US 97 - Eight miles south of US 2 Intersection - Unstable Slope - Compete September 2009

Project Status - Complete

View entire map This slope above US 97 at MP 176.8 is 13 miles north of Blewett Pass and 8 miles south of the Big Y junction with US 2 in Chelan County.


View entire photo Unstable rock breaks loose and sometimes lands on the roadway creating a safety hazard.

Overview
This project stabilized an unstable slope above US 97 north of Blewett Pass in Chelan County, reducing the number of rockfall incidents in this area.

How You Benefit
Cross GlyphImproves Safety
Reduces the potential for loose rocks to fall onto the roadway.
Dollar Sign Glyph Economic Incentive
In addition to the safety benefit of reducing potential rock fall the cost of cleaning up fallen rock and repairing pavement damage is also reduced.

Partnerships & Cooperation

Funding

Contact Us
Kevin Waligorski, Project Engineer
WSDOT North Central Region
1551 N. Wenatchee Ave.
P.O. Box 98
Wenatchee, WA 98807-0098
Phone: (509) 667-2860 or toll free (888) 461-8816
E-mail: waligok@wsdot.wa.gov

back to top