Overview
Us 195 south of Colfax was resurfaced with Hot Mix Asphalt. Also, a short section of Main Street in Colfax was rebuilt to repair the base layer of gravel.
 | Economic Incentive
The new surface extends the roadway life, preserving the public's investment.
|
Partnerships & Cooperation
WSDOT seeks to address the concerns of tribal nations using the process outlined in section 106 of The National Historical Preservation Act and the WSDOT Tribal Consultation Policy adopted in 2003 by the Transportation Commission as part of the WSDOT Centennial Accord Plan.
Funding
| 2003 Gas Tax (Nickel Funding) |
$0 |
| 2005 Gas Tax (TPA) |
$0 |
| Pre-Existing Funds (PEF) |
$2,786 |
| Total |
$2,786 |