Deteriorating pavement on SR 518
Pavement on SR 518 in Tukwila was deteriorating rapidly and needed a facelift. See more photos.

WSDOT contractor crews repaved a section of SR 518 from 24th Avenue S. to the I-5 interchange after the pavement showed signs of wear.

The deep wheel ruts and cracked pavement are now gone, replaced with new pavement which will extend the life of the highway as well as give drivers a smoother and safer trip.

The ramps in the project area were also repaved for a smoother transition from one highway to another.

How You Benefit
Cross GlyphImproves Safety
The busy stretch of highway and ramps have new pavement, giving drivers a smoother and safer trip.
Dollar Sign Glyph Economic Incentive
New pavement will cut down on the cost of maintenance by reducing the risk of costly emergency work to fill potholes and repair cracks.

Partnerships & Cooperation


Financial Data for PIN 151804B
Funding Source Amount ($ in thousands)
2003 Gas Tax (Nickel Funding) $0
2005 Gas Tax (TPA) $0
Pre-Existing Funds (PEF) $2,359
CWA $0
Total $2,359