Skip Top Navigation

Budget Information

  • Sorry. We are unable to display the budget information at this time.

US 97 - South of Tonasket - Bridge Deck Repair - Complete July 2009

Project Status - Complete
Click to enlarge
View entire map
This project rehabilitated the deck on the Janis Bridge over the Okanogan River (MP 310.6 to .7).



Click to enlarge
View entire photo
(After) This is what the new bridge deck looked like on Friday, July 24, 2009 when the highway was reopened to traffic.

Overview
This structure preservation project refurbished the Janis Bridge deck on US 97 over the Okanogan River, four miles south of Tonasket. The bridge was constructed in 1957. The original deck concrete was cracked and spalling exposed the reinforcing steel. Deck repair and overlay were necessary to preserve this bridge deck.

How You Benefit
Cross GlyphImproves Safety
A new concrete overlay was applied to the bridge deck providing a smoother, safer ride.
Dollar Sign Glyph Economic Incentive
This project preserves bridge life while minimizing maintenance costs.

Partnerships & Cooperation

Funding

Contact Us
Project Engineer Ken Olson
WSDOT Eastern Region Project Office
2714 North Mayfair Street
Spokane, Wa 99207-2090
Phone: 509-324-6140
E-mail: olsonk@wsdot.wa.gov

back to top