Overview
Stream flows eroded the bridge footings. If allowed to continue, the bridge structure could have been at risk. The eroded footings were repaired and a rock barrier was added to prevent further erosion.
 | Improves Safety
The work will extend the useful life of the bridge and enhance safety with the repaired structure.
|
Partnerships & Cooperation
At WSDOT we seek to address the concerns of the tribal nations using the process outlined in Section 106 of The National Historic Preservation Act and the WSDOT Tribal Consultation Policy adopted in 2003 by the Transportation Commission as part of the WSDOT Centennial Accord Plan.
Funding
This project is funded through the following sources:
Federal Funds - $37,600
Total Funding From All Sources - $37,600