Skip Top Navigation

North Central Region - ADA Rural Upgrades

Design work is underway
 click to enlarge
View entire map
to see the locations where ADA improvements are being constructed.

click to enlarge View entire photo - Before - This out of date ADA Ramp in Omak is being brought up to current standards.

click to enlarge
View entire photo
- Before - This ramp at Blue Lake Rest Area is out of date.

click to enlarge
View entire photo
- Before - More ADA parking and a ramp are being installed at this Vista Overlook near Vantage.

Status

Spring 2012

This project is being advertised for private constractor bids on June 25, 2012, with the bid opening scheduled in July.

This I-2 Safety Improvement project replaces sidewalks, ramps, and other pedestrian access features in the North Central Region, along state highways, but outside cities, in order to meet current Federal and State Americans with Disabilities Act (ADA) standards.

Why is WSDOT upgrading ADA facilities?

ADA non compliant parking, ramps, sidewalks and highway crossings limit accessibility to pedestrians with disabilities.

Improvements are being made at the following locations:

  • Omak Area - Upgrading ADA ramps and rebuilding island at SR 215/SR 97
  • Manson Area - Improving mid-block crossing and replacing ADA ramps
  • Blue Lake Rest Area - Replacing ADA ramp
  • East Wenatchee Area - Replacing ADA ramps.
  • Quincy Rest Area - Replacing ADA ramps and sidewalk.
  • Moses Lake Area - Improving access to existing pedestrian push button poles.
  • Vantage Vista Areas - placing new ADA ramps, replacing sidewalk and adding ADA ramps and parking spots.

The End Result
This project will bring out of date ADA facilities up to current Federal Standards, including wheel chair curb ramps, sidewalks and making pedestrian crossing push buttons more accessible.

Project Benefits

For those with disabilities:

  • Improved accessibility
  • Improved safety features

For taxpayers:

  • Reduced liability

What is the project timeline?
This project is being advertised for private constractor bids on June 25, 2012, with the bid opening scheduled in July.

Financial Information

Pre Existing gas tax funds - $1.6 million

Total from all sources - $1.6 million

How can I get more information?
Contact:
Bob Romine, Project Engineer
WSDOT North Central Region
P.O. Box 98
Wenatchee, WA 98807
Phone: (509) 667-2880 or toll free (888) 461-8816
Email: rominer@wsdot.wa.gov