This project will pave State Route 27 from 32nd Avenue to the vicinity of Mansfield Avenue, then make repairs and crack seal from Mansfield to Trent Avenue (SR 290).
Why is WSDOT
paving this highway?
This project preserves the roadway by milling (grinding down) and repaving SR 27 from 32nd to Mansfield then repairing and crack-sealing the existing asphalt from Mansfield to Trent.
The End Result
Upgrades the structural integrity and extends the life of the roadway.
Project Benefits
Paving upgrades the structural integrity and extends the roadway life. Crack-sealing prevents water from infiltrating the underlying roadway.
What is the project timeline?
Construction will be underway and complete in the 2013 season.
Financial Information
Project signage will reflect the cost of construction engineering, project bid award and sales tax.
| Financial Data for PIN 602708F |
| Funding Source |
Amount ($ in thousands) |
| 2003 Gas Tax (Nickel Funding) |
$0 |
| 2005 Gas Tax (TPA) |
$0 |
| Pre-Existing Funds (PEF) |
$3,115 |
| Total |
$3,115 |
|
How can I get more information?
Contact:
Chad Simonson, Project Engineer
WSDOT Eastern Region
2714 N. Mayfair
Spokane, WA 99207
509-324-6250
simonsc@wsdot.wa.gov