The intersection of US 395 and Hastings
Road was badly rutted primarily due to starting, stopping, and turning movements of large vehicles. This project replaced the existing Asphalt Pavement at the US 395 (Division Street)/Hastings Road Intersection with Portland Cement Concrete Pavement (PCCP). Approximately 40,000 vehicles pass through this intersection each day.
 | Improves Safety
New ADA ramps make the intersection safer for pedestrians.
|
 | Economic Incentive
The new concrete pavement surface will resist rutting, provide a longer service life, and provide a better driving surface for transit, freight, passenger vehicles, and bicyclists.
|
Partnerships & Cooperation
The Washington State Department of Transportation, Spokane County and Spokane Transit Authority have partnered together to provide funding for this project.
Funding
This project was funded through the following sources:
• State Gas Tax - $29,000
• Local Funds - $2,000
• Federal Funds - $1,179,000
• Total Funding Available from all sources - $1,210,000.