Skip Top Navigation

Budget Information

  • Sorry. We are unable to display the budget information at this time.

US 395 - SR 292 Junction to Colville-Centerline Rumble Strips - Complete June 2010

Status

June 2010

  • Weekly Construction Update  
  • Complete.
  • Construction on hold until spring 2010.
  • Also includes US 195 from Dry Creek Road to Spangle and the full length of SR 902 (excluding the City of Medical Lake.)

Why is WSDOT installing rumble strips?
Centerline rumble strips are a proven low-cost method of dramatically reducing cross-over collisions by alerting inattentive drivers when they are crossing into oncoming traffic.

The End Result
Safer sections of US 395, US 195, and SR 902..

Project Benefits

  • Safety. Reduces cross-over collisions and resulting injuries and fatalities.
  • Jobs. Supports an estimated 30 construction-related jobs.

What is the project timeline?
This project will be built in 2009.

Financial Information

  • Federal Funding - $75,000-$125,000
  • Total funding from all sources - $150,000-$250,000

How can I get more information?
Contact:
Project Engineer:
Bob Hilmes , P.E.
WSDOT Project Office
2714 N. Mayfair
Spokane, WA 99207
Phone: (509) 324-6231
E-mail: hilmesb@wsdot.wa.gov

back to top