00 $12,030,846.15 180 207 9.5 009, 092 Design Bid Build 2014-04-16 05:50:55.323
009 Active 008140 STATE Sr 9, 212th St Se To 176th St Se Stage 3 Widening Northwest Construction, Inc. $24,297,000.00 NW JOHN CHI 06/08/11 06/23/11 07/12/11     $32,543,138.80 $24,297,000.00 $19,857,766.63 505 505 36 009 Design Bid Build 2014-04-16 05:50:55.323
009 Active 008184 STATE Sr 9, 212th St Se To 176th St Se Stage 3 Wetland M Tri-State Construction, Inc. $1,252,399.90 NW JOHN CHI 07/07/11 07/14/11 08/05/11 11/16/12 11/20/13 $2,190,755.50 $1,252,399.90 $1,099,152.61 125 125 0 009 Design Bid Build 2014-04-16 05:50:55.323
009 Active 008216 STATE Sr 9 / Sr 92 Intersection Improvements Design Buil Guy F. Atkinson Construction, Llc $3,346,888.00 NW SEEMA JAVERI 01/19/12 01/26/12 02/15/12 08/20/12   $3,919,498.49 $3,346,888.00 $3,494,226.18 237 237 0 009, 092 Design Build 2014-04-16 05:50:55.323
009 Active 008222 STATE Sr 9/Sr 531, 172nd St Ne & Eaglefield Dr Intersect Interwest Construction Inc $4,995,958.40 NW HAMMER/SPAHR 11/09/11 11/18/11 12/08/11 01/24/13   $5,637,723.50 $4,995,958.40 $4,527,225.17 93 101 0 009, 531 Design Bid Build 2014-04-16 05:50:55.323
009 Active 008268 STATE Sr 9, 176th St Se Vic To Sr 96 Paving Cemex Construction Materials    Pacific $2,508,376.28 NW JOHN CHI 04/18/12 04/23/12 05/14/12 06/06/13 11/18/13 $2,667,995.00 $2,508,376.28 $2,320,156.41 91 91 0 009 Design Bid Build 2014-04-16 05:50:55.323
009 Active 008363 STATE Sr 9, Pilchuck Creek Replace Bridge Granite Construction Company $8,891,323.69 NW DAVE CRISMAN 09/19/12 10/09/12 10/29/12     $12,204,445.60 $8,891,323.69 $6,654,065.80 270 255 64 009 Design Bid Build 2014-04-16 05:50:55.323
009 Active 008397 STPF0009(067) Sr 9, Np Creek Fish Passage Barrier Removal Stremler Gravel Inc 250 Bay-Lyn Drive 98 $351,486.00 NW SHANE SPAHR 01/09/13 01/14/13 02/05/13 09/26/13 03/07/14 $521,000.00 $351,486.00 $354,702.50 19 19 -0.5 009 Design Bid Build 2014-04-16 05:50:55.323
009 Active 008504 BH-0009(059) Sr 9, Getchell Road Bridge Seismic Razz Construction, Inc. $116,157.57 NW JOHN CHI 06/26/13 07/12/13 08/01/13     $184,833.00 $116,157.57 $94,127.69 60 60 -10 009 Design Bid Build 2014-04-16 05:50:55.323
009 Active 008560 HSIP-0009(068) Sr 9, 32nd St Se & 84th St Ne Safety Improvements Rodarte Construction, Inc. $5,699,005.00 NW Not Specified 02/13/14 02/26/14 03/18/14     $5,021,873.00 $5,699,005.00 $0.00 295 295 278 009 Design Build 2014-04-16 05:50:55.323
011 Active 008436 STPF-0011(039) Sr 11, Padden Creek Fish Barrier Removal Ram Construction Gen Contractors $1,761,155.40 NW SHANE SPAHR 03/27/13 04/01/13 04/22/13     $1,668,097.90 $1,761,155.40 $1,720,769.17 120 138 -24 011 Design Bid Build 2014-04-16 05:50:55.323
012 Active 008266 NH-0012(208) Us12 Stabilize Slopes Clear Creek Vic Ais Construction Company $1,951,774.31 SC BILL PRESTON 04/11/12 05/11/12 06/06/12 06/27/13 06/27/13 $1,832,141.00 $1,951,774.31 $1,521,136.22 85 85 2 012 Design Bid Build 2014-04-16 05:50:55.323
012 Active 008449 NHPP/STPF-9999(434) Us 12 Et Al, 2013 Scr Region-Wide Chip Seal Granite Construction Company $5,644,683.25 SC MOE DAVARI 04/24/13 06/04/13 06/24/13 10/28/13 11/01/13 $5,515,088.50 $5,644,683.25 $5,821,632.46 77 77 1 012, 017, 024, 097, 124, 223 Design Bid Build 2014-04-16 05:50:55.323
012 Active 008553 NHPP-STPF-9999(607) Us 12 Et Al, 2014 Scr Region Wide Chip Seal Poe Asphalt Paving, Inc. $5,785,946.58 SC Not Specified 12/18/13 12/23/13 01/13/14     $6,215,660.50 $5,785,946.58 $0.00 65 0 0 012, 022, 024, 082, 128, 193, 224, 241, 397 Design Bid Build 2014-04-16 05:50:55.323
014 Active 008105 STATE Sr 14, Camas / Washougal - Add Lanes And Build Int Tapani Underground, Inc. $28,618,803.65 SW CHRIS TAMS 04/13/11 04/18/11 05/11/11     $34,500,833.10 $28,618,803.65 $28,860,510.75 360 379 0 014, 500 Design Bid Build 2014-04-16 05:50:55.323
014 Active 008328 NH-HSIP-0014(040) Sr 14, Marble Rd Vic Safety Improvements Nutter Underground Utilities, Inc. $3,835,534.22 SW CHRIS TAMS 06/27/12 07/18/12 07/31/12 01/23/14   $3,844,523.35 $3,835,534.22 $4,275,465.11 70 70 0 014 Design Bid Build 2014-04-16 05:50:55.323
016 Active 008323 STATE Sr 16 / I-5, Two Year Plant Establishment Terra Dynamics, Inc $300,223.00 OR KIM MUELLER 05/25/12 05/29/12 06/18/12     $287,589.00 $300,223.00 $256,684.67 60 0 0 005, 016 Design Bid Build 2014-04-16 05:50:55.323
017 Active 008525 STATE Sr 17, Moses Lake Noise Barrier Wall Drainage Upda Krci Llc $158,343.50 NC ROBERT ROMINE 09/05/13 09/10/13 09/30/13 11/15/13 11/15/13 $129,571.00 $158,343.50 $205,388.74 15 20 4 017 Design Bid Build 2014-04-16 05:50:55.323
018 Active 008445 NH-0018(039) Sr 18, Eb Carey Creek Tributary To Issaquah-Hobart Watson Asphalt Paving Co.(Dba_E.M.I.) $1,169,961.60 NW HIEN TRINH 04/03/13 04/10/13 05/01/13 08/09/13   $1,459,751.00 $1,169,961.60 $1,024,662.40 35 35 0 018 Design Bid Build 2014-04-16 05:50:55.323
018 Active 008457 BH/NH-0018(038-03 Sr18/Sr99 Vic To Green River Bridge Paving And Bri Tucci & Sons, Inc. $1,813,430.00 NW ALETA BORSCHOWA 04/24/13 04/30/13 05/20/13 11/19/13   $1,938,488.00 $1,813,430.00 $1,840,390.07 50 60 0 018 Design Bid Build 2014-04-16 05:50:55.323
018 Active 008584 STATE Sr 18, Taylor Creek Scour Protection Matia Contractors, Inc. $138,989.70 NW Not Specified 03/05/14 03/10/14 04/01/14     $221,734.00 $138,989.70 $0.00 30 0 0 018 Design Bid Build 2014-04-16 05:50:55.323
020 Active 008423 ER-0701(006) Sr 20, Skagit River - Ced Permanent Restoration Trimaxx Construction $5,164,771.35 NW SHANE SPAHR 04/03/13 04/10/13 05/01/13     $7,817,502.10 $5,164,771.35 $4,463,299.50 135 135 46 020 Design Bid Build 2014-04-16 05:50:55.323
020 Active 008533 FBD-2013(071) Sr 20 Spur, Lopez Island Ferry Terminal Upland Ada Matia Contractors, Inc. $318,984.90 WSF JOHN CALLAHAN 10/09/13 10/14/13 11/12/13     $369,098.04 $318,984.90 $79,664.53 60 60 35 020 Marine Terminal 2014-04-16 05:50:55.323
021 Active 008342 STATE South Nanamkin Creek Culvert Replacement West Company, Inc. $597,957.50 ER BOB HILMES 07/26/12 07/31/12 08/20/12 10/01/13 10/01/13 $685,982.70 $597,957.50 $573,139.90 30 30 0.5 021 Design Bid Build 2014-04-16 05:50:55.323
021 Active 008402 FBD0021(022) Keller Ferry Terminal Rehab Terminal Rehabilitatio Max J. Kuney Company $1,930,000.00 ER BOB HILMES 01/24/13 01/31/13 02/20/13 08/13/13   $1,885,624.00 $1,930,000.00 $1,995,900.55 60 63 3 021 Marine Terminal 2014-04-16 05:50:55.323
021 Active 008447 CBI-0021(021) Sr 21, 1.1 Miles North Of Rin Con Creek Road To Ca Central Washington Asphalt, Inc. $2,087,572.03 ER CHAD SIMONSON 04/18/13 05/06/13 05/30/13 09/12/13   $1,990,205.43 $2,087,572.03 $1,897,488.34 30 32 0 021 Design Bid Build 2014-04-16 05:50:55.323
024 Active 008375 BH-0024(018) Sr 24, S Of Othello Sagehill Wasteway Deck Repair Penhall Company $312,822.50 NC KEVIN WALIGORSKI 10/11/12 10/16/12 11/28/12 05/08/13 05/08/13 $235,544.00 $312,822.50 $326,456.51 20 20 2 024 Design Bid Build 2014-04-16 05:50:55.323
026 Active 008415 HSIP0026(026) Sr26 Othello @1st St Ph 2 Phase 2 Granite Construction Company $1,043,493.44 NC ROBERT ROMINE 02/21/13 02/25/13 03/18/13 06/07/13 10/28/13 $1,107,984.40 $1,043,493.44 $1,069,231.27 35 35 0 026 Design Bid Build 2014-04-16 05:50:55.323
027 Active 008446 STPF-0027(014) Sr27 32nd Ave To Jct Sr 290 Pave R Morse Bros., Inc. $1,880,924.90 ER CHAD SIMONSON 04/11/13 04/25/13 05/21/13 09/20/13   $2,005,257.85 $1,880,924.90 $1,695,876.60 55 57 -2 027 Design Bid Build 2014-04-16 05:50:55.323
028 Active 008166 NH0028(045) Sr 28, E. End Of The George Sellar Br. Construct B Klb Construction Inc. $16,363,377.90 NC KEVIN WALIGORSKI 06/23/11 07/08/11 07/19/11 08/02/13   $15,772,791.07 $16,363,377.90 $16,696,994.12 270 310 1 028, 285 Design Bid Build 2014-04-16 05:50:55.323
031 Active 008453 DEMO-0031(029) Sr31, Pend Orielle County Pedestrian Improvements Morse Bros., Inc. $569,663.50 ER BOB HILMES 04/18/13 05/09/13 05/30/13 11/21/13   $559,062.00 $569,663.50 $611,954.82 25 25 3 031 Design Bid Build 2014-04-16 05:50:55.323
082 Active 008399 NH0832(093) Us12 To Valley Mall Vic Paving Paving Columbia Asphalt & Gravel, Inc. $2,671,716.65 SC BILL PRESTON 01/16/13 01/22/13 02/13/13 10/14/13 11/08/13 $3,039,628.50 $2,671,716.65 $2,837,014.82 51 57 -3 082 Design Bid Build 2014-04-16 05:50:55.323
090 Active 007852 STATE I-90, Hyak To Snowshed Vicinity Phase 1b- Add Lane Max J. Kuney Company $76,699,232.66 SC WILL SMITH 01/21/10 01/27/10 02/08/10 11/04/13 11/04/13 $110,365,251.05 $76,699,232.66 $90,004,399.01 519 565.5 82.5 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 007862 NH-0906(210) I-90 Spokane Poe Weigh Station Relocation Selland Construction, Inc. $6,704,332.55 ER CHAD SIMONSON 02/04/10 02/17/10 03/05/10 11/07/11 12/20/11 $10,333,570.25 $6,704,332.55 $6,826,569.99 325 327 1 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 007971 ARRA/IM-0902(315) I-90, Lake Easton Vic To Big Creek Br Vic Eb - Rep Icon Materials,A Division Of Cpm Corp. $14,807,102.55 SC JEFF MINNICK 07/28/10 07/30/10 08/18/10 07/17/13 07/17/13 $16,361,717.55 $14,807,102.55 $15,694,068.11 260 261 0 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008022 NH-0906(226) I-90 Sullivan Rd To Barker Rd Additional Lanes Add Acme Concrete Paving, Inc. $14,949,578.24 ER DARREL MCCALLUM 11/10/10 12/13/10 12/22/10 06/11/12   $17,891,733.30 $14,949,578.24 $15,877,333.51 150 154.5 -26.5 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008127 STATE I-90, Snowshed To Keechelus Dam Phase 1c - Replace Guy F. Atkinson Construction, Llc $177,144,342.66 SC WILL SMITH 07/27/11 08/19/11 08/19/11     $197,988,768.70 $177,144,342.66 $63,303,277.55 750 908 630 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008223 NH-0901(466) I-90, East Fork Issaquah Creek Fish Passage Tri-State Construction, Inc. $1,451,881.70 NW HIEN TRINH 11/02/11 11/07/11 11/28/11 11/21/12 01/09/14 $1,542,787.00 $1,451,881.70 $1,985,276.81 110 110 -4.5 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008258 BH-0901(481) I-90 / Sr 18 Interchange Wb Bridge Bridge Deck Reh C.A. Carey Corporation $459,481.50 NW HIEN TRINH 03/28/12 04/04/12 04/24/12 06/30/12 07/06/12 $510,006.00 $459,481.50 $432,752.38 25 25 0 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008329 CM0906(219) I90 Vic Idaho Rd-State Line Its Colvico, Inc. $530,434.00 ER DARREL MCCALLUM 06/28/12 07/09/12 08/06/12 10/15/13 10/15/13 $478,979.00 $530,434.00 $495,045.88 66 68 6 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008394 CM9999(639) Variable Message Signs Replacement Replacement - I Colvico, Inc. $790,104.00 ER BOB HILMES 12/13/12 12/20/12 01/11/13 07/17/13   $758,604.00 $790,104.00 $777,112.00 60 60 0 002, 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008400 IM-HSIP-9999(442) Sr 92 / I-90, Intersection Improvements & Regionwi Graham-Marshbank Jv $7,131,691.00 NW MARY ANN REDDELL 03/13/13 03/20/13 04/16/13     $7,237,987.00 $7,131,691.00 $6,911,120.82 203 203 0 005, 090 Design Build 2014-04-16 05:50:55.323
090 Active 008419 BH-0902(435) I-90, Easton To Ellensburg Vic Wb And Eb Bridges - Penhall Company $3,526,488.99 SC JEFF MINNICK 02/27/13 03/13/13 04/19/13 12/17/13 12/17/13 $3,716,703.29 $3,526,488.99 $3,617,230.45 97 97 6 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008443 IM-0902(445) I-90, Mp 65.54 To Easton Hill Eb & Wb - Paving Granite Construction Company $5,359,359.00 SC JEFF MINNICK 04/10/13 04/25/13 05/17/13     $4,875,452.55 $5,359,359.00 $5,030,481.17 61 68 2 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008492 NHPP-0902(443) I-90, Oakes Ave, Thorp Rd, Indian John Hill Eb/Wb Northeast Electric, Llc $995,364.09 SC JEFF MINNICK 06/19/13 06/24/13 07/16/13     $1,205,638.00 $995,364.09 $16,385.12 60 40 15 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008495 STP-0906(231) I-90, Liberty Lake Roundabout Wm. Winkler Company $1,217,332.08 ER DARREL MCCALLUM 06/27/13 07/11/13 07/31/13 10/24/13   $1,105,642.90 $1,217,332.08 $1,288,617.90 45 45 1.5 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008538 NHPP-0904(122) I-90, Grant Co Line To Sr 21 - Paving Central Washington Asphalt, Inc. $4,815,095.70 ER DARREL MCCALLUM 11/20/13 12/03/13 12/23/13     $6,401,071.50 $4,815,095.70 $0.00 50 0 0 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008540 NHPP-0905(103) I-90, Lincoln Co Line To Salnave Rd - Paving Inland Asphalt Company $3,687,413.40 ER DARREL MCCALLUM 11/14/13 11/21/13 12/12/13     $5,510,043.75 $3,687,413.40 $0.00 50 0 0 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008542 BH-0901(270) I-90, Wb East Channel Bridge Expansion Joint Repla Mowat Construction Company $1,153,044.74 NW Not Specified 11/06/13 11/12/13 12/05/13     $1,082,496.64 $1,153,044.74 $0.00 20 0 0 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008547 IM0902(445)STPF(447) I-90, Price Creek Vicinity To Mp 65.54 - Paving Columbia Asphalt & Gravel, Inc. $5,944,899.20 SC JEFF MINNICK 11/20/13 11/26/13 12/18/13     $5,918,056.00 $5,944,899.20 $0.00 50 50 50 090   2014-04-16 05:50:55.323
090 Active 008558 STPF-DEMO-0902(398) I-90, Snoq. Pass Vic - Pccp Rehab Eb/Stormwater Re DW Error Record $6,425,000.00 SC Not Specified 01/15/14 01/21/14 02/10/14     $6,351,766.60 $6,425,000.00 $0.00 80 80 80 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008564 IM-0906(230) I-90, Vicinity Liberty Park To Havana St - Illumin Colvico, Inc. $1,105,094.00 ER BOB HILMES 12/19/13 12/26/13 01/15/14     $1,085,322.00 $1,105,094.00 $0.00 70 0 0 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008568 NHPP-0903(073) I-90, W Of George - Paving Central Washington Asphalt, Inc. $2,872,536.80 NC KEVIN WALIGORSKI 12/09/13 01/21/14 02/10/14     $3,299,412.90 $2,872,536.80 $0.00 55 55 41 090 Design Bid Build 2014-04-16 05:50:55.323
090 Active 008569 STATE Two-Way Transit & Hov Operations Stage 3a 2 Eb Bel DW Not Applicable $7,399,235.00 NW Not Specified 02/20/14 03/12/14 04/01/14     $7,641,718.60 $7,399,235.00 $0.00       090 Design Bid Build 2014-04-16 05:50:55.323
097 Active 008244 BR-NH-0097(084) Us 97, Satus Creek Vicinity - Replace Br. 97/106 A William Charles Construction, Llc $8,830,731.60 SC MOE DAVARI 02/08/12 02/13/12 03/05/12 11/15/13   $8,788,576.51 $8,830,731.60 $8,899,220.98 177 184.5 3 097 Design Bid Build 2014-04-16 05:50:55.323
097 Active 008293 STATE Us 97, North Of Goldendale, Wildlife Habitat Conne Rotschy, Inc. $2,113,354.68 SW CHRIS TAMS 05/16/12 05/21/12 06/11/12 03/20/14   $2,106,341.00 $2,113,354.68 $2,262,514.18 145 158 0 097 Design Bid Build 2014-04-16 05:50:55.323
097 Active 008392 NH-HSIP-0097(160) Us 97, N Of Daroga State Park Turn Lanes Selland Construction, Inc. $227,055.00 NC ROBERT ROMINE 11/29/12 12/10/12 12/31/12 07/11/13 10/23/13 $289,101.50 $227,055.00 $218,770.00 25 25 0 097 Design Bid Build 2014-04-16 05:50:55.323
097 Active 008409 CBI0097(155) N Ov Riverside Nb Passing Lane Nb Passing Lane Selland Construction, Inc. $829,108.19 NC KEVIN WALIGORSKI 01/10/13 01/14/13 02/04/13 06/10/13 11/04/13 $957,729.80 $829,108.19 $809,455.27 35 37 0 097 Design Bid Build 2014-04-16 05:50:55.323
097 Active 008424 CBI0097158 Us97 N Of Brewster Passing Lane Passing Lane Granite Construction Company $979,499.91 NC KEVIN WALIGORSKI 03/07/13 03/13/13 04/02/13 09/13/13 12/18/13 $1,105,122.35 $979,499.91 $1,021,001.87 35 40 0 097 Design Bid Build 2014-04-16 05:50:55.323
097 Active 008450 NHPP-0097(135) Us97 I-90 Br To Desmond Rd Paving Granite Construction Company $700,800.00 SC JEFF MINNICK 05/01/13 05/06/13 05/28/13 10/17/13 10/23/13 $753,672.00 $700,800.00 $614,464.55 20 20 4 097 Design Bid Build 2014-04-16 05:50:55.323
097 Active 008458 CBI-0097(157) Us 97, Cameron Lake Rd Intersection Improvements Granite Construction Company $889,550.32 NC KEVIN WALIGORSKI 04/25/13 04/30/13 05/20/13 12/18/13   $903,909.05 $889,550.32 $873,827.90 35 40 0 097 Design Bid Build 2014-04-16 05:50:55.323
097 Active 008510 STPF-ER-0902(431) Us 97, Dry Creek W Of Ellensburg - Construct Bridg Apollo, Inc. $1,436,900.00 SC JEFF MINNICK 07/31/13 08/06/13 08/26/13     $1,431,114.00 $1,436,900.00 $897,006.25 120 120 11.5 097 Design Bid Build 2014-04-16 05:50:55.323
097 Active 008570 STPU-0097(164) Us97a & Sr150, Traffic Signal And Channelization U Neppel Electrical & Controls Llc $188,226.10 NC KEVIN WALIGORSKI 01/09/14 01/27/14 03/03/14     $188,019.45 $188,226.10 $0.00 20 20 20 097, 150 Design Bid Build 2014-04-16 05:50:55.323
099 Active 007847 PNRS-0099(096)97( Sr 99, Alaskan Way Viaduct - Replacement S Holgate Skanska Usa Civil West California Distri $114,569,194.25 Urban PAUL JOHNSON 04/14/10 05/12/10 05/24/10 10/23/12 10/29/12 $152,620,104.46 $114,569,194.25 $121,886,928.01 1,303 1,123 262 099 Design Bid Build 2014-04-16 05:50:55.323
099 Active 008080 STPF-BH-0099(101) Sr 99, Aurora Ave - G Washington Memorial Br Seism Massana Construction, Inc. $6,157,383.00 NW JOHN CHI 02/24/11 04/05/11 04/27/11 03/01/13   $8,707,615.00 $6,157,383.00 $6,325,482.58 310 434 0 099 Design Bid Build 2014-04-16 05:50:55.323
099 Active 008290 BR-0099(119) Sr 99, Awv S Holgate St To S King St Stage 3 - Atl Guy F. Atkinson Construction, Llc $29,371,123.00 NW PAUL JOHNSON 05/23/12 05/30/12 06/20/12     $35,642,736.50 $29,371,123.00 $25,063,781.31 410 410 -15 099 Design Bid Build 2014-04-16 05:50:55.323
099 Active 008379 BH/STPF0099(102) Sr99, Spokane St O/Cross Timber Replace Mid-Mountain Contractors, Inc. $9,213,158.00 NW HIEN TRINH 11/15/12 11/29/12 12/19/12     $12,395,530.00 $9,213,158.00 $8,728,647.08 310 308 16 099 Design Bid Build 2014-04-16 05:50:55.323
099 Active 008381 CM-HSIP-STPE0099(110 Sr 99, Lincoln Way Vic To Airport Rd Vic Sb Sidewa Interwest Construction Inc $1,278,347.10 NW MARK SAWYER 12/12/12 12/17/12 01/08/13     $1,248,573.40 $1,278,347.10 $1,344,587.88 80 80 -15 099 Design Bid Build 2014-04-16 05:50:55.323
099 Active 008549 STPF-0099(122) Sr 99, Alaskan Way Viaduct - Replacement North Acc Guy F. Atkinson Construction, Llc $41,640,622.60 NW Not Specified 12/11/13 01/03/14 01/24/14     $46,127,934.75 $41,640,622.60 $1,040,573.34 540 540 501 099 Design Bid Build 2014-04-16 05:50:55.323
101 Active 008292 BR-0101(312) Us 101, Bone River Bridge Replace Bridge Cascade Bridge, Llc $5,715,393.20 SW LORI FIGONE 05/16/12 05/24/12 06/15/12 09/18/13 09/18/13 $6,317,645.00 $5,715,393.20 $5,657,279.61 220 220 0 101 Design Bid Build 2014-04-16 05:50:55.323
101 Active 008344 BR-0101(207) Us 101, Middle Nemah Riv Br. Replace Bridge Sb Structures, Llc $3,253,051.05 SW LORI FIGONE 07/25/12 07/31/12 08/10/12     $3,367,988.50 $3,253,051.05 $2,744,346.94 224 224 13.5 101 Design Bid Build 2014-04-16 05:50:55.323
101 Active 008376 BR-NH-0101(307) Us 101, Shore Rd To Kitchen-Dick Rd Widening Scarsella Bros., Inc. $27,069,690.00 OR JERRY MOORE 11/07/12 11/21/12 12/11/12     $33,989,672.79 $27,069,690.00 $15,960,149.49 543 543 233 101 Design Bid Build 2014-04-16 05:50:55.323
101 Active 008413 NH-0101(162) Us101 Ennis St Signal Rebuild Rebuild Signal Taurus Industries Inc 1036 73rd Ave Se $256,646.00 OR JERRY MOORE 02/06/13 02/11/13 03/04/13 08/27/13 09/10/13 $281,510.00 $256,646.00 $269,894.38 30 35 1 101 Design Bid Build 2014-04-16 05:50:55.323
101 Active 008442 NH-0101(163) Us 101 Couplet, Aberdeen Signals Rehabilitation Mill Plain Electric $683,830.00 OR SCOTTY IRELAND 03/27/13 04/01/13 04/23/13 03/11/14   $727,200.30 $683,830.00 $693,128.92 50 66 -1.5 101 Design Bid Build 2014-04-16 05:50:55.323
101 Active 008478 NH-0101(149) Us 101, Purdy Canyon Vic Slide Stabilized Slope Quigg Bros. Inc. $1,126,831.75 OR STEVE FUCHS 05/22/13 07/05/13 07/25/13 01/31/14   $1,926,406.37 $1,126,831.75 $1,182,708.95 70 75 0 101 Design Bid Build 2014-04-16 05:50:55.323
101 Active 008543 STPF-0101(351) Us 101, W Of Steamboat Island Rd To Black Lake Blv Lakeside Industries $894,042.06 OR STEVE FUCHS 11/06/13 11/12/13 12/03/13     $915,065.00 $894,042.06 $0.00 20 0 0 101   2014-04-16 05:50:55.323
104 Active 006525 BR-0104(033) Sr 104 / Hood Canal Bridge East Half Kiewit-General, A Joint Venture $204,000,000.00 OR AMITY TROWBRIDGE 06/18/03 06/24/03 07/30/03 03/21/10 10/04/10 $191,755,918.00 $204,000,000.00 $393,478,219.94 735 152 -81.75 104 Design Bid Build 2014-04-16 05:50:55.323
104 Active 008498 NH-2013(079) Sr 104, Kingston Tml Slips Dolphin Preservation - Orion Marine Con (Nw Marine Cns To 2011) $187,388.00 WSF JOHN CALLAHAN 06/26/13 07/01/13 07/26/13 01/13/14 03/20/14 $269,698.00 $187,388.00 $187,390.00 60 60 0 104 Marine Terminal 2014-04-16 05:50:55.323
104 Active 008541 STATE Sr 104, Edmonds Ferry Terminal Entry Replacement Thornberg Construction Company, $40,001.00 WSF TOM CASTOR 10/30/13 11/04/13 12/05/13     $56,001.00 $40,001.00 $0.00 40 40 10 104 Marine Terminal 2014-04-16 05:50:55.323
105 Active 008345 BR-0105(022) Sr 105, Smith Creek And North River Replace Bridge Scarsella Bros., Inc. $15,345,188.11 SW LORI FIGONE 08/22/12 08/31/12 09/25/12     $16,577,947.78 $15,345,188.11 $13,193,566.85 355 362 37 105 Design Bid Build 2014-04-16 05:50:55.323
106 Active 008494 STPF-0106(005) Sr 106, Twanoh Falls Chronic Environmental Deficie Tri-State Construction, Inc. $1,422,477.00 OR MICHELE BRITTON 06/12/13 06/19/13 07/09/13 10/16/13 01/21/14 $1,653,263.00 $1,422,477.00 $1,491,139.99 56 56 0 106 Design Bid Build 2014-04-16 05:50:55.323
107 Active 008452 BH-0107(007) Sr 107, Chehalis River Bridge Seismic Retrofit Quigg Bros. Inc. $1,131,004.00 OR RICKY BHALLA 04/17/13 04/22/13 05/13/13 12/24/13 01/31/14 $1,395,104.00 $1,131,004.00 $1,197,558.01 120 139.5 0 107 Design Bid Build 2014-04-16 05:50:55.323
108 Active 008545 BH-0108(007) Sr 108, Wildcat Creek Bridge 108/4 Scour Repair Rognlins, Inc. $117,719.00 OR STEVE FUCHS 12/04/13 12/09/13 12/31/13     $136,529.00 $117,719.00 $0.00 20 0 0 108 Design Bid Build 2014-04-16 05:50:55.323
129 Active 008580 STP-0129(008) Sr 129, Oregon State Line Vic To Mp 11.35 Vic - St Strider Construction Co, Inc. $431,860.00 SC Not Specified 02/26/14 02/28/14 03/20/14     $499,732.75 $431,860.00 $0.00 35 35 30 129 Design Bid Build 2014-04-16 05:50:55.323
155 Active 008567 STPF-9999(617) Sr 155 & Sr 215, Omak Area Paving Granite Construction Company $3,184,187.96 NC KEVIN WALIGORSKI 01/30/14 02/19/14 03/12/14     $3,162,020.48 $3,184,187.96 $0.00 75 75 75 097, 155 Design Bid Build 2014-04-16 05:50:55.323
161 Active 008144 ER-0902(252)/(331 Sr 161, Mashel River Bridge - Bridge Scour And Slo Stan Palmer Construction, Inc. $1,612,149.00 OR JON DEFFENBACHER 05/25/11 05/31/11 06/21/11 03/06/13   $1,791,346.00 $1,612,149.00 $3,138,938.93 85 141 9 161 Design Bid Build 2014-04-16 05:50:55.323
161 Active 008199 CM-0161(029) Sr 161, 24th St East To Milton Way Widening Tri-State Construction, Inc. $11,927,623.80 OR MICHELE BRITTON 08/10/11 08/17/11 09/07/11     $12,285,768.14 $11,927,623.80 $13,204,478.86 278 434 30 161 Design Bid Build 2014-04-16 05:50:55.323
162 Active 008493 STATE Sr 162, Ball Creek Culvert Replacement Whh Nisqually Federal Services Llc $571,143.15 OR STEVE FUCHS 06/12/13 06/17/13 07/08/13 09/30/13   $631,536.00 $571,143.15 $462,132.95 25 25 0 162 Design Bid Build 2014-04-16 05:50:55.323
163 Active 008524 STATE Sr 163, Point Defiance Ferry Terminal Trestle Repa Manson Construction/Engineering Co. $129,099.00 WSF JOHN CALLAHAN 08/28/13 09/06/13 10/08/13 01/30/14 02/10/14 $96,800.00 $129,099.00 $127,392.25 80 80 16 163 Marine Terminal 2014-04-16 05:50:55.323
163 Active 008546 STATE Sr 163, Point Defiance Ferry Terminal Floating Dol Orion Marine Con (Nw Marine Cns To 2011) $1,655,998.00 WSF JOHN CALLAHAN 11/14/13 11/20/13 12/20/13     $2,466,000.00 $1,655,998.00 $32,408.00 185 185 127 163 Marine Terminal 2014-04-16 05:50:55.323
164 Active 008583 STPF-HISP-9999(669) Sr 164 & Sr 410, High Point St To Sr 410 Watson St Icon Materials,A Division Of Cpm Corp. $2,139,174.50 NW Not Specified 03/12/14 03/17/14 04/09/14     $2,175,481.28 $2,139,174.50 $0.00 100 0 0 164, 410 Design Bid Build 2014-04-16 05:50:55.323
167 Active 008513 BR-0167(047) Sr 167, Puyallup River Bridge - Bridge Replacement Guy F. Atkinson Construction, Llc $23,220,888.00 OR BRENDEN CLARKE 09/27/13 10/03/13 10/18/13     $20,900,002.00 $23,220,888.00 $3,754,442.00 702 0 0 161, 167 Design Build 2014-04-16 05:50:55.323
171 Active 008530 HSIP-0171(017) Sr 171, Moses Lake Area Pedestrian Improvements Colvico, Inc. $401,568.00 NC JOSH PATRICK 09/19/13 09/24/13 10/14/13     $423,524.00 $401,568.00 $0.00 30 30 30 171 Design Bid Build 2014-04-16 05:50:55.323
195 Active 008378 HSIP0195(054) Cheney-Spokane Road New I/C - New Interchange Selland Construction, Inc. $6,408,374.60 ER CHAD SIMONSON 11/01/12 11/09/12 12/07/12     $8,374,454.20 $6,408,374.60 $4,851,698.12 150 151 -12.5 195 Design Bid Build 2014-04-16 05:50:55.323
195 Active 008551 CM-0195(155) Us 195, Hatch Rd To Cheney-Spokane Rd Congestion & Colvico, Inc. $610,254.00 ER BOB HILMES 12/05/13 12/16/13 01/08/14     $833,474.00 $610,254.00 $0.00 70 70 70 195 Design Bid Build 2014-04-16 05:50:55.323
203 Active 008536 STPF-0203(017) Sr 203, Tolt River Bridge To Mcdougall St - Paving Watson Asphalt Paving Co.(Dba_E.M.I.) $4,285,223.94 NW MARK SAWYER 11/06/13 11/13/13 12/03/13     $4,249,954.20 $4,285,223.94 $66,164.50 60 0 0 203 Design Bid Build 2014-04-16 05:50:55.323
231 Active 008507 STATE Sr 231, Rosenoff Rd Drainage Culvert Replacement N.A. Degerstrom Inc $392,052.39 ER DARREL MCCALLUM 07/11/13 07/17/13 08/06/13 11/01/13 11/01/13 $521,121.40 $392,052.39 $403,017.36 50 51.5 0 231 Design Bid Build 2014-04-16 05:50:55.323
243 Active 008575 SHIP-0243(003) Sr 243, Mattawa- Intersection Improvements West Company, Inc. $1,254,587.48 NC Not Specified 02/27/14 02/28/14 03/20/14     $1,160,656.57 $1,254,587.48 $0.00 35 0 0 243 Design Bid Build 2014-04-16 05:50:55.323
285 Active 008310 STATE Sr 285, W End Of George Sellar Bridge Intersection Selland Construction, Inc. $9,787,325.01 NC BOB ROMINE 06/14/12 06/18/12 07/09/12 10/25/13   $10,182,525.01 $9,787,325.01 $9,601,701.02 255 255 -16.75 028, 285 Design Bid Build 2014-04-16 05:50:55.323
291 Active 008421 STPF-0291(023) Sr 291, Division St To Stevens Co Line Paving Shamrock Paving, Inc. $3,791,714.75 ER BOB HILMES 03/14/13 04/17/13 05/08/13 10/01/13   $4,074,110.72 $3,791,714.75 $3,632,406.71 75 75 0 291 Design Bid Build 2014-04-16 05:50:55.323
305 Active 008550 STPH-2002(009) Sr 305, Bainbridge Ferry Terminal - Main Terminal Phc Asani Inc Dba Phc Construction $1,940,274.00 WSF JOHN CALLAHAN 11/20/13 11/25/13 12/18/13     $2,086,259.00 $1,940,274.00 $408,884.50 180 180 127 305 Marine Terminal 2014-04-16 05:50:55.323
395 Active 007777 STATE Nsc Us 2 To Wandemere Vicinity Graham Construction & Management, Inc. $37,540,555.55 ER DARREL MCCALLUM 07/23/09 07/29/09 08/17/09 06/11/12 05/21/13 $50,519,317.75 $37,540,555.55 $39,722,846.99 420 487 -28 395 Design Bid Build 2014-04-16 05:50:55.323
395 Active 007967 TIGER-0395(091) Us 395, Nsc - Freya St To Farwell Rd Sb Additional Graham Construction & Management, Inc. $21,455,920.65 ER BOB HILMES 07/22/10 07/28/10 08/17/10 10/05/12 03/21/14 $24,484,745.50 $21,455,920.65 $22,045,024.82 310 311 0 395 Design Bid Build 2014-04-16 05:50:55.323
395 Active 008195 TIGER0395(091) Us395 Nsc Parksmith Interchange Max J. Kuney Company $6,917,161.46 ER BOB HILMES 08/18/11 09/07/11 09/21/11 10/19/12 01/03/14 $6,801,315.50 $6,917,161.46 $7,429,836.44 185 211 0 395 Design Bid Build 2014-04-16 05:50:55.323
395 Active 008296 NH0395(098) Nsc Francis Avenue Improvements Graham Construction & Management, Inc. $14,045,942.90 ER DARREL MCCALLUM 06/21/12 08/03/12 08/23/12     $15,958,985.00 $14,045,942.90 $12,830,088.58 350 350 62 395 Design Bid Build 2014-04-16 05:50:55.323
395 Active 008496 TIGER4-0395(100) Us 395, Nsc - Bnsf Railway Structures/Realignment Apollo, Inc. $15,368,729.52 ER BOB HILMES 08/22/13 09/13/13 10/03/13     $18,733,358.46 $15,368,729.52 $2,615,181.59 380 380 330 395 Design Bid Build 2014-04-16 05:50:55.323
405 Active 007726 ARRA-4053(858) I-405, Ne 8th St To Sr 520 Braided Ramps- Intercha Guy F. Atkinson Construction, Llc $107,500,000.00 NW SEEMA JAVERI 11/04/09 11/09/09 11/25/09 06/01/12   $175,100,000.00 $107,500,000.00 $109,816,588.24 929 929 0 405 Design Build 2014-04-16 05:50:55.323
405 Active 008053 STATE I-405, Ne 116th Street Interchange And Street Impr Gary Merlino Construction Co., Inc. $10,693,960.80 NW HIEN TRINH 02/02/11 02/28/11 03/25/11 04/18/13   $13,407,331.75 $10,693,960.80 $13,522,787.57 425 432.5 0.5 405 Design Bid Build 2014-04-16 05:50:55.323
405 Active 008204 STATE I-405, Ne 6th St To I-5 Widening And Express Toll Flatiron Constructors Inc $155,500,001.00 NW LISA HODGSON 01/06/12 01/11/12 02/01/12     $249,999,996.00 $155,500,001.00 $88,133,703.51 1,330 1,330 579 405 Design Build 2014-04-16 05:50:55.323
405 Active 008260 ER-0801(007) I-405 / Sr 167, Thunder Hills Creek Mitigation Fis Scarsella Bros., Inc. $3,164,254.80 NW SEEMA JAVERI 03/28/12 04/06/12 04/27/12 02/21/13   $3,212,221.00 $3,164,254.80 $3,194,076.50 100 100 0 405 Design Bid Build 2014-04-16 05:50:55.323
405 Active 008393 IM/NHS-9999(460) Concrete Pavement Rehabilitation Guy F. Atkinson Construction, Llc $7,277,888.00 NW MARY ANN REDDELL 02/07/13 02/12/13 03/04/13 10/28/13 03/18/14 $8,300,000.00 $7,277,888.00 $7,737,393.27 247 247 6 405, 518 Design Build 2014-04-16 05:50:55.323
405 Active 008403 IM-4053(962) Nb Sr167 Ramp-Nb 405 Major Drainage Rep Major Drai Active Construction Inc. $489,405.21 NW ALETA BORSCHOWA 01/24/13 02/01/13 03/05/13 09/04/13   $504,021.00 $489,405.21 $388,545.98 32 32 0 405 Design Bid Build 2014-04-16 05:50:55.323
410 Active 008576 BH-STPF-0410(055) Sr 410, Scatter Creek Bridge Seismic Massana Construction, Inc. $697,344.00 NW Not Specified 02/20/14 02/26/14 03/18/14     $787,704.00 $697,344.00 $0.00 90 0 0 410 Design Bid Build 2014-04-16 05:50:55.323
433 Active 007895 ARRA-BH-0433(010) Sr 433, Lewis And Clark Bridge Superstructure Pain Odyssey/Geronimo Joint Venture $33,774,714.00 SW LORI FIGONE 03/17/10 04/30/10 06/08/10 12/20/13   $36,461,689.00 $33,774,714.00 $33,432,576.39 500 500 0 433 Design Bid Build 2014-04-16 05:50:55.323
500 Active 008079 NH-0500(016) Sr 500, St. Johns Blvd - Interchange Tapani Underground, Inc. $27,237,397.12 SW LEON WINGER 03/02/11 04/29/11 05/20/11 10/25/13   $33,403,982.85 $27,237,397.12 $26,853,728.70 440 493.5 -2 500 Design Bid Build 2014-04-16 05:50:55.323
502 Active 008299 STATE Sr 502 / I-5 To Battle Ground Add Lanes Stage 1 Tapani Underground, Inc. $5,194,042.60 SW CHRIS TAMS 05/31/12 06/06/12 06/26/12 08/30/13 03/07/14 $7,151,300.75 $5,194,042.60 $5,580,794.11 75 97 0 502 Design Bid Build 2014-04-16 05:50:55.323
502 Active 008573 STATE Sr 502, I-5 To Battle Ground Add Lanes Stage 2 Rotschy, Inc. $27,544,360.31 SW CHRIS TAMS 03/05/14 03/17/14 04/09/14     $28,982,795.35 $27,544,360.31 $0.00 320 320 320 502 Design Bid Build 2014-04-16 05:50:55.323
503 Active 008579 CM-0503(027) Traveler Information Incident Management And Commu DW Not Applicable $639,867.16 SW Not Specified 03/19/14 03/24/14 04/14/14     $742,624.90 $639,867.16 $0.00       503 Design Bid Build 2014-04-16 05:50:55.323
507 Active 008334 HSIP-0507(023) Sr 507, 8th Ave S To 208th St E Safety Miles Resources Dba Woodworth & Co $889,752.75 OR KIM MUELLER 07/05/12 07/09/12 07/30/12 04/23/13   $992,886.25 $889,752.75 $882,191.53 45 45 0 507 Design Bid Build 2014-04-16 05:50:55.323
507 Active 008516 STPF-0507(026) Sr 507, Reynolds Ave Signal Replacement Project Travers Electric Inc. $438,095.55 SW COLIN NEWELL 08/21/13 08/26/13 09/17/13     $470,334.00 $438,095.55 $442,041.08 30 30 5 507 Design Bid Build 2014-04-16 05:50:55.323
510 Active 008472 STPF-0510(015) Sr 510, Reservation Road Vicinity Intersection Imp Klb Construction Inc. $2,630,698.60 OR STEVE FUCHS 05/15/13 05/22/13 06/11/13     $2,890,659.60 $2,630,698.60 $2,267,035.33 105 105 16 510 Design Bid Build 2014-04-16 05:50:55.323
512 Active 008455 NH-0512(016) Sr512 Jct I-5 To Ne Of 104th Paving Tucci & Sons, Inc. $2,779,289.70 OR JON DEFFENBACHER 05/01/13 05/08/13 05/28/13 12/19/13 12/19/13 $3,008,961.00 $2,779,289.70 $2,799,567.32 50 55 1 512 Design Bid Build 2014-04-16 05:50:55.323
518 Active 007350 NH-0518(008) Sr 518, Sr 509 To I-5/I-405 - Widening Tri-State Construction, Inc. $26,631,265.90 NW MARK SAWYER 06/13/07 06/18/07 07/11/07 10/21/11 09/11/12 $26,625,174.75 $26,631,265.90 $27,742,859.07 320 321 -4 509, 518 Design Bid Build 2014-04-16 05:50:55.323
519 Active 008198 STATE Seattle Terminal Elect Distrib Sstm Upgrade System Mcclure And Sons Inc. $2,969,687.60 WSF JOHN CALLAHAN 08/17/11 08/24/11 09/21/11 06/06/13 06/07/13 $4,506,128.66 $2,969,687.60 $3,161,447.26 240 320 0 519 Marine Terminal 2014-04-16 05:50:55.323
520 Active 007637 STATE Sr 520/ W Lake Sammamish Pkwy To Sr 202 Hov And Sr Pcl Construction Services, Inc. $37,736,270.05 NW HIEN TRINH 03/04/09 03/09/09 03/30/09 03/14/11 03/15/14 $53,661,574.08 $37,736,270.05 $37,795,605.38 485 485 0 520 Design Bid Build 2014-04-16 05:50:55.323
520 Active 007826 BR-0520(043) Sr 520 Pontoon Construction Design-Build Project Kiewit-General, A Joint Venture $367,330,000.00 OR DEWAYNE MATLOCK 12/23/09 01/08/10 02/12/10     $600,000,006.00 $367,330,000.00 $379,209,160.60 1,529 1,784 277 520 Design Build 2014-04-16 05:50:55.323
520 Active 007963 STATE Sr 520, Eastside Transit And Hov Project A Design Eastside Corridor Constructors $306,278,000.00 Urban MARK ALLISON 09/16/10 10/29/10 11/29/10     $422,064,082.00 $306,278,000.00 $309,232,927.79 1,115 1,115 -106 520 Design Build 2014-04-16 05:50:55.323
520 Active 008066 BRNHSTPF0520(047) Sr 520 / I-5 To Medina - Evergreen Point Floating Kiewit General Manson Joint Venture $586,561,000.00 Urban DAVE BECHER 08/10/11 08/11/11 08/31/11     $640,769,000.00 $586,561,000.00 $428,226,766.62 1,429 1,701 747 520 Design Build 2014-04-16 05:50:55.323
520 Active 008288 STATE Sr 520, Evans Creek Eastside Wetland Mitigation Goodfellow Bros Inc $3,856,069.00 NW ALETA BORSCHOWA 05/09/12 05/17/12 06/11/12 11/15/13   $5,055,879.25 $3,856,069.00 $2,783,057.42 245 245 0 520 Design Bid Build 2014-04-16 05:50:55.323
520 Active 008432 BR-0520(051) Sr 520 West Connection Bridge Mowat-American Jv 20210 142nd Ave Ne 980 $22,129,243.20 NW JOHN CHI 04/03/13 04/18/13 05/08/13     $20,639,666.98 $22,129,243.20 $16,362,939.65 290 300 94 520 Design Bid Build 2014-04-16 05:50:55.323
522 Active 007938 STATE Sr 522, Us 2 Interchange Flyover Ramp Scarsella Bros., Inc. $15,514,435.30 NW MARY ANN REDDELL 05/26/10 06/01/10 06/15/10 06/21/12   $22,322,279.40 $15,514,435.30 $15,858,647.85 350 351 0 002, 522 Design Bid Build 2014-04-16 05:50:55.323
522 Active 008128 NICKEL Sr 522, Snohomish River Bridge To Us 2 Vic Widenin Scarsella Bros., Inc. $73,138,890.32 NW MARY ANN REDDELL 05/18/11 05/26/11 06/16/11     $86,169,502.10 $73,138,890.32 $59,552,971.74 850 850 183.5 522 Design Bid Build 2014-04-16 05:50:55.323
522 Active 008461 NHPP-0522(054) Sr 522, Echo Lake Rd Vic To Snohomish River Br Pav Lakeside Industries $981,511.35 NW JOHN CHI 04/24/13 04/29/13 05/24/13 08/06/13 08/07/13 $1,175,195.60 $981,511.35 $1,000,771.32 30 30 6 522 Design Bid Build 2014-04-16 05:50:55.323
529 Active 007948 STATE Sr 529, Ebey Slough Br -  Replace Bridge Granite Construction Company $21,541,000.00 NW MARK SAWYER 06/09/10 06/16/10 07/02/10     $28,057,110.00 $21,541,000.00 $20,511,458.74 763 763 32 529 Design Bid Build 2014-04-16 05:50:55.323
529 Active 008303 BH-0529(018) Sr 529, Sb Snohomish River Bridge Special Bridge R Pcl Civil Constructors Inc $1,711,104.00 NW MARK SAWYER 05/23/12 05/29/12 06/19/12 10/18/13   $2,898,854.00 $1,711,104.00 $1,561,150.00 35 35 -139.5 529 Design Bid Build 2014-04-16 05:50:55.323
530 Active 008065 STATE Sr 530, Sauk River Bank Erosion Realign Roadway Trimaxx Construction $2,480,567.66 NW HAMMER/SPAHR 01/12/11 01/18/11 02/04/11 12/14/11   $3,230,573.15 $2,480,567.66 $2,445,042.64 145 160 0 530 Design Bid Build 2014-04-16 05:50:55.323
531 Active 008438 STPF-0531(009) 43rd Ave To Sr 9 Paving Granite Construction Company $1,229,150.50 NW Not Specified 04/10/13 04/15/13 05/07/13     $1,267,497.50 $1,229,150.50 $1,158,355.75 30 31 4.5 531 Design Bid Build 2014-04-16 05:50:55.323
539 Active 008416 CBI-0539(014) Sr 539 / I-5 To Horton Road Access Management Colacurcio Brothers Inc $1,685,790.15 NW CHRIS DAMITIO 02/21/13 04/08/13 04/29/13 12/11/13 12/30/13 $1,542,438.02 $1,685,790.15 $1,937,580.54 80 108 0 539 Design Bid Build 2014-04-16 05:50:55.323
539 Active 008548 CBI-9999(638) Sr 539 / Sr 9, Advanced Traveler Information Syste Valley Electric Co. Of Mt Vernon $1,875,189.10 NW CHRIS DAMITIO 11/20/13 11/25/13 12/16/13     $2,039,563.00 $1,875,189.10 $3,257.39 50 50 50 009, 539 Design Bid Build 2014-04-16 05:50:55.323
546 Active 008418 CBI-0546(006) Sr 546, Depot Rd And Bender Rd Intersection Improv Colacurcio Brothers Inc $2,149,051.85 NW CHRIS DAMITIO 02/21/13 02/27/13 04/02/13 11/01/13   $2,776,811.85 $2,149,051.85 $2,308,755.82 51 61.5 0 546 Design Bid Build 2014-04-16 05:50:55.323
900 Active 007553 STATE/NICKEL/LOCA Sr 900, Se 78th St Vic To Newport Way Vic And I-90 Icon Materials,A Division Of Cpm Corp. $19,354,286.62 Urban DAVE LINDBERG 06/25/08 06/30/08 07/14/08 04/14/10 04/15/13 $22,596,893.55 $19,354,286.62 $19,167,045.73 320 320 0 090, 900 Design Bid Build 2014-04-16 05:50:55.323
904 Active 008539 STPF-0904(123) Sr 904, Betz Rd To I-90 - Paving Inland Asphalt Company $872,473.24 ER Not Specified 10/24/13 10/28/13 11/20/13     $1,098,211.60 $872,473.24 $0.00 24 24 24 904 Design Bid Build 2014-04-16 05:50:55.323