SR 536 / SR 538 - Paving - Complete August 2009

Overview
Significant volumes of traffic on Memorial Highway (SR 536) and College Way (SR 538) had damaged both roadways.

WSDOT repaved a five-mile stretch of Memorial Highway from SR 20 to the Skagit River and upgraded sidewalk ramps at several intersections. 

WSDOT also repaved a section of College Way from I-5 to the railroad tracks (just east of Urban Ave.), replaced the asphalt at the Riverside Drive intersection with concrete and upgraded sidewalk ramps at intersections.

How You Benefit
Cross GlyphImproves Safety
Drivers get a smoother, safer ride. Sidewalk ramps have been improved to meet ADA standards.
Dollar Sign Glyph Economic Incentive
Repaving the roadways reduces maintenance costs and preserves the highways.

Partnerships & Cooperation
WSDOT worked with the city of Mount Vernon and local businesses to provide access and detour routes during construction.

Funding

This project is funded through the following sources:

  • SR 536 existing funds: $3.2 million
  • SR 538 existing funds: $2.5 million

Total funding available from all sources: $5.7 million

Contact Us
Communications Dave Chesson
WSDOT Mt. Baker Headquarters
1043 Goldenrod Road, Suite 101
Burlington, WA 98233-3415
Phone: 360-757-5970
E-mail: chessod@wsdot.wa.gov

or

Project Construction Engineer Dave Crisman
1109 E. Hickox Road
Mount Vernon, WA 98274
Phone: 360-848-7103
E-mail: crismad@wsdot.wa.gov

back to top