Washington State Department of Transportation
WSDOT NewsSite IndexContact WSDOTWSDOT Home
Traffic & RoadsProjectsBusinessEnvironmentalMaps & Data
Tacoma Narrows Bridge Project

Project Info
•  

Project Home

•  

Bridge Open

•  

Building the Bridge

•  

Finance & Schedule

•  

History & More

•  

Just the Bridge Facts

»  

Photo Album

•  

Tolls: Good To Go!

•  

Traffic Information

•  Building the New Tacoma Narrows Bridge
TNB Tolling


•  Nighttime noise construction information, (253) 620-4440
•  Contact the TNB Office, 1 (877) 762-7769

Contact us

Lisa Murdock
Olympic Region Communications Manager
  (360) 357-2789
WSDOT Olympic Region
  (360) 357-2600
Contact us and tell us
what you think:
orfeedback@wsdot.wa.gov or
Online Bridge Form

WSDOT
3214 50 Street Court NW, Building D, Suite 302
Gig Harbor, WA 98335

TNC
2110 14th Ave. NW
Gig Harbor, WA 98335


» Unsubscribe


Tacoma Narrows Bridge Photo Album

Caisson Float Out - July and August 2003

Click on any thumbnail for enlarged image and description.

Tacoma Narrows Bridge caisson float out Tacoma Narrows Bridge caisson float out Tacoma Narrows Bridge caisson float out Tacoma Narrows Bridge caisson float out Tacoma Narrows Bridge caisson float out
Tacoma Narrows Bridge caisson float out

Caisson Construction & Touchdown

Construction photos from the two caisson sites.

Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down
Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down
Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down Tacoma Narrows Bridge caisson construction and touch down

Removing Air Domes - February and April 2004

Between February and April 2004, divers used cutting torches to remove the steel roofs from the 30 airtight chambers (air domes) at the bottoms of the tower foundations also called "caissons." The domes needed to be removed in order for cranes to dig beneath the caissons, remove soil until the foundations reached their final elevation. During caisson construction and prior to touch down, the 15 air domes kept each foundation both water tight and afloat. The steel domes measure 22-feet square each and were removed under roughly 140 feet of water.

Click on any thumbnail for enlarged image and description.

Tacoma Narrows Bridge air dome removal Tacoma Narrows Bridge air dome removal Tacoma Narrows Bridge air dome removal Tacoma Narrows Bridge air dome removal

« Back to Previous Page



  Copyright WSDOT © 2005

    Traffic & Roads | Site Index | Contact WSDOT | WSDOT Business | WSDOT Home