Nighttime noise construction information, (253) 620-4440
Contact the TNB Office, 1 (877) 762-7769
|
|
|
 |
|
Lisa Murdock
Olympic Region Communications Manager
(360) 357-2789
WSDOT Olympic Region
(360) 357-2600
Contact us and tell us
what you think:
orfeedback@wsdot.wa.gov or
Online Bridge Form
WSDOT
3214 50 Street Court NW, Building D, Suite 302
Gig Harbor, WA 98335
TNC
2110 14th Ave. NW
Gig Harbor, WA 98335
|
|
|
|
 |
 |
 |
Tacoma Narrows Bridge Photo Album
Caisson Float Out - July and August 2003
Click on any thumbnail for enlarged image and description.
Caisson Construction & Touchdown
Construction photos from the two caisson sites.
Removing Air Domes - February and April 2004
Between February and April 2004, divers used cutting torches to remove the
steel roofs from the 30 airtight chambers (air domes) at the bottoms of the
tower foundations also called "caissons." The domes needed to be removed in
order for cranes to dig beneath the caissons, remove soil until the foundations
reached their final elevation. During caisson construction and prior to touch
down, the 15 air domes kept each foundation both water tight and afloat. The
steel domes measure 22-feet square each and were removed under roughly 140 feet
of water.