Tower Construction
Gig Harbor and Tacoma towers rose rapidly once crews capped off the caissons
(bridge foundations) in the summer of 2004. Last August, tower construction
began in earnest, and a mere 10 months later the concrete pours on the sentinel-like
structures were finished. Both towers exceeded the 500-foot mark in early June
2005. The final elevation of the towers is 510 feet above sea level, which includes
the six-foot cable saddle atop the tower legs. One key difference between the
new and existing bridge is that the new towers are constructed from reinforced
concrete instead of steel. The new tower legs are hollow box structures that
taper in width from the top to the bottom. Over the course of the project, and
in order to accommodate the ever-growing towers, the tower crane was raised
three times - to an ultimate height of 600-plus feet above water.