Overview
SR 7, SR 165, SR 507 and SR 510 had a history of run-off-the-road collisions that resulted in injuries and fatalities. This project reduced the severity of these collisions through a number of roadway improvements.
 | Improves Safety
Project improvements included installing guardrail, slope flattening, tree removal, stump grinding, new striping, and rumble strips.
|
Partnerships & Cooperation
Funding
2005 Gas Tax (Partnership Funding) = $1 million for both Preliminary Engineering and Construction combined.
Contact Us
John McNutt, Project Engineer
WSDOT Tumwater Project Engineer Office
PO Box 47447
Tumwater, WA 98504-7477
Phone: (360) 570-6750
e-mail: McNuttJ@wsdot.wa.gov
back to top