February 2012
This project is scheduled to advertise for construction bid in March 2012.
Why is WSDOT
doing this seismic retrofit?
This project modifies the columns supporting the State Route 8 overpass to improve seismic stability and reduce the risk of catastrophic failure.
The End Result
The support columns will be strengthened to reduce the risk of failure in the event of an earthquake.
Project Benefits
- Improves seismic stability.
- Reduces the risk of failure.
- Enhances safety for motorists.
What is the project timeline?
This project is scheduled to advertise for construction bid in March 2012.
Financial Information
The design and construction of this project are funded through existing funds.
- Existing Funds - $1,390,449
- Total Funding From All Sources - $1,390,449
How can I get more information?
Contact:
Dennis Engel, Project Engineer
WSDOT Tumwater Project Engineer Office
PO Box 47447
Tumwater, WA 98504-7477
Phone: 360-570-6750