View entire map A new turn lane will be built at the Barber Road intersection with US 97 at MP 221 in Douglas County.
View entire photo - Before - A new turn lane will be built at the Barber Road intersection with US 97.
Winter 2013
This project was advertised for private contractor bids Nov. 5, 2012. Four bids were opened on Nov. 29. On Dec. 12, Contract #8392 was awarded to Selland Construction, Inc. for $277,055.00, 28% below the engineering estimate. Construction is scheduled in 2013.
An email subscription list has been set up for this project and other activities on this section of US 97 -
US 97 Blewett to Chelan.
This I-2 Highway Capital Improvement - Collision Prevention Safety Project will install a turning lane on US 97 at Barber Road in Douglas County.
Why is WSDOT
upgrading this intersection?
This project is to reduce the frequency and severity of traffic conflicts and improve mobility. Due to increased development that has increased traffic in the area served by Barber Road, a Northbound turn lane will be added in addition to the existing southbound right turn pocket. The road will be widened, new illumination and pavement markings will be installed, and slope flattening will improve visibility.
The End Result
Traffic will have a safe place to wait, outside the through lanes, improving mobility and reducing the potential for rear end and T-bone collisions.
Project Benefits
The new left turn Lane will seperate turning traffic from the mainline through traffic, decreasing traffic conflicts.
What is the project timeline?
Construction is scheduled in 2013. The project is expected to require 25 working days.
Financial Information
Project signage will reflect the cost of construction engineering, project bid award and sales tax.
| Financial Data for PIN 209700H |
| Funding Source |
Amount ($ in thousands) |
| 2003 Gas Tax (Nickel Funding) |
$0 |
| 2005 Gas Tax (TPA) |
$0 |
| Pre-Existing Funds (PEF) |
$456 |
| Total |
$456 |
|
This project was advertised for private contractor bids Nov. 5, 2012. Four bids were opened on Nov. 29. On Dec. 12, Contract #8392 was awarded to Selland Construction, Inc. for $277,055.00, 28% below the engineering estimate.
The project is funded through the following sources:
- Pre-existing Gas Tax - $457,000
- Total Funding from all sources - $457,000
How can I get more information?
Contact:
Bob Romine, Project Engineer
WSDOT North Central Region
2830 Euclid Avenue
Wenatchee, WA 98801-5916
Phone: (509) 667-2880 or toll free (888) 461-8816
Email: rominer@wsdot.wa.gov