US 395 - NSC - US 2 Lowering

Status

November 2009

  • Weekly Construction Update.
  • Under Construction.
  • US 2 speed limit has been reduced to 45 mph.  Southbound US 2 is now reduced to one lane.  Wide loads are now restricted.
  • Awarded to Graham Construction & Management of Spokane with a construction bid of $42,849,073.

This contract will lower US 2 between Farwell Road and Deadman Creek, construct six bridges and multiple retaining walls for the NSC/US 2 Interchange, and complete the mainline paving through the interchange. The contract also includes the construction of a frontage
road system along US 2 and a culvert for Deadman Creek..

Why is WSDOT Lowering US 2 and building these bridges?
Lowering the grade of US 2 and building the bridges will create the full interchange for the North Spokane Corridor.

The End Result
A full connection between these two major highways.

Project Benefits
Improved freight and passenger vehicle mobility for north/south traffic in the Spokane area.

What is the project timeline?
The job is currently under construction and is slated to open to traffic in 2011.

Financial Information

  • State Funds for construction - $42,849,073
  • Total funding Available From All Sources - $42,849,073
  • How can I get more information?