Tacoma Narrows Bridge Project - Animations
Virtual Bridge Construction
Step inside the world of virtual bridge construction. The following video simulations
reveal the completed parallel span and show the construction of major parts of
the new bridge.
NEW: Deck Transfer From Ship to Barge
Before any of the 46 deck sections can be lifted into place along profile of
the new bridge, crews must transfer individual blocks that average 78-feet wide
by 120-feet long from the ship SWAN to the barge MARMAC. In this footage, the
first deck section that weighs 488
tons and measures 116-feet long is being lifted and placed on the barge. File
is in MPEG format, 4.3 megabytes and is zipped. Click to begin
download. (Images used to compile this clip
are courtesy of Gerry Collen, Gig Harbor)
Download times:*
56k modem - 10 minutes
DSL - less than 1 minute
Cable - less than 1 minute
Touring the News Tacoma Narrows Bridge
Fly over the twin Narrows bridges, visit the Narrows seabed and drive across
the new bridge. File is in MPEG format, 11.4 megabytes and is zipped. Click
to begin download.
Download times:*
56k modem - 28 minutes
DSL - 2 minutes
Cable - 1 minute
Caissons: Building Skyscrapers Under Water
Observe the labor-intensive process crews underwent to build caissons, the bridge
foundations. Watch "skyscrapers" being build under water. File is
in MPEG format, 34.2 megabytes and is zipped. Click to begin
download.
Download times:*
56k modem - 120 minutes
DSL - 5 minutes
Cable - 2 minutes
Towers: Puget Sound Sentinels
Watch the new towers as they rise to their 510-foot height. The four bridge
legs of the two towers ascend in a matter of minutes as compared to the 11 months
that it actually took. File is in MPEG format, 43.4 megabytes
and is zipped. Click to begin download.
Download times:*
56k modem - 133 minutes
DSL - 6 minute
Cable - 3 minute
Suspension System: Spinning Cable Wire
Watch as a spinning wheel ferries cable wire back and forth from the Tacoma
shoreline over the tower tops to the Gig Harbor anchorage and back again. File
is in MPEG format, 19.4 megabytes and is zipped. Click to begin
download.
Download times:*
56k modem - 44 minutes
DSL - 2 minute
Cable - 1 minute
Deck Assembly
The 46 separate sections of the new bridge deck arrive in the Tacoma Narrows
and are pieced together. File is in MPEG format, 31.4 megabytes
and is zipped. Click to begin download.
Download times:*
56k modem - 119 minutes
DSL - 5 minute
Cable - 2 minute
* All times are approximate