US 101 - Sunnyside Road Vicinity - Slope Stabilization - Complete November 2007

Overview
This section of US 101 was closed in November 2006 when record rainfall caused a debris slide.

We placed a soldier pile barrier wall parallel to US 101 to restrain future debris slides and improve safety. US 101 provides vital access to the Hood Canal area and the Olympic Peninsula for Washington residents and visitors.

How You Benefit
Cross GlyphImproves Safety
A new soldier pile wall will serve as a debris catcher for future slides.

By reducing the threat of slides and delays, the route will be safer and more reliable.

Partnerships & Cooperation
Communication with the public was provided through the Mason County Journal and the WSDOT Web site.

Funding

This project was funded through FHWA emergency funding and federal and state bonds.

Contact Us
John McNutt, Project Engineer
WSDOT Tumwater Project Office
821 Airport Court SE
PO Box 47447
Tumwater, WA 98501-6805

Phone: 360-570-6750

Email: McNuttJ@wsdot.wa.gov

back to top