The existing concrete pavement panels have shifted creating a rough roadway. In addition, the asphalt pavement sections are due for resurfacing. Southbound US 195 was done in 2003.

Steel dowel bars were placed between the concrete panels to stop further movement. The concrete surface was then smoothed using a grinder. The existing asphalt sections was resurfaced.

How You Benefit
Dollar Sign Glyph Economic Incentive
This project will create a smoother roadway and preserve the existing concrete panels on northbound US 195.  Asphalt resurfacing protects the underlying roadway structure.

Partnerships & Cooperation
At WSDOT we seek to address the concerns of the tribal nations using the process outlined in Section 106 of The National Historic Preservation Act and the WSDOT Tribal Consultation Policy adopted in 2003 by the Transportation Commission as part of the WSDOT Centennial Accord Plan.

Funding

This project is funded through the following sources:

•State Gas Tax- $86,000

Federal Funds - $5,679,000
• Total Funding Available
from all sources - $6.127 Million.