Contract Status Contract Number Federal Aid Number State Route Contract Title Contractor Name Bid Amount WSDOT Engineer Name Region Bid Opening Date Awarded Date Execution Date Substantial Completion Date Physical Completion Date Engineer's Estimate Prime Bid Amount Amount Paid to Date Original Working Days Count Authorized Days Count Remaining Working Days Count Contract State Routes Delivery Method RunDate
Active 006525 BR-0104(033) 104 Sr 104 / Hood Canal Bridge East Half Kiewit-General, A Joint Venture $204,000,000.00 AMITY TROWBRIDGE OR 06/18/03 06/24/03 07/30/03 03/21/10 10/04/10 $191,755,918.00 $204,000,000.00 $393,478,219.94 735 152 -81.75 104 Design Bid Build 2013-04-05 05:52:47.283
Active 007163 IM-0054(264) 005 I-5, S Everett Freeway Station 112th Street Se I-5 Guy F. Atkinson Construction, Llc $24,152,278.70 JANICE FAHNING NW 06/28/06 07/14/06 08/23/06 09/21/08   $23,634,192.44 $24,152,278.70 $24,841,054.73 531 531 0 005 Design Bid Build 2013-04-05 05:52:47.283
Active 007217 NICKEL-STATE&LOCA 090 I-90, 2-Way Transit & Hov Operations Stage 1 Max J. Kuney Company $22,459,943.06 ALETA BORSCHOWA NW 01/18/07 02/27/07 03/08/07 05/26/09 01/05/13 $18,312,567.52 $22,459,943.06 $23,871,590.41 350 410 0 090 Design Bid Build 2013-04-05 05:52:47.283
Active 007264 STATE 090 I 90, Eastbound Ramps To Sr 202 Roundabout Tri-State Construction, Inc. $1,163,880.80 MESSAY SHIFERAW NW 02/14/07 02/16/07 03/08/07 10/01/07   $1,137,689.10 $1,163,880.80 $1,163,545.17 130 130 19 090, 202 Design Bid Build 2013-04-05 05:52:47.283
Active 007350 NH-0518(008) 518 Sr 518, Sr 509 To I-5/I-405 - Widening Tri-State Construction, Inc. $26,631,265.90 MARK SAWYER NW 06/13/07 06/18/07 07/11/07 10/21/11 09/11/12 $26,625,174.75 $26,631,265.90 $27,654,140.78 320 321 -4 509, 518 Design Bid Build 2013-04-05 05:52:47.283
Active 007417 (AC)HP-4053(855&8 405 Ne 10th St Bridge Crossing, Stage 2 Max J. Kuney Company $13,866,639.00 ALETA BORSCHOWA NW 11/28/07 12/03/07 12/17/07 02/16/10   $15,540,015.80 $13,866,639.00 $14,194,883.47 355 355 0 405 Design Bid Build 2013-04-05 05:52:47.283
Active 007431 STPUL0522(042) 522 Sr522, U/W Bothell Cascadia South Access Mowat Construction Company $36,650,726.20 JANICE FAHNING NW 12/12/07 01/17/08 02/08/08 01/22/10 01/06/13 $31,307,541.20 $36,650,726.20 $37,963,893.38 470 470 57.5 405, 522 Design Bid Build 2013-04-05 05:52:47.283
Active 007465 NICKEL/LOCAL 005 I-5 Grand Mound-Maytown Stg 1-Add Lanes Scarsella Bros., Inc. $61,494,605.66 MCNUTT/ENGEL OR 03/05/08 03/17/08 04/07/08 08/19/11   $68,294,765.61 $61,494,605.66 $65,904,394.11 530 568 0 005, 012 Design Bid Build 2013-04-05 05:52:47.283
Active 007495 STATE 005 I-5, 5th Avenue Ne To Ne 92nd - Noise Wall Granite Construction Company $3,315,000.12 MIKE ASKARIAN NW 03/19/08 03/24/08 04/22/08 11/04/09   $5,514,509.00 $3,315,000.12 $3,395,351.84 230 235 30 005 Design Bid Build 2013-04-05 05:52:47.283
Active 007538 STATE 005 Boston - E Shelby, Westside Noisewalls C.A. Carey Corporation $5,375,508.00 MIKE ASKARIAN NW 05/21/08 05/27/08 06/04/08 05/08/09   $3,609,783.00 $5,375,508.00 $5,487,733.51 180 189 0 005 Design Bid Build 2013-04-05 05:52:47.283
Active 007553 STATE/NICKEL/LOCA 900 Sr 900, Se 78th St Vic To Newport Way Vic And I-90 Icon Materials,A Division Of Cpm Corp. $19,354,286.62 DAVE LINDBERG NW 06/25/08 06/30/08 07/14/08 04/14/10   $22,596,893.55 $19,354,286.62 $19,167,045.73 320 320 0.5 090, 900 Design Bid Build 2013-04-05 05:52:47.283
Active 007569 STATE 161 Sr 161/ Stone Creek Noise Wall Tri-State Construction, Inc. $959,281.00 ALETA BORSCHOWA NW 06/18/08 06/23/08 07/11/08 01/26/10   $927,721.00 $959,281.00 $900,312.90 60 72 11 161 Design Bid Build 2013-04-05 05:52:47.283
Active 007577 BR-0101(276) 101 Purdy Creek Bridge - Replacement Quigg Bros. Inc. $7,697,284.00 NEAL UHLMEYER OR 06/25/08 06/30/08 07/09/08 03/03/10 03/11/13 $9,601,976.52 $7,697,284.00 $7,470,206.60 333 333 0 101 Design Bid Build 2013-04-05 05:52:47.283
Active 007610 STATE 395 Us 395, Nsc - Us 2 Lowering Graham Construction & Management, Inc. $42,849,073.80 BOB HILMES ER 10/16/08 10/21/08 11/13/08 11/28/11 11/05/12 $59,750,499.10 $42,849,073.80 $46,159,738.56 620 645.5 0 395 Design Bid Build 2013-04-05 05:52:47.283
Active 007624 STATE 405 I-405, I-5 To Sr 169 Stage 2 Widening And Sr 515 I I-405 Corridor Design Builders $83,599,000.00 LISA HODGSON NW 02/04/09 02/24/09 03/16/09 07/07/11 12/20/11 $109,999,985.00 $83,599,000.00 $84,638,187.58 900 900 0 405 Design Build 2013-04-05 05:52:47.283
Active 007631 IM-0054(276) 005 I-5, 172nd St Ne (Sr 531) Interchange Modification Northwest Construction, Inc. $12,975,831.69 CHAD BROWN NW 01/07/09 01/12/09 01/30/09 07/15/10 01/14/13 $21,408,553.10 $12,975,831.69 $12,445,951.48 240 240 0 005, 531 Design Bid Build 2013-04-05 05:52:47.283
Active 007637 STATE 520 Sr 520/ W Lake Sammamish Pkwy To Sr 202 Hov And Sr Pcl Construction Services, Inc. $37,736,270.05 HIEN TRINH NW 03/04/09 03/09/09 03/30/09 03/14/11   $53,661,574.08 $37,736,270.05 $37,711,397.55 485 485 0 520 Design Bid Build 2013-04-05 05:52:47.283
Active 007649 STATE/LOCAL 005 I-5, Mountlake Terrace Freeway Station Mid-Mountain Contractors, Inc. $17,747,153.15 CHAD BROWN NW 02/19/09 03/17/09 04/03/09 03/17/11 12/14/12 $21,926,500.41 $17,747,153.15 $16,881,393.45 450 465 0.5 005 Design Bid Build 2013-04-05 05:52:47.283
Active 007677 STATE 285 Sr 285, George Sellar Bridge Additional Eb Lane Max J. Kuney Company $12,884,988.00 KEVIN WALIGORSKI NC 03/19/09 03/24/09 04/13/09 07/22/11 11/15/11 $10,596,977.40 $12,884,988.00 $12,750,399.74 322 388 0.75 285 Design Bid Build 2013-04-05 05:52:47.283
Active 007726 ARRA-4053(858) 405 I-405, Ne 8th St To Sr 520 Braided Ramps- Intercha Guy F. Atkinson Construction, Llc $107,500,000.00 SEEMA JAVERI NW 11/04/09 11/09/09 11/25/09 06/01/12   $175,100,000.00 $107,500,000.00 $109,497,144.74 929 929 0 405 Design Build 2013-04-05 05:52:47.283
Active 007775 STPF-0410(051) 410 Sr410 Clay Crk Outfall Washout Repair Weber Construction, Inc. $444,988.40 JEFF MINNICK SC 06/10/09 06/15/09 07/06/09 11/03/09 10/10/12 $460,081.25 $444,988.40 $425,232.24 35 35 0 410 Design Bid Build 2013-04-05 05:52:47.283
Active 007777 STATE 395 Nsc Us 2 To Wandemere Vicinity Graham Construction & Management, Inc. $37,540,555.55 DARREL MCCALLUM ER 07/23/09 07/29/09 08/17/09 06/11/12   $50,519,317.75 $37,540,555.55 $39,428,808.10 420 470 -20 395 Design Bid Build 2013-04-05 05:52:47.283
Active 007779 ARRA-IM-0053(948) 005 I-5, Port Of Tacoma Road To King County Line - Hov Tri-State Construction, Inc. $31,015,383.05 RUMINA SUAFOA OR 07/08/09 07/13/09 07/23/09 05/31/11 05/02/12 $41,349,337.02 $31,015,383.05 $35,225,458.81 425 405 0 005 Design Bid Build 2013-04-05 05:52:47.283
Active 007786 STATE 090 I90 Hi Point To Preston Ped/Bike Trail Klb Construction Inc. $1,971,676.50 JOHN CHI NW 07/15/09 07/20/09 08/11/09 11/04/10 12/02/11 $2,421,770.30 $1,971,676.50 $2,177,715.95 90 90 0 090 Design Bid Build 2013-04-05 05:52:47.283
Active 007798 STATE 005 I-5 5th Ave-Ne 92nd Noise Wall Stg 2 Noise Wall - Massana Construction, Inc. $1,475,061.00 BRYANT BULLAMORE NW 07/22/09 07/31/09 08/24/09 05/20/10   $1,870,056.50 $1,475,061.00 $1,510,537.87 90 113 1.5 005 Design Bid Build 2013-04-05 05:52:47.283
Active 007826 BR-0520(043) 520 Sr 520 Pontoon Construction Design-Build Project Kiewit-General, A Joint Venture $367,330,000.00 DEWAYNE MATLOCK OR 12/23/09 01/08/10 02/12/10     $600,000,006.00 $367,330,000.00 $228,354,542.15 1,529 1,529 400 520 Design Build 2013-04-05 05:52:47.283
Active 007835 STATE 005 I-5, Sr 432, Talley Way Interchange Northwest Construction, Inc. $20,528,756.00 LORI FIGONE SW 12/02/09 12/15/09 01/05/10 11/15/11   $30,928,998.66 $20,528,756.00 $21,284,115.46 400 438.5 0 005, 432 Design Bid Build 2013-04-05 05:52:47.283
Active 007844 STATE 099 Sr 99 Et Al, 1st Ave S To S 112th St And S 120th S Signal Electric Inc $2,482,582.10 DAVE LINDBERG NW 11/18/09 11/23/09 12/14/09 10/18/10   $2,938,514.90 $2,482,582.10 $2,648,846.84 180 190 0 099, 509, 599 Design Bid Build 2013-04-05 05:52:47.283
Active 007847 PNRS-0099(096)97( 099 Sr 99, Alaskan Way Viaduct - Replacement S Holgate Skanska Usa Civil West California Distri $114,569,194.25 PAUL JOHNSON Urban 04/14/10 05/12/10 05/24/10 10/23/12 10/29/12 $152,620,104.46 $114,569,194.25 $121,491,250.64 1,303 1,123 262 099 Design Bid Build 2013-04-05 05:52:47.283
Active 007852 STATE 090 I-90, Hyak To Snowshed Vicinity Phase 1b- Add Lane Max J. Kuney Company $76,699,232.66 WILL SMITH SC 01/21/10 01/27/10 02/08/10     $110,365,251.05 $76,699,232.66 $81,452,714.21 519 568.5 217.5 090 Design Bid Build 2013-04-05 05:52:47.283
Active 007857 NH-0002(287) 002 Us 2, Stevens Pass Summit- Pedestrian Safety Tri-State Construction, Inc. $1,785,325.20 PIERSON/PATRICK NC 12/17/09 12/21/09 01/11/10 06/13/11 12/14/11 $2,511,246.70 $1,785,325.20 $1,861,348.50 135 137 0 002 Design Bid Build 2013-04-05 05:52:47.283
Active 007858 ARRA-0822(128) 082 I-82, Valley Mall Blvd. Interchange Rebuild Interc Apollo, Inc. $19,079,869.61 JEFF MINNICK SC 01/13/10 02/19/10 03/10/10 11/14/11 11/07/12 $23,320,934.19 $19,079,869.61 $21,451,279.89 283 313 2 082 Design Bid Build 2013-04-05 05:52:47.283
Active 007859 STATE 011 Sr 11, I-5 Interchange - Josh Wilson Rd Rebuild In Interwest Construction Inc $4,794,882.15 HAMMER/SPAHR NW 01/27/10 02/01/10 02/19/10 11/05/10   $7,215,951.90 $4,794,882.15 $4,687,007.43 150 154 0 005, 011, 020 Design Bid Build 2013-04-05 05:52:47.283
Active 007862 NH-0906(210) 090 I-90 Spokane Poe Weigh Station Relocation Selland Construction, Inc. $6,704,332.55 CHAD SIMONSON ER 02/04/10 02/17/10 03/05/10 11/07/11 12/20/11 $10,333,570.25 $6,704,332.55 $6,826,569.99 325 327 1 090 Design Bid Build 2013-04-05 05:52:47.283
Active 007866 STATE 410 Sr 410/ 214th Ave E To 234th Ave E- Widening J. R. Hayes & Sons, Inc. $6,783,945.32 MARYLOU NEBERGALL OR 02/03/10 02/08/10 03/01/10 03/07/12   $11,315,537.50 $6,783,945.32 $7,909,424.82 175 214 0 410 Design Bid Build 2013-04-05 05:52:47.283
Active 007870 LOCAL&SOUNDTRANSI 090 I-90, Two-Way Transit & Hov Operations Stage 2 Gary Merlino Construction Co., Inc. $11,578,632.30 SAWYER/TRINH NW 02/10/10 03/01/10 03/22/10 04/15/12   $15,290,112.50 $11,578,632.30 $13,377,192.96 380 496.5 0 090 Design Bid Build 2013-04-05 05:52:47.283
Active 007874 CBI-IMD-OO55(227) 005 I-5, Blaine Exit Interchange Improvements Interwest Construction Inc $2,765,789.35 CHRIS DAMITIO NW 01/27/10 02/05/10 03/02/10 08/31/10   $4,662,787.58 $2,765,789.35 $3,588,464.63 118 120 0 005 Design Bid Build 2013-04-05 05:52:47.283
Active 007895 ARRA-BH-0433(010) 433 Sr 433, Lewis And Clark Bridge Superstructure Pain Odyssey/Geronimo Joint Venture $33,774,714.00 LORI FIGONE SW 03/17/10 04/30/10 06/08/10     $36,461,689.00 $33,774,714.00 $25,551,809.70 500 500 183.5 433 Design Bid Build 2013-04-05 05:52:47.283
Active 007903 STATE 005 I-5, Blakeslee Junction Rr Xing To Grand Mound I/C Tri-State Construction, Inc. $19,730,514.90 COLIN NEWELL SW 04/07/10 04/15/10 05/10/10 02/24/12   $28,025,229.50 $19,730,514.90 $22,383,491.15 220 246 0 005 Design Bid Build 2013-04-05 05:52:47.283
Active 007911 STATE 542 Sr 542, Gallup Creek Bridge Replacement Scarsella Bros., Inc. $2,707,707.07 CHRIS DAMITIO NW 03/31/10 04/09/10 04/28/10 11/11/11 11/15/12 $4,071,887.45 $2,707,707.07 $2,629,124.71 237 237 0 542 Design Bid Build 2013-04-05 05:52:47.283
Active 007916 STATE 002 Us 2 Safety Improvements Vetch Construction Inc. $2,932,708.10 DAVE CRISMAN NW 04/14/10 04/28/10 05/18/10 09/02/11   $4,326,328.00 $2,932,708.10 $3,282,169.03 80 99 10.5 002 Design Bid Build 2013-04-05 05:52:47.283
Active 007917 IM-0901(461) 090 I90, Sunset Way Connection I/C Mods Tri-State Construction, Inc. $1,305,983.00 HIEN TRINH NW 04/14/10 04/28/10 05/19/10 11/10/11   $1,730,961.25 $1,305,983.00 $1,193,347.67 75 75 0 090 Design Bid Build 2013-04-05 05:52:47.283
Active 007919 STPUL0054(279) 005 I-5, 164th St Sb Off Ramp Channelization Signal Electric Inc $155,778.30 CHAD BROWN NW 04/07/10 04/12/10 04/27/10 09/23/10 04/21/11 $282,111.50 $155,778.30 $137,005.71 20 20 0 005 Design Bid Build 2013-04-05 05:52:47.283
Active 007920 STATE 009 Sr 9, Lundeen Parkway To Sr 92 Intersection Improv Granite Construction Company $10,921,000.00 DAVE CRISMAN NW 05/05/10 05/17/10 06/10/10 10/28/11   $16,571,849.37 $10,921,000.00 $12,022,820.17 180 207 9.5 009, 092 Design Bid Build 2013-04-05 05:52:47.283
Active 007926 BR-0303(005) 303 Sr 303, Manette Bridge 303/4a - Bridge Replacement Manson-Mowat, A Joint Venture $44,127,374.00 JEFF COOK OR 05/19/10 06/15/10 06/24/10   02/27/13 $42,337,364.00 $44,127,374.00 $49,234,731.05 382 428 3 303 Design Bid Build 2013-04-05 05:52:47.283
Active 007936 STATE 005 I-5, Sr 161/Sr 18 Interchange Improvements Mowat Construction Company $50,778,922.50 ALETA BORSCHOWA NW 06/09/10 06/21/10 07/08/10     $64,553,797.24 $50,778,922.50 $51,882,253.65 660 660 38 005, 018, 161 Design Bid Build 2013-04-05 05:52:47.283
Active 007938 STATE 522 Sr 522, Us 2 Interchange Flyover Ramp Scarsella Bros., Inc. $15,514,435.30 CHAD BROWN NW 05/26/10 06/01/10 06/15/10 06/21/12   $22,322,279.40 $15,514,435.30 $15,673,631.10 350 351 0 002, 522 Design Bid Build 2013-04-05 05:52:47.283
Active 007945 STATE 005 I-5, 196th St (Sr 524) I/C Sb Braided Ramp Northwest Construction, Inc. $18,727,000.00 MARK SAWYER NW 06/23/10 06/28/10 07/15/10     $31,389,404.89 $18,727,000.00 $19,723,795.58 360 362 1 005, 525 Design Bid Build 2013-04-05 05:52:47.283
Active 007946 STATE 005 I-5, Portland Ave To Port Of Tacoma Rd - Nb Hov St Scarsella Bros., Inc. $16,392,704.34 NEAL UHLMEYER OR 06/09/10 06/14/10 07/07/10 07/30/12   $22,136,273.50 $16,392,704.34 $16,284,490.03 270 275 -18.5 005, 167 Design Bid Build 2013-04-05 05:52:47.283
Active 007948 STATE 529 Sr 529, Ebey Slough Br -  Replace Bridge Granite Construction Company $21,541,000.00 MARK SAWYER NW 06/09/10 06/16/10 07/02/10     $28,057,110.00 $21,541,000.00 $20,211,748.52 763 763 106.5 529 Design Bid Build 2013-04-05 05:52:47.283
Active 007959 NH-0099(109) 099 Sr 99, S Hudson St To Ward St Automated Viaduct Cl Signal Electric Inc $1,434,793.73 DAVE LINDBERG Urban 06/16/10 07/28/10 08/18/10 03/16/11 12/05/12 $1,974,764.50 $1,434,793.73 $1,176,090.51 90 97 0 099 Design Bid Build 2013-04-05 05:52:47.283
Active 007962 IM-ITS-0055(238) 005 I-5 Downtown Bellingham On/Off Ramps - Ramp Recons Vetch Construction Inc. $4,439,672.03 CHRIS DAMITIO NW 07/14/10 08/18/10 09/07/10 12/19/12   $5,930,296.14 $4,439,672.03 $4,569,225.53 160 160.5 -49 005 Design Bid Build 2013-04-05 05:52:47.283
Active 007963 STATE 520 Sr 520, Eastside Transit And Hov Project A Design Eastside Corridor Constructors $306,278,000.00 MARK ALLISON Urban 09/16/10 10/29/10 11/29/10     $422,064,082.00 $306,278,000.00 $237,273,216.82 1,115 1,115 279 520 Design Build 2013-04-05 05:52:47.283
Active 007967 TIGER-0395(091) 395 Us 395, Nsc - Freya St To Farwell Rd Sb Additional Graham Construction & Management, Inc. $21,455,920.65 BOB HILMES ER 07/22/10 07/28/10 08/17/10 10/05/12   $24,484,745.50 $21,455,920.65 $21,863,224.92 310 311 1.5 395 Design Bid Build 2013-04-05 05:52:47.283
Active 007971 ARRA/IM-0902(315) 090 I-90, Lake Easton Vic To Big Creek Br Vic Eb - Rep Icon Materials,A Division Of Cpm Corp. $14,807,102.55 JEFF MINNICK SC 07/28/10 07/30/10 08/18/10     $16,361,717.55 $14,807,102.55 $15,287,790.12 260 260 8 090 Design Bid Build 2013-04-05 05:52:47.283
Active 007974 STATE 005 I-5 Tacoma Hov Mitigation Scarsella Bros., Inc. $1,487,229.43 RUMINA SUAFOA OR 07/08/10 07/12/10 07/30/10 02/24/12 02/25/13 $2,764,535.50 $1,487,229.43 $1,130,588.99 162 162 0 005, 167 Design Bid Build 2013-04-05 05:52:47.283
Active 007984 STPF-0105(020) 105 Sr 105, Norris Slough Culvert Replacement Boss Construction Inc $1,765,584.61 COLIN NEWELL SW 08/11/10 08/13/10 09/07/10 05/11/12   $1,676,121.00 $1,765,584.61 $1,617,442.13 160 207 -21.5 105 Design Bid Build 2013-04-05 05:52:47.283
Active 007998 NICKEL_FUNDS 005 I-5, Grand Mound To Maytown Stage Two - Replace In Tri-State Construction, Inc. $15,517,831.55 ENGEL/NEBERGALL OR 11/03/10 11/22/10 12/14/10 11/13/12   $22,367,513.91 $15,517,831.55 $16,614,844.50 198 292 0 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008012 STATE 020 Sr 20, Red Cabin Creek - Ced Interwest Construction Inc $1,939,941.40 HAMMER/SPAHR NW 10/20/10 10/25/10 11/16/10 05/08/12 11/20/12 $2,868,960.80 $1,939,941.40 $1,789,132.39 101 101 0 020 Design Bid Build 2013-04-05 05:52:47.283
Active 008016 IM-0055(242) 005 I-5, Joe Leary Slough To Nulle Rd Vic Paving Desig Granite Construction Company $14,553,000.00 PATRICK FULLER NW 01/14/11 02/04/11 02/18/11 10/31/12 11/09/12 $14,553,000.00 $14,553,000.00 $14,137,167.08 367 367 18 005 Design Build 2013-04-05 05:52:47.283
Active 008018 IM-0906(225) 090 I-90 Geiger Rd To Spokane Viaduct Pccp Rehab Pccp Acme Concrete Paving, Inc. $7,849,447.77 CHAD SIMONSON ER 10/21/10 10/28/10 11/22/10     $12,620,894.81 $7,849,447.77 $8,931,953.30 180 206.5 10.5 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008022 NH-0906(226) 090 I-90 Sullivan Rd To Barker Rd Additional Lanes Add Acme Concrete Paving, Inc. $14,949,578.24 DARREL MCCALLUM ER 11/10/10 12/13/10 12/22/10 06/11/12   $17,891,733.30 $14,949,578.24 $15,765,434.20 150 154.5 -26.5 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008029 STATE/LOCAL 823 Sr 823, Selah Vicinity - Reroute Highway (Re-Ad) Hurst Construction, Llc $3,573,162.05 JEFF MINNICK SC 11/10/10 11/18/10 12/08/10 05/10/12 06/06/12 $4,887,184.51 $3,573,162.05 $4,523,990.91 215 215 17 823 Design Bid Build 2013-04-05 05:52:47.283
Active 008031 STPF-0017(039) 017 Sr 17, Moses Lake Vicinity - Median Barrier Tri-State Construction, Inc. $1,257,232.00 PIERSON/PATRICK NC 11/18/10 11/22/10 12/13/10 10/06/11 10/11/11 $1,273,245.00 $1,257,232.00 $1,333,602.41 55 63 0 017 Design Bid Build 2013-04-05 05:52:47.283
Active 008033 STATE 012 Us 12, Sr 124 Intersection - Build Interchange Selland Construction, Inc. $11,478,642.61 MOE DAVARI SC 02/02/11 02/07/11 02/25/11 10/26/12   $15,614,038.38 $11,478,642.61 $12,388,141.95 300 300 13.5 012, 124 Design Bid Build 2013-04-05 05:52:47.283
Active 008047 STATE 005 I-5, Exit 111 Lacey Vic. Noise Walls Mowat Construction Company $2,867,054.20 MARYLOU NEBERGALL OR 01/05/11 01/10/11 01/28/11 02/03/12 02/04/13 $4,712,004.50 $2,867,054.20 $3,257,698.05 95 115 0 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008053 STATE 405 I-405, Ne 116th Street Interchange And Street Impr Gary Merlino Construction Co., Inc. $10,693,960.80 HIEN TRINH NW 02/02/11 02/28/11 03/25/11     $13,407,331.75 $10,693,960.80 $12,943,225.87 425 432.5 12.5 405 Design Bid Build 2013-04-05 05:52:47.283
Active 008055 NH-STPF-9999(611) 167 Sr 167 / I-405 I/C Vic To S Grady Way & Sr 509 / S Lakeside Industries $694,858.95 HIEN TRINH NW 01/05/11 01/14/11 02/01/11 09/29/11 12/05/11 $854,769.00 $694,858.95 $718,030.71 20 20 0 167, 509 Design Bid Build 2013-04-05 05:52:47.283
Active 008060 ER-0601(007) 530 Sr 530, Skaglund Hill Slide - Permanent Repair Vetch Construction Inc. $3,297,816.00 DAVE CRISMAN NW 01/12/11 02/11/11 02/25/11 11/05/12   $3,505,187.30 $3,297,816.00 $3,493,469.17 90 129 -10.5 530 Design Bid Build 2013-04-05 05:52:47.283
Active 008065 STATE 530 Sr 530, Sauk River Bank Erosion Realign Roadway Trimaxx Construction $2,480,567.66 HAMMER/SPAHR NW 01/12/11 01/18/11 02/04/11 12/14/11   $3,230,573.15 $2,480,567.66 $2,402,125.54 145 160 0 530 Design Bid Build 2013-04-05 05:52:47.283
Active 008066 BRNHSTPF0520(047) 520 Sr 520 / I-5 To Medina - Evergreen Point Floating Kiewit General Manson Joint Venture $586,561,000.00 DAVE BECHER Urban 08/10/11 08/11/11 08/31/11     $640,769,000.00 $586,561,000.00 $215,416,074.26 1,429 1,429 853 520 Design Build 2013-04-05 05:52:47.283
Active 008077 STATE 011 Sr 11, Chuckanut Park And Ride Interwest Construction Inc $3,198,800.80 HAMMER/SPAHR NW 02/02/11 02/10/11 03/07/11     $3,540,188.50 $3,198,800.80 $3,645,945.95 67 162 21 011 Design Bid Build 2013-04-05 05:52:47.283
Active 008079 NH-0500(016) 500 Sr 500, St. Johns Blvd - Interchange Tapani Underground, Inc. $27,237,397.12 LEON WINGER SW 03/02/11 04/29/11 05/20/11     $33,403,982.85 $27,237,397.12 $26,488,449.86 440 492.5 21 500 Design Bid Build 2013-04-05 05:52:47.283
Active 008080 STPF-BH-0099(101) 099 Sr 99, Aurora Ave - G Washington Memorial Br Seism Massana Construction, Inc. $6,157,383.00 JOHN CHI NW 02/24/11 04/05/11 04/27/11     $8,707,615.00 $6,157,383.00 $6,077,668.47 310 315 -114 099 Design Bid Build 2013-04-05 05:52:47.283
Active 008081 STPF-0020(165) 020 Sr 20, North Cascades Highway - Chip Seal Central Washington Asphalt, Inc. $2,664,395.23 PIERSON/PATRICK NC 02/17/11 02/22/11 03/08/11 09/13/11 09/19/11 $2,601,429.22 $2,664,395.23 $2,849,115.76 70 70 3 020 Design Bid Build 2013-04-05 05:52:47.283
Active 008086 STATE 542 Sr 542, Everson Goshen Rd Vic To Sr 9 Vic Intersec Boss Construction Inc $2,740,818.32 CHRIS DAMITIO NW 03/02/11 03/07/11 03/24/11 08/03/12 03/25/13 $3,485,512.50 $2,740,818.32 $2,698,826.46 106 106 -3 539, 542 Design Bid Build 2013-04-05 05:52:47.283
Active 008087 BH-0410(054) 410 Sr 410, White River Bridge - Bridge Scour Scarsella Bros., Inc. $217,236.75 JON DEFFENBACHER OR 02/24/11 03/03/11 03/17/11 12/07/11 02/01/13 $281,230.00 $217,236.75 $90,357.11 25 25 8 410 Design Bid Build 2013-04-05 05:52:47.283
Active 008101 STPE-1140(030) 219 Sr 519 / I-90 To Sr 519 Pedestrian Trail Tri-State Construction, Inc. $1,107,911.00 DAVE LINDBERG NW 03/23/11 04/05/11 04/27/11 11/01/11   $1,288,266.80 $1,107,911.00 $1,247,656.44 45 59 0 219 Design Bid Build 2013-04-05 05:52:47.283
Active 008102 IM-0053(955) 005 I-5, Express Lane Automation Elcon Corporation $3,419,556.00 JOHN CHI NW 03/30/11 04/04/11 04/28/11     $3,419,601.86 $3,419,556.00 $4,781,080.56 200 200 -52 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008105 STATE 014 Sr 14, Camas / Washougal - Add Lanes And Build Int Tapani Underground, Inc. $28,618,803.65 CHRIS TAMS SW 04/13/11 04/18/11 05/11/11     $34,500,833.10 $28,618,803.65 $25,546,561.20 360 369 22 014, 500 Design Bid Build 2013-04-05 05:52:47.283
Active 008113 BH-0518(011) 518 Sr 518, Bridges - Seismic Retrofit Graham Construction & Management, Inc. $3,707,899.00 ALETA BORSCHOWA NW 04/20/11 04/27/11 05/18/11 08/06/12   $4,197,734.50 $3,707,899.00 $3,377,105.75 235 245 0 518 Design Bid Build 2013-04-05 05:52:47.283
Active 008114 STPF-0515(013) 515 Sr 515/Sr 516 To Se 232nd St Vic Paving Lakeside Industries $1,394,858.88 HIEN TRINH NW 04/20/11 04/25/11 05/12/11 10/06/11 10/10/11 $1,679,449.00 $1,394,858.88 $1,560,509.35 70 70 0 515, 516 Design Bid Build 2013-04-05 05:52:47.283
Active 008119 NH-STPUS-0022(013 022 Sr 22/I-82 To Toppenish - Safety Improvements Granite Construction Company $2,144,144.00 BILL PRESTON SC 04/20/11 04/27/11 05/13/11 06/26/12 07/10/12 $2,270,401.25 $2,144,144.00 $2,539,360.18 80 99 -9 022 Design Bid Build 2013-04-05 05:52:47.283
Active 008127 STATE 090 I-90, Snowshed To Keechelus Dam Phase 1c - Replace Guy F. Atkinson Construction, Llc $177,144,342.66 WILL SMITH SC 07/27/11 08/19/11 08/19/11     $197,988,768.70 $177,144,342.66 $39,040,768.05 750 926 794 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008128 NICKEL 522 Sr 522, Snohomish River Bridge To Us 2 Vic Widenin Scarsella Bros., Inc. $73,138,890.32 JANICE FAHNING NW 05/18/11 05/26/11 06/16/11     $86,169,502.10 $73,138,890.32 $44,591,715.57 850 850 429.5 522 Design Bid Build 2013-04-05 05:52:47.283
Active 008129 NH-9999(620) 005 I-5 And Sr 16, Stormwater Retrofit Catworks Llc $471,404.50 NEAL UHLMEYER OR 05/04/11 05/09/11 06/01/11 11/07/11 11/14/12 $569,262.00 $471,404.50 $481,884.26 45 47 4 005, 016 Design Bid Build 2013-04-05 05:52:47.283
Active 008130 STPF-0020(164) 020 Sr 20, Barrier Creek Culvert Replacement Razz Construction, Inc. $1,521,958.00 HAMMER/SPAHR NW 05/04/11 05/09/11 05/18/11     $1,433,869.50 $1,521,958.00 $1,436,250.63 67 78 0 020 Design Bid Build 2013-04-05 05:52:47.283
Active 008139 BR-0002(283) 002 Us 2, Tumwater Canyon Bridge Replacements Selland Construction, Inc. $8,485,707.28 BOB ROMINE NC 05/19/11 06/24/11 07/13/11     $8,838,512.74 $8,485,707.28 $5,514,926.27 275 275 47 002 Design Bid Build 2013-04-05 05:52:47.283
Active 008140 STATE 009 Sr 9, 212th St Se To 176th St Se Stage 3 Widening Northwest Construction, Inc. $24,297,000.00 JOHN CHI NW 06/08/11 06/23/11 07/12/11     $32,543,138.80 $24,297,000.00 $14,388,903.38 505 505 176 009 Design Bid Build 2013-04-05 05:52:47.283
Active 008141 NH-0020(105) 020 Sr 20/Sr 525, Libbey Rd Vic To Sidney St Vic Reali Interwest Construction Inc $2,269,936.16 DAVE CRISMAN NW 05/18/11 05/23/11 06/13/11 11/09/11   $2,067,148.98 $2,269,936.16 $2,061,060.44 60 60 3 020, 525 Design Bid Build 2013-04-05 05:52:47.283
Active 008142 NH-0018(037) 018 Sr 18, Military Rd Vic To Auburn Black Diamond Rd Tucci & Sons, Inc. $1,182,402.24 HIEN TRINH NW 05/18/11 05/23/11 06/14/11 04/10/12 05/04/12 $1,337,801.75 $1,182,402.24 $1,128,906.41 45 45 0 018 Design Bid Build 2013-04-05 05:52:47.283
Active 008144 ER-0902(252)/(331 161 Sr 161, Mashel River Bridge - Bridge Scour And Slo Stan Palmer Construction, Inc. $1,612,149.00 JON DEFFENBACHER OR 05/25/11 05/31/11 06/21/11 03/06/13   $1,791,346.00 $1,612,149.00 $3,074,960.04 85 141 9 161 Design Bid Build 2013-04-05 05:52:47.283
Active 008145 IM-0052(204) 005 I-5 / Sr 121 To Tumwater Blvd Paving Granite Construction Company $1,839,306.00 MARYLOU NEBERGALL OR 05/25/11 05/31/11 06/21/11 11/10/11 01/06/12 $2,114,349.00 $1,839,306.00 $1,977,245.92 40 46.5 0 005, 121 Design Bid Build 2013-04-05 05:52:47.283
Active 008150 IM-0051(285) 005 I-5, E Fork Lewis River Bridge To Todd Road Vicini Granite Construction Company $4,250,250.00 LORI FIGONE SW 06/15/11 06/27/11 07/12/11     $5,157,579.39 $4,250,250.00 $4,584,699.95 60 74 0 005, 503 Design Bid Build 2013-04-05 05:52:47.283
Active 008153 STATE 005 I-5 / I-205, Ne 134th St Interchange (I-5 / I-205) Rotschy, Inc. $19,949,910.16 LEON WINGER SW 06/08/11 06/22/11 07/01/11 02/08/13   $20,598,245.39 $19,949,910.16 $20,431,907.91 175 192 0 005, 205 Design Bid Build 2013-04-05 05:52:47.283
Active 008166 NH0028(045) 028 Sr 28, E. End Of The George Sellar Br. Construct B Klb Construction Inc. $16,363,377.90 KEVIN WALIGORSKI NC 06/23/11 07/08/11 07/19/11     $15,772,791.07 $16,363,377.90 $13,875,401.07 270 301 61 028, 285 Design Bid Build 2013-04-05 05:52:47.283
Active 008177 NH-0002(313) 002 Us 2, Rice Road Intersection - Safety Improvements Lakeside/Tri-State Joint Venture $2,170,507.00 CHAD BROWN NW 08/24/11 09/07/11 10/05/11 07/02/12   $2,750,002.00 $2,170,507.00 $2,367,526.50 266 266 0 002 Design Build 2013-04-05 05:52:47.283
Active 008182 STPF-0020(165) 020 Sr 20, North Cascades Highway - Drainage Repair Trimaxx Construction $298,194.00 PIERSON/PATRICK NC 06/30/11 07/05/11 07/27/11 10/20/11 11/07/12 $386,444.00 $298,194.00 $266,623.30 22 22 0 020 Design Bid Build 2013-04-05 05:52:47.283
Active 008184 STATE 009 Sr 9, 212th St Se To 176th St Se Stage 3 Wetland M Tri-State Construction, Inc. $1,252,399.90 JOHN CHI NW 07/07/11 07/14/11 08/05/11 11/16/12   $2,190,755.50 $1,252,399.90 $1,001,328.96 125 125 0 009 Design Bid Build 2013-04-05 05:52:47.283
Active 008189 STATE 005 I-5 / Sr16, Eastbound Nalley Valley I/C - Hov Mowat Construction Company $74,687,777.28 NEAL UHLMEYER OR 08/31/11 09/22/11 10/13/11     $92,457,289.58 $74,687,777.28 $39,358,588.88 610 610 278.5 005, 016 Design Bid Build 2013-04-05 05:52:47.283
Active 008195 TIGER0395(091) 395 Us395 Nsc Parksmith Interchange Max J. Kuney Company $6,917,161.46 BOB HILMES ER 08/18/11 09/07/11 09/21/11 10/19/12   $6,801,315.50 $6,917,161.46 $7,190,802.53 185 185 -26 395 Design Bid Build 2013-04-05 05:52:47.283
Active 008198 STATE 519 Seattle Terminal Elect Distrib Sstm Upgrade System Mcclure And Sons Inc. $2,969,687.60 JOHN CALLAHAN WSF 08/17/11 08/24/11 09/21/11     $4,506,128.66 $2,969,687.60 $2,821,755.18 240 314 -4 519 Marine Terminal 2013-04-05 05:52:47.283
Active 008199 CM-0161(029) 161 Sr 161, 24th St East To Milton Way Widening Tri-State Construction, Inc. $11,927,623.80 JEFF COOK OR 08/10/11 08/17/11 09/07/11     $12,285,768.14 $11,927,623.80 $7,459,911.86 278 433 144 161 Design Bid Build 2013-04-05 05:52:47.283
Active 008204 STATE 405 I-405, Ne 6th St To I-5 Widening And Express Toll Flatiron Constructors Inc $155,500,001.00 LISA HODGSON NW 01/06/12 01/11/12 02/01/12     $249,999,996.00 $155,500,001.00 $38,829,293.19 1,330 1,330 922 405 Design Build 2013-04-05 05:52:47.283
Active 008216 STATE 009 Sr 9 / Sr 92 Intersection Improvements Design Buil Guy F. Atkinson Construction, Llc $3,346,888.00 SEEMA JAVERI NW 01/19/12 01/26/12 02/15/12 08/20/12   $3,919,498.49 $3,346,888.00 $3,494,226.18 237 237 0 009, 092 Design Build 2013-04-05 05:52:47.283
Active 008222 STATE 009 Sr 9/Sr 531, 172nd St Ne & Eaglefield Dr Intersect Interwest Construction Inc $4,995,958.40 HAMMER/SPAHR NW 11/09/11 11/18/11 12/08/11 01/24/13   $5,637,723.50 $4,995,958.40 $4,472,936.34 93 101 -0.5 009, 531 Design Bid Build 2013-04-05 05:52:47.283
Active 008223 NH-0901(466) 090 I-90, East Fork Issaquah Creek Fish Passage Tri-State Construction, Inc. $1,451,881.70 HIEN TRINH NW 11/02/11 11/07/11 11/28/11 11/21/12   $1,542,787.00 $1,451,881.70 $1,922,361.22 110 110 -4.5 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008229 NH-0002(282) 002 Us 2, Stevens Pass West Slope Stabilization Midwest Rockfall, Inc. $5,291,071.20 KEVIN WALIGORSKI NC 12/22/11 12/29/11 01/20/12     $6,202,171.00 $5,291,071.20 $2,695,973.76 230 230 122.5 002 Design Bid Build 2013-04-05 05:52:47.283
Active 008231 IMD-0051(268) 005 I-5, Columbia River Crossing Drilled Shaft And Dri Max J. Kuney Company $4,220,000.00 FRANK GREEN SW 12/14/11 12/19/11 01/09/12 11/21/12   $4,072,627.05 $4,220,000.00 $4,119,835.72 82 98.5 -17 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008232 STPF-0097(145) 097 Us 97a, 0.5 Mile So. Of Rocky Reach Dam Slope Stab Janod, Inc. $3,110,680.96 BOB ROMINE NC 12/21/11 12/29/11 01/26/12 06/20/12 07/02/12 $2,996,424.00 $3,110,680.96 $3,000,918.56 82 87.5 0 097 Design Bid Build 2013-04-05 05:52:47.283
Active 008234 NH-0101(325) 101 Us 101, S Of Beacon Point Dr Culvert Replacement Thompson Bros. Excavating, Inc. $260,401.25 JERRY MOORE OR 01/05/12 01/10/12 01/26/12 11/06/12   $297,574.00 $260,401.25 $241,030.34 45 45 0 101 Design Bid Build 2013-04-05 05:52:47.283
Active 008239 CBI-0055(240) 005 I-5, Samish Way And Northwest Ave To Birch Bay Lyn Valley Electric Co. Of Mt Vernon $5,343,782.60 CHRIS DAMITIO NW 02/08/12 03/21/12 04/10/12 12/07/12   $5,848,658.00 $5,343,782.60 $5,243,955.81 65 71 1 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008240 ER-1001(003) 410 Sr 410, Nile Valley Landslide - Re-Construct Route Apollo, Inc. $4,083,066.15 JEFF MINNICK SC 01/25/12 02/07/12 02/21/12     $6,254,481.75 $4,083,066.15 $4,307,265.10 100 111 4 410 Design Bid Build 2013-04-05 05:52:47.283
Active 008241 CBI0021,STPF0021019 021 Sr21 Curlew St Pk To N Of Rincon Cr Rd Pave N Of R Poe Asphalt Paving, Inc. $4,235,606.62 CHAD SIMONSON ER 01/26/12 01/26/12 02/24/12 10/25/12   $4,581,555.90 $4,235,606.62 $3,954,497.83 44 45 3.5 021 Design Bid Build 2013-04-05 05:52:47.283
Active 008244 BR-NH-0097(084) 097 Us 97, Satus Creek Vicinity - Replace Br. 97/106 A William Charles Construction, Llc $8,830,731.60 MOE DAVARI SC 02/08/12 02/13/12 03/05/12     $8,788,576.51 $8,830,731.60 $6,785,546.79 177 183 25.5 097 Design Bid Build 2013-04-05 05:52:47.283
Active 008246 HP-0501(022) 501 Sr 501, Ridgefield Interchange Stage Ii - Roadway Nutter Underground Utilities, Inc. $2,823,532.22 CHRIS TAMS SW 03/07/12 03/15/12 04/04/12 10/23/12 12/12/12 $2,975,111.90 $2,823,532.22 $3,476,408.57 90 117 0 501 Design Bid Build 2013-04-05 05:52:47.283
Active 008250 IBRD-9999(509) 005 I-5, North 45th St Vicinity Sign Bridge Replacemen M J Hughes Construction $376,213.00 JOHN CHI NW 02/23/12 02/27/12 03/19/12 11/14/12 11/29/12 $401,861.00 $376,213.00 $624,072.03 34 44 2 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008252 STATE 020 Sr20 Vehicle Reservation Ph1 Its Systems Its Syste Valley Electric Co. Of Mt Vernon $696,460.00 HAMMER/SPAHR NW 03/07/12 03/15/12 04/13/12 01/18/13   $741,157.00 $696,460.00 $771,922.65 40 49 11 005, 020, 525 Marine Terminal 2013-04-05 05:52:47.283
Active 008254 STATE 020 Sr 20, Port Townsend Ferry Terminal Slip 1 Transfe American Construction Co., Inc. $2,027,079.00 JOHN CALLAHAN WSF 03/14/12 03/20/12 04/10/12     $1,640,308.00 $2,027,079.00 $1,745,230.00 144 144 -81 020 Marine Terminal 2013-04-05 05:52:47.283
Active 008258 BH-0901(481) 090 I-90 / Sr 18 Interchange Wb Bridge Bridge Deck Reh C.A. Carey Corporation $459,481.50 HIEN TRINH NW 03/28/12 04/04/12 04/24/12 06/30/12 07/06/12 $510,006.00 $459,481.50 $432,752.38 25 25 0 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008260 ER-0801(007) 405 I-405 / Sr 167, Thunder Hills Creek Mitigation Fis Scarsella Bros., Inc. $3,164,254.80 SEEMA JAVERI NW 03/28/12 04/06/12 04/27/12     $3,212,221.00 $3,164,254.80 $3,149,264.44 100 100 0 405 Design Bid Build 2013-04-05 05:52:47.283
Active 008261 BH-0010(010) 010 Sr 10, Bristol Fill Bridge Deck Replacement Conway Construction Company $1,375,769.80 MOE DAVARI SC 04/04/12 04/10/12 04/30/12 11/14/12 12/11/12 $2,363,118.50 $1,375,769.80 $1,283,693.06 110 114 0 010 Design Bid Build 2013-04-05 05:52:47.283
Active 008263 IM-0053(965) 005 I-5, Mounts Rd Vicinity To Berkley St Median Barri Construction Ahead, Inc. Dba $1,008,538.71 DENNIS ENGEL OR 04/04/12 04/16/12 05/07/12 10/09/12 10/09/12 $1,169,466.65 $1,008,538.71 $991,299.94 25 25 -0.5 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008266 NH-0012(208) 012 Us12 Stabilize Slopes Clear Creek Vic Ais Construction Company $1,951,774.31 BILL PRESTON SC 04/11/12 05/11/12 06/06/12     $1,832,141.00 $1,951,774.31 $634,366.09 85 85 38 012 Design Bid Build 2013-04-05 05:52:47.283
Active 008267 BH-0008(013) 101 Sr 8 / Us 101 Overcrossing - Seismic Retrofit M J Hughes Construction $545,208.00 DENNIS ENGEL OR 04/11/12 04/17/12 05/07/12 10/17/12 11/19/12 $699,388.50 $545,208.00 $658,500.46 45 72.5 -7 008, 101 Design Bid Build 2013-04-05 05:52:47.283
Active 008268 STATE 009 Sr 9, 176th St Se Vic To Sr 96 Paving Cemex Construction Materials    Pacific $2,508,376.28 JOHN CHI NW 04/18/12 04/23/12 05/14/12     $2,667,995.00 $2,508,376.28 $2,213,739.23 91 91 12 009 Design Bid Build 2013-04-05 05:52:47.283
Active 008269 STATE 530 Sr 530, Fortson Creek Culvert - Fish Barrier Ram Construction Gen Contractors $811,871.00 DAVE CRISMAN NW 04/11/12 04/18/12 05/09/12 10/30/12   $1,337,641.44 $811,871.00 $823,232.98 33 33 0.5 530 Design Bid Build 2013-04-05 05:52:47.283
Active 008270 NH-0002(829) 002 Us 2, Stevens Pass Variable Message Signs Colvico, Inc. $1,407,513.00 KEVIN WALIGORSKI NC 04/19/12 04/30/12 05/24/12     $1,396,448.64 $1,407,513.00 $1,436,369.32 45 52 2 002 Design Bid Build 2013-04-05 05:52:47.283
Active 008272 STATE 005 I-5, Mellen Street To Blakeslee Junction - Stage 1 Cascade Bridge, Llc $21,596,149.85 COLIN NEWELL SW 04/25/12 04/30/12 05/21/12     $27,943,652.95 $21,596,149.85 $19,623,284.96 300 325 57.5 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008276 NH-9999(632) 005 I-5, Lewis County Detour For Freight Mobility Its Mill Plain Electric $1,335,692.00 CHAD HANCOCK SW 05/16/12 05/24/12 06/14/12 01/04/13 03/22/13 $1,521,504.00 $1,335,692.00 $1,323,342.07 70 78 0 005, 006, 007, 012, 161, 508, 512, 706 Design Bid Build 2013-04-05 05:52:47.283
Active 008278 NH-0014(604) 014 Sr 14, Clark Co Line To Prindle Vic. Paver Kerr Contractors,Inc. $2,123,175.00 CHRIS TAMS SW 04/25/12 04/30/12 05/21/12 10/18/12 12/14/12 $2,127,904.50 $2,123,175.00 $2,184,994.15 50 52 0 014 Design Bid Build 2013-04-05 05:52:47.283
Active 008279 IM-0054(282) 005 I-5, Dayton Ave N To 128th St Sw Its Rehabilitatio Elcon Corporation $1,291,496.00 MARK SAWYER NW 04/25/12 04/30/12 05/21/12 01/08/13 02/06/13 $1,817,156.00 $1,291,496.00 $1,279,362.71 70 70 0 005, 099 Design Bid Build 2013-04-05 05:52:47.283
Active 008280 IM-0053(964) 005 I-5, 48th St To M St Bridge Concrete Pavement Reha C.A. Carey Corporation $2,233,510.00 JON DEFFENBACHER OR 05/16/12 05/21/12 06/13/12 09/26/12 03/29/13 $1,674,787.75 $2,233,510.00 $2,179,534.46 55 55 0 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008286 NH-0002(311) 002 Us 2, Bickford Ave I/C Safety And Culvert Replacem Granite Construction Company $14,311,311.00 MARK SAWYER NW 05/09/12 06/08/12 06/11/12     $15,490,448.45 $14,311,311.00 $7,674,242.53 300 308 155 002 Design Bid Build 2013-04-05 05:52:47.283
Active 008288 STATE 520 Sr 520, Evans Creek Eastside Wetland Mitigation Goodfellow Bros Inc $3,856,069.00 ALETA BORSCHOWA NW 05/09/12 05/17/12 06/11/12     $5,055,879.25 $3,856,069.00 $511,426.43 215 215 124 520 Design Bid Build 2013-04-05 05:52:47.283
Active 008289 NH0195(053) 195 Babbit Road To Colfax Paving Central Washington Asphalt, Inc. $1,961,182.40 DARREL MCCALLUM ER 05/03/12 05/10/12 06/04/12     $2,303,988.91 $1,961,182.40 $1,889,834.18 34 34 0 195 Design Bid Build 2013-04-05 05:52:47.283
Active 008290 BR-0099(119) 099 Sr 99, Awv S Holgate St To S King St Stage 3 - Atl Guy F. Atkinson Construction, Llc $29,371,123.00 PAUL JOHNSON NW 05/23/12 05/30/12 06/20/12     $35,642,736.50 $29,371,123.00 $12,005,162.42 410 410 235 099 Design Bid Build 2013-04-05 05:52:47.283
Active 008292 BR-0101(312) 101 Us 101, Bone River Bridge Replace Bridge Cascade Bridge, Llc $5,715,393.20 LORI FIGONE SW 05/16/12 05/24/12 06/15/12     $6,317,645.00 $5,715,393.20 $3,821,340.21 220 220 66 101 Design Bid Build 2013-04-05 05:52:47.283
Active 008293 STATE 097 Us 97, North Of Goldendale, Wildlife Habitat Conne Rotschy, Inc. $2,113,354.68 CHRIS TAMS SW 05/16/12 05/21/12 06/11/12     $2,106,341.00 $2,113,354.68 $1,789,754.33 145 145 27.5 097 Design Bid Build 2013-04-05 05:52:47.283
Active 008294 IM0905(101) 090 Bn Rr Br To Vic Geiger Rd Paving Inland Asphalt Company $1,667,683.18 DARREL MCCALLUM ER 05/17/12 06/12/12 07/05/12 09/11/12 11/06/12 $2,273,276.00 $1,667,683.18 $1,722,946.45 30 31 1 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008295 BH-0395(096) 395 Us 395, Pioneer Memorial Bridge Joint Repair C.A. Carey Corporation $1,141,183.00 MOE DAVARI SC 05/09/12 05/17/12 06/08/12 12/02/12 12/02/12 $777,977.00 $1,141,183.00 $1,139,860.00 20 20 -7 395 Design Bid Build 2013-04-05 05:52:47.283
Active 008296 NH0395(098) 395 Nsc Francis Avenue Improvements Graham Construction & Management, Inc. $14,045,942.90 DARREL MCCALLUM ER 06/21/12 08/03/12 08/23/12     $15,958,985.00 $14,045,942.90 $3,986,552.07 350 350 226 395 Design Bid Build 2013-04-05 05:52:47.283
Active 008299 STATE 502 Sr 502 / I-5 To Battle Ground Add Lanes Stage 1 Tapani Underground, Inc. $5,194,042.60 CHRIS TAMS SW 05/31/12 06/06/12 06/26/12     $7,151,300.75 $5,194,042.60 $5,298,106.51 75 75 -9 502 Design Bid Build 2013-04-05 05:52:47.283
Active 008301 BH-0012(218) 012 Us 12 Et Al, 2012 Scr Region Wide Deck Rehabilitat Penhall Company $1,264,595.15 JEFF MINNICK SC 05/23/12 06/06/12 06/26/12 11/02/12 11/02/12 $1,569,149.25 $1,264,595.15 $1,350,816.82 65 65 0.5 012, 022, 261 Design Bid Build 2013-04-05 05:52:47.283
Active 008302 STPF-9999(646) 012 Us 12 Et Al, 2010-2011 Scr Region Wide Safety Coral Construction Company $849,929.00 MOE DAVARI SC 05/23/12 05/29/12 06/20/12 09/27/12 12/12/12 $800,661.65 $849,929.00 $897,270.65 40 40 -6.5 012, 022, 024, 082, 097, 124, 223, 240, 821, 823 Design Bid Build 2013-04-05 05:52:47.283
Active 008303 BH-0529(018) 529 Sr 529, Sb Snohomish River Bridge Special Bridge R Pcl Civil Constructors Inc $1,711,104.00 MARK SAWYER NW 05/23/12 05/29/12 06/19/12     $2,898,854.00 $1,711,104.00 $0.00 35 35 1 529 Design Bid Build 2013-04-05 05:52:47.283
Active 008304 STPF-0100(011) 100 Sr 100/Sr 100 Spur - Paving Granite Construction Company $747,747.00 LORI FIGONE SW 05/23/12 05/29/12 06/15/12 09/25/12 01/10/13 $665,178.30 $747,747.00 $685,622.28 23 24 0 100 Design Bid Build 2013-04-05 05:52:47.283
Active 008305 STPF-0503(025) 503 Sr 503, Ham Rd Vic To Rudy Ross Rd Vic Resurfacing Granite Construction Company $1,849,849.00 LORI FIGONE SW 05/23/12 05/29/12 06/15/12 09/11/12 11/05/12 $1,833,417.01 $1,849,849.00 $1,771,471.65 38 38 0 503 Design Bid Build 2013-04-05 05:52:47.283
Active 008306 NH-STPF-9999(597) 002 Sr Us 2/97, Sr 97a, West Of Wenatchee Paving And I Central Washington Asphalt, Inc. $2,891,203.15 BOB ROMINE NC 05/17/12 05/24/12 06/13/12     $2,655,685.10 $2,891,203.15 $2,902,817.77 65 67 -18 002, 097, 285 Design Bid Build 2013-04-05 05:52:47.283
Active 008307 HSIP-0096(004) 096 Sr 96, Dumas Road Channelization Marshbank Construction, Inc $297,788.50 MARK SAWYER NW 05/31/12 06/06/12 06/29/12 11/03/12 12/21/12 $308,066.00 $297,788.50 $242,713.49 20 20 0 096 Design Bid Build 2013-04-05 05:52:47.283
Active 008308 HP-9999(415) 182 I-182 / I-90, Rd 100 Vic. And N Bend To Ellensburg Aztech Electric, Inc. $1,748,420.86 JEFF MINNICK SC 05/31/12 06/06/12 06/25/12     $1,950,184.50 $1,748,420.86 $1,423,177.58 80 90 22 182 Design Bid Build 2013-04-05 05:52:47.283
Active 008310 STATE 285 Sr 285, W End Of George Sellar Bridge Intersection Selland Construction, Inc. $9,787,325.01 BOB ROMINE NC 06/14/12 06/18/12 07/09/12     $10,182,525.01 $9,787,325.01 $4,162,865.40 255 255 132.25 028, 285 Design Bid Build 2013-04-05 05:52:47.283
Active 008311 STATE 005 I-5 / I-205, Ne 134th St. Interchange(I-5/I-205) S Max J. Kuney Company $43,416,928.50 LEON WINGER SW 06/20/12 06/29/12 07/19/12     $51,761,282.71 $43,416,928.50 $14,865,739.74 480 480 330 005, 205 Design Bid Build 2013-04-05 05:52:47.283
Active 008312 NH-0101(338)(340) 101 Us 101 / Sr 110, State Highways In Clallam County Granite Construction Company $2,784,000.00 SCOTTY IRELAND OR 05/31/12 06/06/12 06/26/12 10/19/12 10/22/12 $2,818,249.05 $2,784,000.00 $2,630,443.08 60 60 0 101, 110 Design Bid Build 2013-04-05 05:52:47.283
Active 008314 IM-0053(961) 005 I-5, Military Rd To Ne 117th St Pavement Repair Interstate Improvement, Inc. $5,004,744.22 HIEN TRINH NW 06/06/12 06/11/12 07/03/12     $4,831,928.05 $5,004,744.22 $3,387,097.95 96 96 40 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008318 STATE 005 Toutle River Sra Water System Repairs Construction Solutions, Inc. $130,850.80 Not Specified HQ 06/06/12 06/11/12 07/06/12     $126,100.00 $130,850.80 $140,568.78 130 0 0 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008320 BH0395(097) 395 Us395 Col River Bridge Deck Rehab Bridge Deck Razz Construction, Inc. $1,165,284.00 BOB HILMES ER 06/14/12 06/20/12 06/27/12 11/26/12 11/26/12 $1,580,808.60 $1,165,284.00 $1,504,525.57 60 75 -24 395 Design Bid Build 2013-04-05 05:52:47.283
Active 008321 BH-0006(022) 006 Sr 6, Chehalis River Riverside Bridge - Deck Overl Quigg Bros. Inc. $350,492.50 COLIN NEWELL SW 06/13/12 06/18/12 07/09/12 09/12/12 09/12/12 $358,693.45 $350,492.50 $294,545.17 15 15 8 005, 006, 101 Design Bid Build 2013-04-05 05:52:47.283
Active 008323 STATE 016 Sr 16 / I-5, Two Year Plant Establishment Terra Dynamics, Inc $300,223.00 MARYLOU NEBERGALL OR 05/25/12 05/29/12 06/18/12     $287,589.00 $300,223.00 $144,511.86 60 0 0 005, 016 Design Bid Build 2013-04-05 05:52:47.283
Active 008325 STATE 005 I-5, Port Of Tacoma Rd To King Co Line Floodplain Scarsella Bros., Inc. $478,358.90 MARY LOU NEBERGALL OR 06/20/12 06/25/12 07/16/12 12/21/12   $557,648.75 $478,358.90 $462,826.46 25 28 2.5 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008328 NH-HSIP-0014(040) 014 Sr 14, Marble Rd Vic Safety Improvements Nutter Underground Utilities, Inc. $3,835,534.22 CHRIS TAMS SW 06/27/12 07/18/12 07/31/12     $3,844,523.35 $3,835,534.22 $2,500,452.69 70 70 10.5 014 Design Bid Build 2013-04-05 05:52:47.283
Active 008329 CM0906(219) 090 I90 Vic Idaho Rd-State Line Its Colvico, Inc. $530,434.00 DARREL MCCALLUM ER 06/28/12 07/09/12 08/06/12     $478,979.00 $530,434.00 $240,499.32 66 66 59 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008331 STATE 020 Lopez Island Term Trestl Rehab Timber Trestle Reha Interwest Construction Inc $264,868.50 JOHN CALLAHAN WSF 06/27/12 07/02/12 07/23/12     $287,055.00 $264,868.50 $21,136.00 40 40 21 020 Marine Terminal 2013-04-05 05:52:47.283
Active 008333 STATE 020 Pt Townsend Transfer Span Replace Transfer Span Re American Construction Co., Inc. $3,068,815.00 JOHN CALLAHAN WSF 07/11/12 07/17/12 08/09/12     $2,616,081.50 $3,068,815.00 $2,041,181.75 133 133 25.5 020 Marine Terminal 2013-04-05 05:52:47.283
Active 008334 HSIP-0507(023) 507 Sr 507, 8th Ave S To 208th St E Safety Miles Resources Dba Woodworth & Co $889,752.75 MARYLOU NEBERGALL OR 07/05/12 07/09/12 07/30/12     $992,886.25 $889,752.75 $865,005.00 45 45 1 507 Design Bid Build 2013-04-05 05:52:47.283
Active 008335 IM-0901(483) 090 I-90, Asahel Curtis Vicinity Eb - Culvert Repair Trimaxx Construction $323,524.50 JEFF MINNICK SC 07/05/12 07/09/12 07/30/12 10/04/12 10/17/12 $305,771.00 $323,524.50 $307,970.35 28 28 4 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008338 STATE 028 I-90 / Sr 28, Ncr Major Electrical 2012 Aztech Electric, Inc. $395,403.75 KEVIN WALIGORSKI NC 07/12/12 07/16/12 08/06/12 03/01/13   $489,179.00 $395,403.75 $395,399.75 50 50 0 028, 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008341 STATE 002 Sr2 Update Ped Fac To Meet Ada Stndrds Cameron-Reilly, Llc $204,209.80 DARREL MCCALLUM ER 07/12/12 07/18/12 08/03/12     $201,649.50 $204,209.80 $217,851.03 35 36.5 1.5 002, 395 Design Bid Build 2013-04-05 05:52:47.283
Active 008342 STATE 021 S Nanamkin Crk Culvert Replace Nt West Company, Inc. $597,957.50 DARREL MCCALLUM ER 07/26/12 07/31/12 08/20/12     $685,982.70 $597,957.50 $69,285.00 30 0 0 021 Design Bid Build 2013-04-05 05:52:47.283
Active 008344 BR-0101(207) 101 Us 101, Middle Nemah Riv Br. Replace Bridge Sb Structures, Llc $3,253,051.05 LORI FIGONE SW 07/25/12 07/31/12 08/10/12     $3,367,988.50 $3,253,051.05 $0.00 224 224 224 101 Design Bid Build 2013-04-05 05:52:47.283
Active 008345 BR-0105(022) 105 Sr 105, Smith Creek And North River Replace Bridge Scarsella Bros., Inc. $15,345,188.11 LORI FIGONE SW 08/22/12 08/31/12 09/25/12     $16,577,947.78 $15,345,188.11 $4,688,451.42 355 355 252 105 Design Bid Build 2013-04-05 05:52:47.283
Active 008346 NH-0902(437) 090 I-90, S Cle Elum Rd Bridge Eb - Approach Slab Repa M J Hughes Construction $299,193.00 JEFF MINNICK SC 07/25/12 07/30/12 08/20/12 11/08/12 11/08/12 $347,051.00 $299,193.00 $277,086.51 16 16 2 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008351 9999(631) 906 Sr 906, Travelers Rest Building Renovation Thornberg Construction Company, $390,364.00 Not Specified HQ 07/25/12 07/30/12 08/29/12     $338,500.00 $390,364.00 $405,826.17 90 0 0 906 Design Bid Build 2013-04-05 05:52:47.283
Active 008352 IM-0053(960) 005 I-5, Spokane Street Interchange Vic Special Bridge Mowat Construction Company $2,400,400.00 ALETA BORSCHOWA NW 08/08/12 08/15/12 09/04/12     $2,562,993.00 $2,400,400.00 $1,322,767.08 120 120 36 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008354 BH-0012(216) 012 Us 12, Railroad Bridge Seismic Retrofit Massana Construction, Inc. $150,288.00 SCOTTY IRELAND OR 08/08/12 08/14/12 09/06/12 02/01/13 02/06/13 $204,754.00 $150,288.00 $148,650.22 30 30 0 012 Design Bid Build 2013-04-05 05:52:47.283
Active 008358 STATE 161 Sr 161, Ohop Valley Extension Rd To S. Of 304th St Totem Electric Of Tacoma, Inc. $864,988.71 DENNIS ENGEL OR 08/08/12 08/14/12 09/04/12     $867,488.40 $864,988.71 $913,049.80 45 69 9 161 Design Bid Build 2013-04-05 05:52:47.283
Active 008361 STATE 020 Sr 20, West Of Twisp Wire Mesh Repair Hi-Tech Rockfall Construction, Inc. $158,851.00 KEVIN WALIGORSKI NC 08/16/12 08/20/12 09/11/12 10/18/12 10/18/12 $153,404.00 $158,851.00 $162,597.26 15 15 2 020 Design Bid Build 2013-04-05 05:52:47.283
Active 008362 STATE 002 Us 2 Et Al, Statewide Durable Striping Re-Advertis Specialized Pavement Marking, Inc. $1,874,250.67 JEFF MINNICK SC 08/15/12 08/20/12 09/11/12     $2,388,409.25 $1,874,250.67 $1,602,824.60 40 40 17 002, 005, 012, 205, 240, 395 Design Bid Build 2013-04-05 05:52:47.283
Active 008363 STATE 009 Sr 9, Pilchuck Creek Replace Bridge Granite Construction Company $8,891,323.69 DAVE CRISMAN NW 09/19/12 10/09/12 10/29/12     $12,204,445.60 $8,891,323.69 $371,053.86 270 270 270 009 Design Bid Build 2013-04-05 05:52:47.283
Active 008366 STPE-0104(047) 104 Sr 104, Hood Canal Bridge Shoulder Retrofit Razz Construction, Inc. $916,323.00 JEFF COOK OR 08/29/12 09/13/12 10/03/12 03/11/13   $956,923.00 $916,323.00 $835,947.28 50 50 -32.5 104 Design Bid Build 2013-04-05 05:52:47.283
Active 008368 STPF9999(637) 021 Sr 21 Et Al, Eastern Region - Safety Res Frank Gurney, Inc. $1,273,710.25 DARREL MCCALLUM ER 09/20/12 10/05/12 11/02/12     $1,607,796.50 $1,273,710.25 $52,260.46 75 75 70 021, 027, 028, 194, 231, 260, 261, 263, 271, 272, 274, 278 Design Bid Build 2013-04-05 05:52:47.283
Active 008369 IM-0052(206) 005 I-5, Barnes Road And Us 12 Interchanges Illuminati Travers Electric Inc. $179,997.10 LORI FIGONE SW 08/29/12 09/04/12 09/28/12     $253,559.00 $179,997.10 $0.00 27 27 17 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008371 ER(NH)-1201(001) 090 I-90, Raging River Bridge Vicinity Slope Stablizat Carter & Company Inc  Dba $354,900.25 HIEN TRINH NW 09/19/12 09/20/12 10/10/12 02/08/13   $490,007.00 $354,900.25 $345,448.00 30 30 0 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008375 BH-0024(018) 024 Sr 24, S Of Othello Sagehill Wasteway Deck Repair Penhall Company $312,822.50 KEVIN WALIGORSKI NC 10/11/12 10/16/12 11/28/12     $235,544.00 $312,822.50 $0.00 20 20 20 024 Design Bid Build 2013-04-05 05:52:47.283
Active 008376 BR-NH-0101(307) 101 Us 101, Shore Rd To Kitchen-Dick Rd Widening Scarsella Bros., Inc. $27,069,690.00 JERRY MOORE OR 11/07/12 11/21/12 12/11/12     $33,989,672.79 $27,069,690.00 $879,686.41 543 543 485 101 Design Bid Build 2013-04-05 05:52:47.283
Active 008377 BH-0020(170) 020 Sr 20, Snc Railroad Bridge Seismic Retrofit Nordland Construction $204,776.00 JERRY MOORE OR 10/17/12 10/22/12 12/03/12 03/25/13 03/25/13 $228,192.50 $204,776.00 $135,744.00 54 54 0 020 Design Bid Build 2013-04-05 05:52:47.283
Active 008378 HSIP0195(054) 195 Cheney-Spokane Road New I/C - New Interchange Selland Construction, Inc. $6,408,374.60 CHAD SIMONSON ER 11/01/12 11/09/12 12/07/12     $8,374,454.20 $6,408,374.60 $165,898.90 150 150 138 195 Design Bid Build 2013-04-05 05:52:47.283
Active 008379 BH/STPF0099(102) 099 Spokane St O/Cross Timber Replace Mid-Mountain Contractors, Inc. $9,213,158.00 HIEN TRINH NW 11/15/12 11/29/12 12/19/12     $12,395,530.00 $9,213,158.00 $1,028,594.25 310 310 255 099 Design Bid Build 2013-04-05 05:52:47.283
Active 008380 BH0016(025) 016 Tnb Special Repair Mowat Construction Company $434,604.00 MARYLOU NEBERGALL OR 10/31/12 11/07/12 11/28/12     $380,784.00 $434,604.00 $0.00 10 0 0 016 Design Bid Build 2013-04-05 05:52:47.283
Active 008381 CM-HSIP-STPE0099(110 099 Sr 99, Lincoln Way Vic To Airport Rd Vic Sb Sidewa Interwest Construction Inc $1,278,347.10 MARK SAWYER NW 12/12/12 12/17/12 01/08/13     $1,248,573.40 $1,278,347.10 $0.00 80 0 0 099 Design Bid Build 2013-04-05 05:52:47.283
Active 008383 IM0906229 090 I-90, Spokane Viaduct Latah Creek To Divison St - Northeast Electric, Llc $1,193,973.67 BOB HILMES ER 11/15/12 11/21/12 12/12/12     $1,428,293.00 $1,193,973.67 $194,231.20 75 75 46 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008384 STATE 020 Sr 20, Challenger Rd Vicinity - Unstable Slope Uns Trimaxx Construction $354,903.50 SHANE SPAHR NW 11/07/12 11/14/12 12/11/12     $377,786.00 $354,903.50 $0.00 20 20 11 020 Design Bid Build 2013-04-05 05:52:47.283
Active 008385 NH0002(825) 002 Us2 E Of Coles Corner Box Culvert Box Culvert Selland Construction, Inc. $644,193.20 ROBERT ROMINE NC 12/06/12 12/11/12 12/31/12     $929,103.00 $644,193.20 $0.00 30 0 0 002 Design Bid Build 2013-04-05 05:52:47.283
Active 008386 IM0906(228) 090 I-90 Div St To Lib Park Illumin Rebuild Liberty Pa Northeast Electric, Llc $1,196,590.00 BOB HILMES ER 12/06/12 12/13/12 01/03/13     $1,010,262.00 $1,196,590.00 $61,638.00 60 60 60 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008387 STPF0101(345) 101 Us 101, Commercial Street Signal Replacement Mill Plain Electric $339,135.00 Not Specified SW 12/19/12 12/24/12 01/14/13     $455,026.00 $339,135.00 $0.00 36 36 36 101 Design Bid Build 2013-04-05 05:52:47.283
Active 008388 HSIP9999(440) 005 I-5 Or Redirectional Landform Mitig Mitigation Petersen Brothers, Inc. $179,962.01 DENNIS ENGEL OR 12/05/12 12/10/12 12/31/12 03/20/13   $195,159.00 $179,962.01 $154,654.01 12 12 0 005, 016 Design Bid Build 2013-04-05 05:52:47.283
Active 008390 HSIP-0016(026) 016 Sr 16, S Of Burnham Dr To Sr 302 Safety Improvemen Petersen Brothers, Inc. $286,732.50 JEFF COOK OR 11/28/12 12/03/12 12/14/12   02/22/13 $401,555.00 $286,732.50 $285,574.15 22 22 7 016 Design Bid Build 2013-04-05 05:52:47.283
Active 008392 NHHSIP0097(160) 097 Us97 N Of Daroga State Park Turn Lanes Turn Lanes Selland Construction, Inc. $227,055.00 ROBERT ROMINE NC 11/29/12 12/10/12 12/31/12     $289,101.50 $227,055.00 $0.00 25 0 0 097 Design Bid Build 2013-04-05 05:52:47.283
Active 008393 IM/NHS-9999(460) 405 Concrete Pavement Rehabilitation Guy F. Atkinson Construction, Llc $7,277,888.00 JANICE FAHNING NW 02/07/13 02/12/13 03/04/13     $8,300,000.00 $7,277,888.00 $0.00 247 247 223 405, 518 Design Build 2013-04-05 05:52:47.283
Active 008394 CM9999(639) 090 Variable Message Signs Replacement Replacement - I Colvico, Inc. $790,104.00 BOB HILMES ER 12/13/12 12/20/12 01/11/13     $758,604.00 $790,104.00 $0.00 60 0 0 002, 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008395 BH0904(121) 090 I90 2013 Er Bridge Deck Replace Mowat Construction Company $497,991.50 Not Specified ER 12/20/12 01/02/13 01/22/13     $666,666.20 $497,991.50 $0.00 30 0 0 090 Design Bid Build 2013-04-05 05:52:47.283
Active 008397 STPF0009(067) 009 Sr 9, Np Creek Fish Passage Barrier Removal Stremler Gravel Inc 250 Bay-Lyn Drive 98 $351,486.00 SHANE SPAHR NW 01/09/13 01/14/13 02/05/13     $521,000.00 $351,486.00 $0.00 19 0 0 009 Design Bid Build 2013-04-05 05:52:47.283
Active 008399 NH0832(093) 082 Us12 To Valley Mall Vic Paving Paving Columbia Asphalt & Gravel, Inc. $2,671,716.65 BILL PRESTON SC 01/16/13 01/22/13 02/13/13     $3,039,628.50 $2,671,716.65 $0.00 51 51 51 082 Design Bid Build 2013-04-05 05:52:47.283
Active 008402 FBD0021(022) 021 Keller Ferry Terminal Rehab Terminal Rehabilitatio Max J. Kuney Company $1,930,000.00 BOB HILMES ER 01/24/13 01/31/13 02/20/13     $1,885,624.00 $1,930,000.00 $0.00 60 60 60 021 Marine Terminal 2013-04-05 05:52:47.283
Active 008403 IM-4053(962) 405 Nb Sr167 Ramp-Nb 405 Major Drainage Rep Major Drai Active Construction Inc. $489,405.21 Not Specified NW 01/24/13 02/01/13 03/05/13     $504,021.00 $489,405.21 $0.00 32 0 0 405 Design Bid Build 2013-04-05 05:52:47.283
Active 008404 STPF0730(003) 730 Us730 Spur Paving - Paving Inland Asphalt Company $1,332,332.32 MOE DAVARI SC 01/30/13 02/08/13 02/28/13     $1,455,759.00 $1,332,332.32 $0.00 35 35 35 730 Design Bid Build 2013-04-05 05:52:47.283
Active 008405 IM0053(940) 005 Sign Replace/Lane Electrical & Express Lane Electr Valley Electric Co. Of Mt Vernon $4,878,672.00 HIEN TRINH NW 01/16/13 01/29/13 02/19/13     $4,611,226.91 $4,878,672.00 $0.00 170 170 157 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008406 IM0053(968) 005 Sr510-Sr512 Its Fiber Improvements I-5 Magnum Power Llc 6902 Ne 219th St, Battl $1,104,454.09 MARYLOU NEBERGALL OR 01/24/13 02/04/13 02/25/13     $1,339,355.00 $1,104,454.09 $8,058.82 85 85 75 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008407 CMAQ2009(39) 005 I5 Traveler Info/Incident Mgmt Ph2 Incident Manage Northeast Electric, Llc $157,534.00 Not Specified SW 01/09/13 01/10/13 01/30/13     $169,498.00 $157,534.00 $0.00 12 0 0 005 Design Bid Build 2013-04-05 05:52:47.283
Active 008408 GBT8081 163 Pt Defiance/Tahlequa Trans Span O/Lays Physical Se Dalton Electric Co. $399,949.00 Not Specified WSF 01/09/13 01/18/13 02/20/13     $451,054.00 $399,949.00 $0.00 70 70 58 163 Marine Terminal 2013-04-05 05:52:47.283
Active 008409 CBI0097(155) 097 N Ov Riverside Nb Passing Lane Nb Passing Lane Selland Construction, Inc. $829,108.19 KEVIN WALIGORSKI NC 01/10/13 01/14/13 02/04/13     $957,729.80 $829,108.19 $0.00 35 35 35 097 Design Bid Build 2013-04-05 05:52:47.283
Active 008411 NH/STPF-0000(635) 012 Us12 Scr Region-Wide Safety Construction Ahead, Inc. Dba $376,897.75 MOE DAVARI SC 01/24/13 01/28/13 02/09/13     $397,257.50 $376,897.75 $0.00 30 30 17 012, 014, 097, 127, 129, 241, 261 Design Bid Build 2013-04-05 05:52:47.283
Active 008413 NH-0101(162) 101 Us101 Ennis St Signal Rebuild Rebuild Signal Taurus Industries Inc 1036 73rd Ave Se $256,646.00 JERRY MOORE OR 02/06/13 02/11/13 03/04/13     $281,510.00 $256,646.00 $0.00 30 0 0 101 Design Bid Build 2013-04-05 05:52:47.283
Active 008415 HSIP0026(026) 026 Sr26 Othello @1st St Ph 2 Phase 2 Granite Construction Company $1,043,493.44 Not Specified NC 02/21/13 02/25/13 03/18/13     $1,107,984.40 $1,043,493.44 $0.00 35 0 0 026 Design Bid Build 2013-04-05 05:52:47.283
Active 008417 STATE 017 Ncr Ada Rural Upgrades Sr 017, 028 Halme Builders, Inc. $169,178.00 ROBERT ROMINE NC 02/14/13 02/19/13 03/11/13     $175,199.50 $169,178.00 $0.00 25 25 25 017, 028 Design Bid Build 2013-04-05 05:52:47.283
Active 008422 IM0052209 005 Maytown-Scatter Creek Roof & Skylight Replacement DW Not Applicable $169,186.00 Not Specified HQ 02/27/13 03/04/13 03/25/13     $186,374.00 $169,186.00 $0.00       005 Design Bid Build 2013-04-05 05:52:47.283
Active 008424 CBI0097158 097 North Of Brewster Passing Lane DW Not Applicable $979,499.91 Not Specified NC 03/07/13 03/13/13 04/02/13     $1,105,122.35 $979,499.91 $0.00       097 Design Bid Build 2013-04-05 05:52:47.283
Active 008429 ITS2003062 014 Traveler Information Enhancements Phase Ii DW Not Applicable $146,654.00 Not Specified SW 03/06/13 03/21/13 04/02/13     $168,804.00 $146,654.00 $0.00       014, 197 Design Bid Build 2013-04-05 05:52:47.283