US 97 - North of Blewett Pass - Unstable Slope - Complete September 2009

Project Status - Complete
Select to enlarge
View entire map This project is located halfway between the Blewett Pass summit and the US 2/97 junction east of Peshastin in Chelan County.


Overview
This Highway Capital Preservation Program project stabilized the slope above US 97 at Milepost 174.6, ten miles north of Blewett Pass and ten miles south of the Big Y junction with US 2 in Chelan County.

How You Benefit
Cross GlyphImproves Safety
Stability of this rock slope has been increased, providing safer driving conditions on US 97.
Dollar Sign Glyph Economic Incentive
Less rockfall clean up and fewer pavement repairs reduces maintenance costs.

Partnerships & Cooperation

Funding

Contact Us
Kevin Waligorski, Project Engineer
WSDOT North Central Region
2830 Euclid Ave. Building A
P.O. Box 98
Wenatchee, WA 98807-0098
Phone: (509) 667-2860 or toll free (888) 461-8816
E-mail: waligok@wsdot.wa.gov

back to top