Overview
This project covered a four-mile stretch of US 12 from Joselyn Street SW to I-5 in Thurston County. This section was projected to drop below the adopted standards for pavement condition. By overlaying the existing roadway with hot mix asphalt, the pavement condition rating increased to within the adopted standards. The project was completed Oct. 2007.
 | Improves Safety
Safety improvements made to the roadway include pavement repair, new hot mix asphalt, guardrail updates, striping, signing, delineation, and shoulder finishing.
|
 | Protects Environment
WSDOT is committed to preserving the environment, and made every effort to assess and minimize environmental impacts on this projects. A detailed analysis of the projects environmental impacts has been completed.
Please visit the WSDOT Environmental Services Web site for more information.
|
Partnerships & Cooperation
Funding
Federal Toll and State Bond Funding:
$1,165,238.
Contact Us
John McNutt, Project Engineer
WSDOT Tumwater Project Engineer Office
PO Box 47447
Tumwater, WA 98504-7477
Phone: (360) 570-6750
Email: McNuttJ@wsdot.wa.gov