Overview
This project replaced two structurally deficient bridges across the Tieton River with two wider and longer bridges.  The new bridges are 32 feet wide, providing 12 foot lanes and four foot shoulders.  WSDOT and the contractor also moved the roadway between the two new bridges away from unstable slopes to reduce the risk of rockfall on the roadway.

How You Benefit
Cross GlyphImproves Safety
The new, wider bridges have improved safety.  Rockfall risks are reduced and visibility has improved through realignment of the roadway.
Leaf Glyph Protects Environment
WSDOT and the contractor improved the natural flow of the river by removing the piers from the river.  The new single span bridges did not require construction in the river.

Partnerships & Cooperation
We appreciate the patience and understanding of motorists as crews worked to provide safer bridges over the Tieton River. 

Construction was completed September 2010.

Funding

This project was funded through the following sources:

State Funding (2005 Transportation Partnership Account) - $2,162,000
Federal Funding (Pre-Existing Funds) - $9,143,000
State Funding (Pre-Existing Funds) - $153,000
Local Funds - $174,000
Total Funding Available from All Sources - $11,632,000

Contact Us
Project Engineer, Paul Gonseth
P.O. Box 12560
Yakima, WA 98908
509.577.1810

Communications Manager, Mike Westbay
P.O. Box 12560
Yakima, WA 98908
509.511.1617

back to top